USPTO Art Unit 3633 Prosecution Statistics

Recent Applications

Detailed information about the 100 most recent patent applications.

Application NumberTitleFiling DateDisposal DateDispositionTime (months)Office ActionsRestrictionsInterviewAppeal
19086361Panel Interconnectable With Similar Panels for Forming a CoveringMarch 2025May 2025Allow210NoNo
19086399Panel Interconnectable With Similar Panels for Forming a CoveringMarch 2025June 2025Allow310NoNo
19042553SELF-GRIPPING, NO-SLIP REBAR COUPLERJanuary 2025June 2025Allow510YesNo
19042499REINFORCED PORCELAIN PANEL PRODUCT FOR ENHANCED STRUCTURAL PROTECTIONJanuary 2025May 2025Allow410NoNo
19013548REINFORCED PORCELAIN PANEL PRODUCT KIT FOR SHOWER INSTALLATIONJanuary 2025March 2025Allow210NoNo
19013292REINFORCED PORCELAIN PANEL PRODUCT FABRICATION METHODS FOR ENHANCED STRUCTURAL PROTECTIONJanuary 2025March 2025Allow210NoNo
19010431PORCELAIN BOARD TILE ASSEMBLIES, SYSTEMS, AND METHODS FOR SURFACE INSTALLATIONSJanuary 2025June 2025Allow520NoNo
18986388Floor Board and Method for Manufacturing Such Floor BoardsDecember 2024June 2025Allow610NoNo
18985386FLOORBOARD WITH COUPLING STRUCTUREDecember 2024June 2025Allow620NoNo
18983887SAFETY RECOVERY SUPPORT FIXTUREDecember 2024February 2025Allow200NoNo
18968908Mailbox Post Protector With Internal Toolless InterlockDecember 2024April 2025Allow410NoNo
18954662POWER SYSTEM FOR ROLLER APPARATUS AND ROLLER APPARATUSNovember 2024April 2025Allow510NoNo
18950588Decorative Panel, and Decorative Floor Covering Consisting of Said PanelsNovember 2024April 2025Allow510NoNo
18949344PHOTOVOLTAIC SHINGLES WITH MULTI-MODULE POWER ELECTRONICSNovember 2024May 2025Allow610NoNo
18948975ROOFING MATERIALS HAVING A WATER CHANNEL AND AN ATTACHMENT TAB AND METHODS OF MAKING AND INSTALLING THEREOFNovember 2024July 2025Allow710NoNo
18927132ROOFING SYSTEMS WITH WATER INGRESS PROTECTIONOctober 2024March 2025Allow510NoNo
18906521Window Ventilation and Insert ArrangementOctober 2024March 2025Allow510NoNo
18902140REINFORCED PORCELAIN PANEL MAGNETIC ASSEMBLIES, SYSTEMS, AND METHODS FOR SHOWER INSTALLATIONSSeptember 2024June 2025Allow920NoNo
18902190REINFORCED PORCELAIN PANEL PRODUCT KIT FOR SHOWER INSTALLATIONSeptember 2024January 2025Allow311NoNo
18902163PORCELAIN BOARD TILE ASSEMBLIES, SYSTEMS, AND METHODS FOR SURFACE INSTALLATIONSSeptember 2024December 2024Allow300NoNo
18902097REINFORCED PORCELAIN PANEL PRODUCT FOR ENHANCED STRUCTURAL PROTECTIONSeptember 2024January 2025Allow411NoNo
18902121REINFORCED PORCELAIN PANEL PRODUCT FABRICATION METHODS FOR ENHANCED STRUCTURAL PROTECTIONSeptember 2024January 2025Allow311NoNo
18894696CFRP CONCRETE COMPOSITE COMPONENT WITH PARTITIONED CATHODIC PROTECTION AND OPERATION AND MAINTENANCE METHOD THEREOFSeptember 2024December 2024Allow200YesNo
18849489A FLASHING DEVICE AND A METHOD OF MOUNTING A FLASHING DEVICE AT A ROOF WINDOWSeptember 2024June 2025Allow910YesNo
18830178High-Capacity Beam And Modular Grid Shoring SystemsSeptember 2024February 2025Allow510YesNo
18824809HVAC EQUIPMENT SCREENING SYSTEMSSeptember 2024March 2025Allow610NoNo
18821454REINFORCED PORCELAIN PANEL PRODUCT AND ASSOCIATED METHODS FOR ENHANCED STRUCTURAL PROTECTIONAugust 2024January 2025Allow410NoNo
18819306STEP FLASHING AND MOISTURE BARRIER ASSEMBLY AND METHOD THEREFORAugust 2024January 2025Allow510NoNo
18806416RESILIENT SLIP FRICTION JOINTAugust 2024March 2025Allow710YesNo
18796909ROOFING MEMBRANE AND ASSOCIATED ROOFING SYSTEM AND METHODAugust 2024February 2025Allow610NoNo
18794663SUPPORT STRUCTURE FOR FLOOD BARRIER PANELSAugust 2024September 2024Allow200NoNo
18793511METHOD AND APPARATUS FOR A MOBILE HOTEL ROOMAugust 2024May 2025Abandon910NoNo
18793278Fiber Board Providing Rigidity, Sound Reduction, and Thermal InsulationAugust 2024January 2025Allow610YesNo
18792633HONEYCOMB DECOUPLING SHEETAugust 2024November 2024Allow300NoNo
18786072BUILDING WITH INTEGRATED ENERGY GENERATION AND STORAGEJuly 2024May 2025Abandon1010NoNo
18777853AUTOMATIC LEVELING CARBON FIBER REINFORCED POLYMER (CFRP) PLATE PRE-STRESSING AND TENSIONING DEVICES FOR CURVED SURFACE STRUCTURESJuly 2024December 2024Allow510NoNo
18777087SAFETY WINDOW COVER FOR WINDOW INSTALLATIOJuly 2024November 2024Allow400NoNo
18771122ROOFING SHINGLES, AND BUNDLE OF ROOFING SHINGLESJuly 2024January 2025Allow710YesNo
18728071TELESCOPIC MAST WITH BUILT-IN BELT ROPESJuly 2024October 2024Allow300NoNo
18763482CONNECTION OF PRECAST CONCRETE PANELS AND WALLS USING NEAR SURFACE MOUNTED BARSJuly 2024April 2025Allow920NoNo
18761214DEPLOYABLE LABORATORY ENVIRONMENTJuly 2024September 2024Allow300NoNo
18757451ROOF SYSTEMJune 2024October 2024Allow400NoNo
18750162COMPOSITE STRUCTURAL ELEMENT, A STRUCTURE INCLUDING THE COMPOSITE STRUCTURAL ELEMENT, AND A METHOD OF FORMING THE COMPOSITE STRUCTURAL ELEMENTJune 2024March 2025Allow920NoNo
18749182MODULAR WALL PANEL WITH INTEGRATED CHANNELSJune 2024March 2025Allow920NoNo
18746400HYBRID SOLAR PANEL MOUNTING ASSEMBLYJune 2024December 2024Allow610YesNo
18746209ROOFING MATERIALS WITH SYNTHETIC ROOFING GRANULES AND METHODS OF MAKING THEREOFJune 2024March 2025Allow900NoNo
18721200MOTORIZED BARRIER DEVICESJune 2024October 2024Allow400NoNo
18720670PREFABRICATED INFILLED PANEL-FRAME STRUCTURE CAPABLE OF ACCOMMODATING SEISMIC LOADING AND SEISMIC ENERGY DISSIPATION, AND CONSTRUCTION METHODJune 2024November 2024Allow500NoNo
18742864Modular Weight StationJune 2024July 2025Allow1310NoNo
18740535VARIABLE FRICTION ENERGY DISSIPATION PREFABRICATED SEISMIC-DAMPING PARTITION WALL-FRAME STRUCTURE AND CONSTRUCTION METHOD THEREFORJune 2024September 2024Allow300NoNo
18737967DROP IN FIRE STOP ASSEMBLYJune 2024April 2025Allow1010NoNo
18737941Environmentally Friendly Reusable Structure for Use in ConstructionJune 2024November 2024Allow610YesNo
18736336BARRIER SYSTEMS FOR BUILDING STRUCTURES AND RELATED METHODSJune 2024March 2025Allow911NoNo
18734450BUILDING STABILIZATION SYSTEMJune 2024September 2024Allow310YesNo
18733753SYSTEM AND METHODS EMPLOYING PREFABRICATED VOLUMETRIC CONSTRUCTION MODULES INCLUDING TRANSFORMING TRUSS ELEMENTSJune 2024February 2025Allow910NoNo
18731470CLEAR VIEW PANEL FOR OVERHEAD DOORJune 2024May 2025Allow1210NoNo
18677351CARBON CREDIT EXCHANGE SYSTEM AND METHOD FOR REDUCED-CARBON-EMISSION PORTLAND CEMENT CONCRETE SLABS-ON-GROUNDMay 2024August 2024Allow210NoNo
18669979WALL PANELMay 2024December 2024Allow720NoNo
18668763ROOFING SYSTEM AND ASSOCIATED ROOFING SHINGLEMay 2024March 2025Allow1011YesNo
18668664CASING BEAD APPARATUSMay 2024March 2025Allow1010NoNo
18667544PARAPETMay 2024October 2024Allow510NoNo
18665468THERMOPLASTIC ROOFING MEMBRANES FOR FULLY-ADHERED ROOFING SYSTEMSMay 2024May 2025Allow1210NoNo
18657801ENERGY STORAGE CABINMay 2024December 2024Allow710NoNo
18655702BUILDING STRUCTURE AND METHODS OF ASSEMBLY THEREOFMay 2024November 2024Allow700NoNo
18652917MULTI-LAYERED BARRIER OF FIRE RETARDANT AND VAPOR/MOISTURE BARRIER PROTECTANT METHOD AND DEVICESMay 2024August 2024Allow300YesNo
18652074BUILDING ELEMENT FOR A PREFABRICATED, MODULAR, SEMI-PERMANENT AND RELOCATABLE STRUCTUREMay 2024August 2024Allow300NoNo
18645114Cross-Laminated Timber and Cold-Formed Steel Connector and SystemApril 2024January 2025Allow900NoNo
18641477Coupler for Concrete Reinforcing MembersApril 2024July 2024Allow300NoNo
18639288DECK CLIPApril 2024June 2025Allow1430NoNo
18639117ROOFING SYSTEM HAVING TAPERED INSULATION PANELS, A ROOF ASSEMBLY KIT AND A METHOD OF INSTALLING THEREOFApril 2024November 2024Allow710YesNo
18638384DECK CLIPApril 2024August 2024Allow420NoNo
18636816Construction SystemApril 2024January 2025Allow1000NoNo
18635171FRAMELESS SOLAR MODULE MOUNTINGApril 2024March 2025Allow1110NoNo
18628922Guard Rail Base and Methods Associated TherewithApril 2024March 2025Allow1110NoNo
18629046BUILDING PANEL WITH LOCKING SYSTEMApril 2024March 2025Allow1110NoNo
18625289SHINGLE WITH REINFORCEMENT MEMBERApril 2024June 2025Abandon1510NoNo
18620156Panel Interconnectable with Similar Panels for Forming a CoveringMarch 2024January 2025Allow1000NoNo
18618190APPARATUS, SYSTEM, AND METHOD FOR A PARACLEAT ANCHOR FOR TILT-UP WALL CONSTRUCTIONMarch 2024August 2024Allow510NoNo
18618404Floor Board and Method for Manufacturing Such Floor BoardsMarch 2024September 2024Allow610NoNo
18619153ADJUSTABLE METAL FRAMING SYSTEM AND CONNECTONMarch 2024May 2025Allow1440YesNo
18616728CONCRETE REPAIR DEVICEMarch 2024January 2025Allow1010NoNo
18615036CEILING SYSTEM AND METHOD OF INSTALLATIONMarch 2024February 2025Allow1110NoNo
18615504INSULATED ROOF SYSTEMS, SUPPORT MEMBERS THEREOF, AND METHOD OF INSTALLINGMarch 2024February 2025Allow1110NoNo
18613175CONFIGURATION AND CLOSE-FITTING JOINT FOR SECOND-ORDER SCISSOR DAMPER AND ASSEMBLY METHOD FOR THE SAMEMarch 2024August 2024Allow510NoNo
18614337METHODS AND SYSTEMS FOR MAINTAINING ARIDITYMarch 2024October 2024Allow600YesNo
18614091Retractable Curtain For Livestock StructuresMarch 2024May 2025Allow1410NoNo
18612869Translating Support ConnectorMarch 2024October 2024Allow710NoNo
18610359CAP SHINGLES FOR ROOFING SYSTEMSMarch 2024October 2024Allow710NoNo
18605729Concrete Anchor Rod Positioning and Securement Device and MethodMarch 2024May 2025Allow1420NoNo
18602307BEAM-COLUMN MOMENT CONNECTION STRUCTUREMarch 2024June 2024Allow300YesNo
18597630ROOFING MATERIAL, AND ROOF SYSTEM INCLUDING THE ROOFING MATERIALMarch 2024October 2024Allow711NoNo
18597191Self-Supporting Bi-Directional Corrugated Mesh Leaf Preclusion DeviceMarch 2024April 2025Allow1310NoNo
18595976Siding Panel with Varying Profile and Siding SystemMarch 2024May 2025Allow1410NoNo
18589829SYSTEM AND METHOD FOR IMPROVED SCREW PILE BASEFebruary 2024October 2024Allow720NoNo
18584881PHOTOVOLTAIC SHINGLES WITH MULTI-MODULE POWER ELECTRONICSFebruary 2024August 2024Allow610NoNo
18684211Console for retractable roofs and facadesFebruary 2024October 2024Allow820NoNo
18683886Console for retractable roofs and facadesFebruary 2024May 2025Allow1510NoNo
18441928Structural Attachment Sealing SystemFebruary 2024January 2025Abandon1110NoNo
18439642Protective Device for Protruding ObjectsFebruary 2024June 2025Allow1610NoNo
18438924CARBON CREDIT EXCHANGE SYSTEM AND METHOD FOR REDUCED-CARBON-EMISSION PORTLAND CEMENT CONCRETE SLABS-ON-GROUNDFebruary 2024May 2024Allow320YesNo

Appeals Overview

This analysis examines appeal outcomes and the strategic value of filing appeals for art-unit 3633.

Patent Trial and Appeal Board (PTAB) Decisions

Total PTAB Decisions
253
Examiner Affirmed
164
(64.8%)
Examiner Reversed
89
(35.2%)
Reversal Percentile
62.8%
Higher than average

What This Means

With a 35.2% reversal rate, the PTAB reverses the examiner's rejections in a meaningful percentage of cases. This reversal rate is above the USPTO average, indicating that appeals have better success here than typical.

Strategic Value of Filing an Appeal

Total Appeal Filings
783
Allowed After Appeal Filing
263
(33.6%)
Not Allowed After Appeal Filing
520
(66.4%)
Filing Benefit Percentile
53.6%
Higher than average

Understanding Appeal Filing Strategy

Filing a Notice of Appeal can sometimes lead to allowance even before the appeal is fully briefed or decided by the PTAB. This occurs when the examiner or their supervisor reconsiders the rejection during the mandatory appeal conference (MPEP § 1207.01) after the appeal is filed.

In this dataset, 33.6% of applications that filed an appeal were subsequently allowed. This appeal filing benefit rate is above the USPTO average, suggesting that filing an appeal can be an effective strategy for prompting reconsideration.

Strategic Recommendations

Appeals to PTAB show good success rates. If you have a strong case on the merits, consider fully prosecuting the appeal to a Board decision.

Filing a Notice of Appeal is strategically valuable. The act of filing often prompts favorable reconsideration during the mandatory appeal conference.

Art Unit 3633 - Prosecution Statistics Summary

Executive Summary

Art Unit 3633 is part of Group 3630 in Technology Center 3600. This art unit has examined 16,698 patent applications in our dataset, with an overall allowance rate of 69.1%. Applications typically reach final disposition in approximately 23 months.

Comparative Analysis

Art Unit 3633's allowance rate of 69.1% places it in the 26% percentile among all USPTO art units. This art unit has a below-average allowance rate compared to other art units.

Prosecution Patterns

Applications in Art Unit 3633 receive an average of 1.79 office actions before reaching final disposition (in the 47% percentile). The median prosecution time is 23 months (in the 86% percentile).

Strategic Considerations

When prosecuting applications in this art unit, consider the following:

  • The art unit's allowance rate suggests a more challenging examination environment compared to the USPTO average.
  • With fewer office actions than average, plan for relatively streamlined prosecution.
  • The median prosecution time is shorter than average and should be factored into your continuation and client communication strategies.
  • Review individual examiner statistics within this art unit to identify examiners with particularly favorable or challenging prosecution patterns.

Important Disclaimer

Not Legal Advice: The information provided in this report is for informational purposes only and does not constitute legal advice. You should consult with a qualified patent attorney or agent for advice specific to your situation.

No Guarantees: We do not provide any guarantees as to the accuracy, completeness, or timeliness of the statistics presented above. Patent prosecution statistics are derived from publicly available USPTO data and are subject to data quality limitations, processing errors, and changes in USPTO practices over time.

Limitation of Liability: Under no circumstances will IronCrow AI be liable for any outcome, decision, or action resulting from your reliance on the statistics, analysis, or recommendations presented in this report. Past prosecution patterns do not guarantee future results.

Use at Your Own Risk: While we strive to provide accurate and useful prosecution statistics, you should independently verify any information that is material to your prosecution strategy and use your professional judgment in all patent prosecution matters.