USPTO Examiner BUCKLE JR JAMES J - Art Unit 3633

Recent Applications

Detailed information about the 100 most recent patent applications.

Application NumberTitleFiling DateDisposal DateDispositionTime (months)Office ActionsRestrictionsInterviewAppeal
19185467INFLATABLE STABILIZED ENCLOSUREApril 2025December 2025Allow810NoNo
18815230PATRON-ACCESSIBLE MEMORIALIZATION STRUCTURESAugust 2024February 2026Allow1810NoNo
18768671ROOF SLOPING SYSTEMJuly 2024October 2025Allow1500NoNo
18753482SOUND ATTENUATING BUILDING PANELSJune 2024October 2025Allow1511NoNo
18746407FRAME ASSEMBLY FOR WINDOWS AND SLIDING DOORSJune 2024June 2025Allow1210NoNo
18746851DISCRETE MACROSCOPIC METAMATERIAL SYSTEMSJune 2024February 2026Allow2021YesNo
18731722FINISHING ACCESSORY WITH BACKING STRIPJune 2024October 2025Allow1610NoNo
18667946CORNER WINDOW LITE ASSEMBLIESMay 2024October 2025Allow1711NoNo
18645114Cross-Laminated Timber and Cold-Formed Steel Connector and SystemApril 2024January 2025Allow900NoNo
18616728CONCRETE REPAIR DEVICEMarch 2024January 2025Allow1010NoNo
18582022Siding Attachment Accessory and Siding SystemFebruary 2024January 2026Allow2311NoNo
18426332ADJUSTABLE SUPPORT SYSTEM FOR A BUILDING STRUCTURE AND A WALL STRUCTURE HAVING AN ADJUSTABLE SUPPORT SYSTEMJanuary 2024March 2025Allow1310NoNo
18425720FLOOR PANEL FOR FORMING A FLOOR COVERINGJanuary 2024January 2025Allow1210NoNo
18409024METHODS OF ASSEMBLY OF PREFABRICATED TRUSS CONSTRUCTION MODULESJanuary 2024March 2025Abandon1430NoNo
18409014PREFABRICATED TRUSS CONSTRUCTION MODULESJanuary 2024March 2025Abandon1430NoNo
18404061STRUCTURES FOR GROWING PLANTSJanuary 2024March 2025Allow1410NoNo
18403671FIRE-RATED JOINT SYSTEMJanuary 2024October 2024Allow900NoNo
18399608BRACING APPARATUS, SYSTEM, AND METHOD FOR INSTALLATION OF SUB-SURFACE UTILITY ANCHORSDecember 2023August 2024Allow711NoNo
18396781DOOR-READY MOLDINGDecember 2023April 2025Allow1610NoNo
18286218SYSTEMS AND METHODS OF CONSTRUCTIONOctober 2023December 2025Abandon2610NoNo
18554026STRUCTURAL MODULES PRODUCED BY ADDITIVE MANUFACTURINGOctober 2023January 2026Abandon2701NoNo
18475603RELOCATABLE TANKSeptember 2023December 2024Allow1531NoNo
18470053STACKABLE BURIAL TOWERSeptember 2023October 2025Allow2510NoNo
18462873EXTRUSION PROFILE BRACKET FOR PANEL MOUNTINGSeptember 2023April 2024Allow711YesNo
18463176Raised Arc Rain Gutter Debris Preclusion DeviceSeptember 2023September 2024Allow1210NoNo
18458180Expandable Hanger for BeamAugust 2023January 2025Allow1711NoNo
18454179Sound Damping Wallboard and Method of Constructing a Sound Damping WallboardAugust 2023December 2024Allow1610NoNo
18261610AUTOMATIC PARKING SYSTEM AND ASSOCIATED MOTOR VEHICLE PARKING METHODAugust 2023February 2026Allow3111NoNo
18233140METHOD AND ARRANGEMENT FOR CONSTRUCTING AND INTERCONNECTING PREFABRICATED BUILDING MODULESAugust 2023March 2025Allow2020NoNo
18233237METHOD AND ARRANGEMENT FOR CONSTRUCTING AND INTERCONNECTING PREFABRICATED BUILDING MODULESAugust 2023March 2026Abandon3130NoNo
18232796METHOD AND ARRANGEMENT FOR CONSTRUCTING AND INTERCONNECTING PREFABRICATED BUILDING MODULESAugust 2023October 2025Allow2620NoNo
18227401Temporary Pool Cover and Floor SystemJuly 2023November 2023Allow410NoNo
18350592MODULAR BUILDING ASSEMBLY AND WALL CLADDING SYSTEMJuly 2023February 2025Abandon1921NoNo
18215340FINISHING ACCESSORY WITH BACKING STRIPJune 2023February 2024Allow810NoNo
18208609FRAME ARRANGEMENT FOR WOOD FRAMED BUILDINGSJune 2023July 2024Allow1321NoNo
18197002Drywall Spacing Joist HangerMay 2023January 2026Allow3201NoNo
18252209CHASSIS GUIDANCE SYSTEM AND METHOD FOR MODULAR BUILDINGSMay 2023September 2024Allow1701NoNo
18251795Connecting Beam for Solar Photoelectric Supporting FrameMay 2023March 2026Abandon3520NoNo
18301328FLOOR PANELApril 2023May 2024Abandon1310NoNo
18181834TRACK SYSTEM FOR ARCHITECTURAL STRETCH-FABRIC APPLICATIONSMarch 2023February 2024Allow1211NoNo
18175940OUTDOOR TO INDOOR SWIMMING POOL APPARATUSFebruary 2023December 2025Allow3410NoNo
18114712PATRON-ACCESSIBLE MEMORIALIZATION STRUCTURESFebruary 2023May 2024Allow1510NoNo
18172726EXTENDIBLE POLESFebruary 2023October 2025Allow3210NoNo
18170395Hybrid Snow and Ice Retention SystemFebruary 2023March 2024Allow1310NoNo
18108229APPARATUS AND METHOD FOR SOLAR ENERGY COLLECTORFebruary 2023August 2024Allow1811NoNo
18107489POLYFUNCTIONAL STRUCTURAL CONNECTOR AND ITS UNIVERSAL FASTENING COMPONENTS MAKING A SYSTEMFebruary 2023March 2026Abandon3701NoNo
18165535BUILDING INTEGRATED PHOTOVOLTAIC SYSTEMFebruary 2023April 2024Allow1412NoNo
18099428FLOOR PANEL FOR FORMING A FLOOR COVERINGJanuary 2023November 2023Allow1010NoNo
18098936CONNECTOR DEVICE, SYSTEM AND METHOD FOR CONSTRUCTING A ROOF FOR A BUILDINGJanuary 2023July 2024Allow1821YesNo
18016933MODULAR FLOOR SYSTEM AND MODULES THEREFORJanuary 2023December 2025Abandon3510NoNo
18005382CONSTRUCTION OF AN ARCHJanuary 2023November 2025Abandon3410NoNo
18096417STRUCTURES FOR GROWING PLANTSJanuary 2023October 2023Allow910NoNo
18153854DEMOUNTABLE TANKJanuary 2023June 2024Abandon1811NoNo
18095764MODULAR BUILDING COMPONENTJanuary 2023September 2023Allow811NoNo
18092898ADJUSTABLE SUPPORT SYSTEM FOR A BUILDING STRUCTURE AND A WALL STRUCTURE HAVING AN ADJUSTABLE SUPPORT SYSTEMJanuary 2023December 2023Allow1210NoNo
18092900ADJUSTABLE SUPPORT SYSTEM FOR A BUILDING STRUCTURE AND A WALL STRUCTURE HAVING AN ADJUSTABLE SUPPORT SYSTEMJanuary 2023September 2023Allow800NoNo
18091983METHODS AND APPARATUS FOR REPAIRING WALLSDecember 2022July 2025Abandon3001NoNo
18010734LIGHTWEIGHT COLUMBARIUM, COMBINATIONS THEREOF WITH A RITUAL TRANSPORTER AND A CRATE, AND METHODS OF TRANPORTING AND INSTALLING A LIGHTWEIGHT COLUMBARIUMDecember 2022July 2025Allow3111NoNo
17982733UTILITIES CONNECTION MANAGEMENT SYSTEM AND METHOD FOR RETRACTABLE BUILDINGSNovember 2022May 2023Allow610NoNo
17975367Temporary Pool Cover and Floor SystemOctober 2022April 2023Allow510NoNo
17919861FOLDED ARCHITECTURAL PANELOctober 2022October 2025Allow3510NoNo
17963571PANEL AND PANEL SYSTEM FOR COVERING A SURFACEOctober 2022March 2026Allow4130NoNo
17915900GROUND ANCHORING APPARATUS AND METHODSeptember 2022April 2025Allow3111NoNo
17947612SHIELDED ENCLOSURES AND RELATED METHODS FOR PROTECTION FROM HIGH-ALTITUDE ELECTROMAGNETIC PULSESSeptember 2022April 2025Abandon3110NoNo
17946274MULTI-PURPOSE STRUCTURAL PANELS AND SYSTEMS FOR ASSEMBLING STRUCTURESSeptember 2022October 2024Allow2541NoNo
17943352FINISHING ACCESSORY WITH BACKING STRIPSeptember 2022March 2023Allow610NoNo
17942834CORNER WINDOW LITE ASSEMBLIESSeptember 2022February 2024Allow1821NoNo
17800816SOLAR ARRAY WITH SERVICE ROBOT THAT CAN TRAVEL BETWEEN SOLAR PANELSAugust 2022October 2025Allow3810NoNo
17887805RACK SYSTEM FOR A DATA CENTERAugust 2022October 2025Allow3811NoNo
17885190CONNECTOR FOR CONNECTING STRUCTURAL INSULATED PANELSAugust 2022April 2025Allow3210NoNo
17883825REDUCED SIZED WEARABLE RETRACTABLEAugust 2022November 2025Abandon3910NoNo
17760043MODULAR STRUCTURE FOR PROVIDING ON-SITE PROTECTIONAugust 2022December 2024Allow2811NoNo
17816340Ceiling Tile with Integrated BaffleJuly 2022November 2022Allow400NoNo
17867815STORAGE SHED WITH INTEGRATED SOLAR ROOFJuly 2022March 2025Allow3210NoNo
17791646MODULAR STRUCTUREJuly 2022June 2025Allow3510NoNo
17855618RESILIENT CONNECTOR AND METHODS OF USE OF SAMEJune 2022February 2025Allow3210NoNo
17847696Demolition MachineJune 2022July 2025Allow3611NoNo
17845899FRAME ASSEMBLY FOR WINDOWS AND SLIDING DOORSJune 2022October 2023Allow1610NoNo
17807118Mass Timber HangerJune 2022April 2025Allow3411NoNo
17785139PANEL FOR PRODUCING SELF-LOCKING FLOOR COVERINGJune 2022December 2024Allow3010NoNo
17840180WALL MATERIAL AND WALL-MATERIAL BUILDING STRUCTUREJune 2022November 2024Allow2910NoNo
17756702DRYWALL AND METHOD FOR CONSTRUCTING A DRYWALLMay 2022February 2025Allow3320NoNo
17824322CEILING SYSTEM WITH AIR MOVEMENTMay 2022August 2023Allow1520NoNo
17777904MODULAR WALLING SYSTEM, COMPONENTS AND METHODSMay 2022March 2025Abandon3420NoNo
17773256CEILING PANEL SUPPORT SYSTEMApril 2022November 2024Allow3010NoNo
17769946STRUCTURAL PLATES AND METHODS OF CONSTRUCTING ARCH-SHAPED STRUCTURES USING STRUCTURAL PLATESApril 2022December 2024Allow3211NoNo
17713654Ceiling Grid Lighting Assembly with Configured AlignmentApril 2022September 2023Allow1811NoNo
17712569DISTRIBUTED FLEXIBLE MEMBRANE BACKING SYSTEMS, DEVICES, AND METHODSApril 2022June 2025Allow3910NoNo
17711178CURVATURE ADJUSTABLE MAGNETIC STRUTApril 2022September 2024Allow3021NoNo
17706550STUCCO CONSTRUCTION SYSTEMMarch 2022May 2024Allow2510NoNo
17695479TERMINATION FOR BUILDING STRUCTURESMarch 2022December 2024Abandon3311NoNo
17654889DISCRETE MACROSCOPIC METAMATERIAL SYSTEMSMarch 2022February 2024Allow2312YesNo
17640596ADJUSTABLE GLASS MOUNTING GROOVEMarch 2022April 2024Allow2610NoNo
17678635METHOD AND ARRANGEMENT FOR CONSTRUCTING AND INTERCONNECTING PREFABRICATED BUILDING MODULESFebruary 2022May 2023Allow1411NoNo
17675403CHANNEL CLIPFebruary 2022October 2025Allow4331YesNo
17674680PREFABRICATED MODULAR GARAGE OR COMMERCIAL CONVERSION ACCESSORY DWELLING UNITSFebruary 2022April 2025Abandon3821NoNo
17669057CONFIGURABLE LINEAR LIGHTING MODULE FOR SUSPENDED CEILING GRID ASSEMBLIESFebruary 2022July 2025Allow4122NoNo
17669026CONFIGURABLE CEILING GRID LIGHTING ASSEMBLY WITH T-BAR MOUNTED LINEAR SUPPORT ELEMENTSFebruary 2022February 2026Allow4831NoNo
17666280ABOVE GROUND TORNADO SHELTERFebruary 2022April 2024Allow2610NoNo
17665464Configurable Ceiling Grid Lighting Assembly with T-Bar MountingFebruary 2022June 2025Abandon4121NoNo

Appeals Overview

This analysis examines appeal outcomes and the strategic value of filing appeals for examiner BUCKLE JR, JAMES J.

Patent Trial and Appeal Board (PTAB) Decisions

Total PTAB Decisions
7
Examiner Affirmed
2
(28.6%)
Examiner Reversed
5
(71.4%)
Reversal Percentile
88.6%
Higher than average

What This Means

With a 71.4% reversal rate, the PTAB has reversed the examiner's rejections more often than affirming them. This reversal rate is in the top 25% across the USPTO, indicating that appeals are more successful here than in most other areas.

Strategic Value of Filing an Appeal

Total Appeal Filings
27
Allowed After Appeal Filing
13
(48.1%)
Not Allowed After Appeal Filing
14
(51.9%)
Filing Benefit Percentile
76.7%
Higher than average

Understanding Appeal Filing Strategy

Filing a Notice of Appeal can sometimes lead to allowance even before the appeal is fully briefed or decided by the PTAB. This occurs when the examiner or their supervisor reconsiders the rejection during the mandatory appeal conference (MPEP § 1207.01) after the appeal is filed.

In this dataset, 48.1% of applications that filed an appeal were subsequently allowed. This appeal filing benefit rate is in the top 25% across the USPTO, indicating that filing appeals is particularly effective here. The act of filing often prompts favorable reconsideration during the mandatory appeal conference.

Strategic Recommendations

Appeals to PTAB show good success rates. If you have a strong case on the merits, consider fully prosecuting the appeal to a Board decision.

Filing a Notice of Appeal is strategically valuable. The act of filing often prompts favorable reconsideration during the mandatory appeal conference.

Examiner BUCKLE JR, JAMES J - Prosecution Strategy Guide

Executive Summary

Examiner BUCKLE JR, JAMES J works in Art Unit 3633 and has examined 616 patent applications in our dataset. With an allowance rate of 60.9%, this examiner allows applications at a lower rate than most examiners at the USPTO. Applications typically reach final disposition in approximately 29 months.

Allowance Patterns

Examiner BUCKLE JR, JAMES J's allowance rate of 60.9% places them in the 21% percentile among all USPTO examiners. This examiner is less likely to allow applications than most examiners at the USPTO.

Office Action Patterns

On average, applications examined by BUCKLE JR, JAMES J receive 2.00 office actions before reaching final disposition. This places the examiner in the 50% percentile for office actions issued. This examiner issues a slightly above-average number of office actions.

Prosecution Timeline

The median time to disposition (half-life) for applications examined by BUCKLE JR, JAMES J is 29 months. This places the examiner in the 66% percentile for prosecution speed. Prosecution timelines are slightly faster than average with this examiner.

Interview Effectiveness

Conducting an examiner interview provides a +25.2% benefit to allowance rate for applications examined by BUCKLE JR, JAMES J. This interview benefit is in the 72% percentile among all examiners. Recommendation: Interviews provide an above-average benefit with this examiner and are worth considering.

Request for Continued Examination (RCE) Effectiveness

When applicants file an RCE with this examiner, 27.8% of applications are subsequently allowed. This success rate is in the 49% percentile among all examiners. Strategic Insight: RCEs show below-average effectiveness with this examiner. Carefully evaluate whether an RCE or continuation is the better strategy.

After-Final Amendment Practice

This examiner enters after-final amendments leading to allowance in 42.1% of cases where such amendments are filed. This entry rate is in the 64% percentile among all examiners. Strategic Recommendation: This examiner shows above-average receptiveness to after-final amendments. If your amendments clearly overcome the rejections and do not raise new issues, consider filing after-final amendments before resorting to an RCE.

Pre-Appeal Conference Effectiveness

When applicants request a pre-appeal conference (PAC) with this examiner, 100.0% result in withdrawal of the rejection or reopening of prosecution. This success rate is in the 75% percentile among all examiners. Strategic Recommendation: Pre-appeal conferences show above-average effectiveness with this examiner. If you have strong arguments, a PAC request may result in favorable reconsideration.

Appeal Withdrawal and Reconsideration

This examiner withdraws rejections or reopens prosecution in 73.1% of appeals filed. This is in the 62% percentile among all examiners. Of these withdrawals, 26.3% occur early in the appeal process (after Notice of Appeal but before Appeal Brief). Strategic Insight: This examiner shows above-average willingness to reconsider rejections during appeals. The mandatory appeal conference (MPEP § 1207.01) provides an opportunity for reconsideration.

Petition Practice

When applicants file petitions regarding this examiner's actions, 56.7% are granted (fully or in part). This grant rate is in the 59% percentile among all examiners. Strategic Note: Petitions show above-average success regarding this examiner's actions. Petitionable matters include restriction requirements (MPEP § 1002.02(c)(2)) and various procedural issues.

Examiner Cooperation and Flexibility

Examiner's Amendments: This examiner makes examiner's amendments in 8.3% of allowed cases (in the 91% percentile). Per MPEP § 1302.04, examiner's amendments are used to place applications in condition for allowance when only minor changes are needed. This examiner frequently uses this tool compared to other examiners, indicating a cooperative approach to getting applications allowed. Strategic Insight: If you are close to allowance but minor claim amendments are needed, this examiner may be willing to make an examiner's amendment rather than requiring another round of prosecution.

Quayle Actions: This examiner issues Ex Parte Quayle actions in 2.1% of allowed cases (in the 69% percentile). This examiner issues Quayle actions more often than average when claims are allowable but formal matters remain (MPEP § 714.14).

Prosecution Strategy Recommendations

Based on the statistical analysis of this examiner's prosecution patterns, here are tailored strategic recommendations:

  • Prepare for rigorous examination: With a below-average allowance rate, ensure your application has strong written description and enablement support. Consider filing a continuation if you need to add new matter.
  • Examiner cooperation: This examiner frequently makes examiner's amendments to place applications in condition for allowance. If you are close to allowance, the examiner may help finalize the claims.

Relevant MPEP Sections for Prosecution Strategy

  • MPEP § 713.10: Examiner interviews - available before Notice of Allowance or transfer to PTAB
  • MPEP § 714.12: After-final amendments - may be entered "under justifiable circumstances"
  • MPEP § 1002.02(c): Petitionable matters to Technology Center Director
  • MPEP § 1004: Actions requiring primary examiner signature (allowances, final rejections, examiner's answers)
  • MPEP § 1207.01: Appeal conferences - mandatory for all appeals
  • MPEP § 1214.07: Reopening prosecution after appeal

Important Disclaimer

Not Legal Advice: The information provided in this report is for informational purposes only and does not constitute legal advice. You should consult with a qualified patent attorney or agent for advice specific to your situation.

No Guarantees: We do not provide any guarantees as to the accuracy, completeness, or timeliness of the statistics presented above. Patent prosecution statistics are derived from publicly available USPTO data and are subject to data quality limitations, processing errors, and changes in USPTO practices over time.

Limitation of Liability: Under no circumstances will IronCrow AI be liable for any outcome, decision, or action resulting from your reliance on the statistics, analysis, or recommendations presented in this report. Past prosecution patterns do not guarantee future results.

Use at Your Own Risk: While we strive to provide accurate and useful prosecution statistics, you should independently verify any information that is material to your prosecution strategy and use your professional judgment in all patent prosecution matters.