Application NumberTitleFiling DateDisposal DateDispositionTime (months)Office ActionsRestrictionsInterviewAppeal
19224278RAIL MOUNTED JUNCTION BOXMay 2025December 2025Allow720YesNo
19094306FRAME BACKING PANELMarch 2025February 2026Allow1130YesNo
18791777EARTHQUAKE ANCHORAugust 2024March 2026Allow1900NoNo
18777853AUTOMATIC LEVELING CARBON FIBER REINFORCED POLYMER (CFRP) PLATE PRE-STRESSING AND TENSIONING DEVICES FOR CURVED SURFACE STRUCTURESJuly 2024December 2024Allow510NoNo
18767555PHOTOVOLTAIC MODULE MOUNTING ASSEMBLYJuly 2024November 2025Allow1620YesNo
18749182MODULAR WALL PANEL WITH INTEGRATED CHANNELSJune 2024March 2025Allow920NoNo
18677439SINGLE PIECE GUTTER GUARD WITH TRUSSMay 2024January 2026Allow2020NoNo
18671607Rail-Based Solar Panel Mounting SystemMay 2024August 2025Allow1510NoNo
18664337TILE LEVELERMay 2024March 2026Allow2210NoNo
18641477Coupler for Concrete Reinforcing MembersApril 2024July 2024Allow300NoNo
18638957STRUCTURAL SUPPORT SYSTEM FOR ROCKWORK WITH MECHANICAL FASTENING OF ADJACENT CHIP ASSEMBLIESApril 2024July 2025Allow1521NoNo
18635912GUTTER GUARD WITH GIRDERApril 2024September 2025Allow1720NoNo
18602771FLOOR PANEL FOR FORMING A FLOOR COVERINGMarch 2024August 2025Allow1720NoNo
18594820GUTTER GUARD WITH TRUSSMarch 2024January 2026Abandon2220YesNo
18433876MODULAR LATTICE TOWERFebruary 2024February 2026Allow2510YesNo
18428434GUTTER GUARD WITH IRREGULAR GROOVESJanuary 2024July 2025Allow1720NoNo
18417942Cast Stone Corner Hardscaping BlockJanuary 2024January 2025Allow1220NoNo
18407394GRATING FOR FALL PREVENTION AND CABLE DUCT MOUNTED ON GRATINGJanuary 2024March 2026Abandon2610NoNo
18400244L-Foot Adapter for Rail-Based Solar Panel Racking SystemsDecember 2023April 2024Allow420YesNo
18392576Profile and Construction Element Set for Arranging a Component for a Drywall Construction, and Drywall Formed TherewithDecember 2023January 2026Allow2540YesNo
18573043Methods and Systems for Mounting Solar Panel FramesDecember 2023October 2025Allow2221YesNo
18539120MODULAR WALL AND FAÇADE SYSTEMS FOR DISTRIBUTING ENERGY OR SIGNALS IN STRUCTURESDecember 2023May 2025Allow1730YesNo
18531655WATERPROOFING AND SAFETY-INCREASING PREFABRICATED BUILDING FRAMING SYSTEM AND METHODDecember 2023December 2024Allow1210YesNo
18567538TERRACE CANOPYDecember 2023December 2025Allow2510NoNo
18531283MULTI-PANEL FOLDABLE SHELTER SYSTEMDecember 2023May 2025Allow1720NoNo
18530019PRESSURE TRANSDUCING GASKET SYSTEMSDecember 2023January 2026Allow2610NoNo
18387592SURFACE MOUNT ASSEMBLIES FOR A SOLAR PANEL SYSTEMNovember 2023September 2024Allow1010NoNo
18559355DETACHABLE ROOF INTEGRATED SOLAR PHOTOVOLTAIC MODULENovember 2023November 2024Allow1220NoNo
18387508MOUNT ASSEMBLIES WITH CHEMICAL FLASHINGSNovember 2023January 2025Allow1520NoNo
18502891STRUCTURAL STUD POST WITH THERMAL BREAKNovember 2023February 2025Allow1520NoNo
18501510PREFABRICATED CROSS-LAMINATED TIMBER BUILDING UNITNovember 2023March 2026Abandon2810NoNo
18383210EDGE GUARD AND END CAP SYSTEM FOR A FIRE DOOR ASSEMBLYOctober 2023November 2025Allow2510NoNo
18491395TRESTLEOctober 2023November 2025Allow2510NoNo
18491390Reinforced masonry and method for carrying out such masonryOctober 2023March 2026Abandon2910NoNo
18486153MODULAR BUILDING PANELS WITH BUILDING SERVICESOctober 2023February 2025Allow1721YesNo
18373274Method and System for Securing a Solar Panel to a Tile RoofSeptember 2023January 2024Allow410YesNo
18468488METHOD FOR CREATING A PRECAST CONCRETE WALL WITH ADJUSTABLE CONCRETE FORM LINER CONNECTIONSeptember 2023August 2025Abandon2310NoNo
18467515TAPER TIES FOR CONCRETE FORMWORK AND RELATED DEVICES, SYSTEMS, AND METHODSSeptember 2023September 2025Abandon2510NoNo
18242698WAFFLE SLAB AND STRUCTURES AND METHOD OF MANUFACTURING THE SAMESeptember 2023July 2025Allow2210NoNo
18549248PHOTOVOLTAIC PANEL FASTENER AND PHOTOVOLTAIC PANEL MODULE MOUNTING DEVICESeptember 2023October 2025Allow2610NoNo
18239165MODULAR WINDOW SHUTTER SYSTEMAugust 2023October 2025Allow2620NoNo
18456850FENESTRATION UNIT WITH SILL ARRANGEMENT FLUID MANAGEMENT SYSTEMAugust 2023July 2025Allow2300NoNo
18455763FILLER BEAM ASSEMBLYAugust 2023June 2025Allow2110NoNo
18450106FLOOR PANEL FOR FORMING A FLOOR COVERINGAugust 2023October 2024Allow1410NoNo
18233405Support Base for Photovoltaic PanelsAugust 2023May 2024Allow900NoNo
18227708UNIVERSAL SLOPED ROOF SOLAR PANEL MOUNTING SYSTEMJuly 2023October 2025Allow2740YesNo
18358789SINGLE PIECE GUTTER GUARD WITH GIRDERJuly 2023August 2024Allow1310NoNo
18357804SKYLIGHT WITH INTEGRATED SOLAR PANELJuly 2023November 2025Allow2810NoNo
18356969ROOF INTERFACE WITH SEALANT INJECTION PORTSJuly 2023October 2025Allow2710NoNo
18355677ANCHORAGE AND PRESTRESSED CONCRETE (PC) STRUCTUREJuly 2023January 2026Allow3020YesNo
18221016Adjustable Step SystemJuly 2023January 2024Allow610YesNo
18219576PHOTOVOLTAIC ROOFING SYSTEMSJuly 2023March 2026Abandon3210NoNo
18347195MODULAR WALL AND FAÇADE SYSTEMS FOR DISTRIBUTING ENERGY OR SIGNALS IN STRUCTURESJuly 2023October 2023Allow310YesNo
18270108INTEGRATED PHOTOVOLTAIC ROOF ELEMENTJune 2023November 2025Abandon2810NoNo
18212990SYSTEM AND METHODS FOR EXTRUDED ALUMINUM WALL PANEL FRAMINGJune 2023July 2024Abandon1310NoNo
18258772TENSILE TRANSMISSION TOWER DESIGNJune 2023August 2025Allow2610NoNo
18266406Rail-Based Solar Panel Mounting SystemJune 2023January 2024Allow800NoNo
18328497SYSTEMS AND METHODS FOR COVING A FACETED ROOMJune 2023December 2023Allow711YesNo
18204060MULTI-THREAT MITIGATION SECURITY APPARATUS FOR PROTECTING PERSONNEL, ASSETS AND CRITICAL INFRASTRUCTUREMay 2023April 2024Allow1120YesNo
18319609STRUCTURE AND CANOPY FOR MOUNTING OF PHOTOVOLTAIC PANELMay 2023May 2024Allow1230YesNo
18137300PANELApril 2023May 2024Allow1310NoNo
18031955ROOF CONSTRUCTION FOR A CANOPY, KIT OF PARTS FOR ASSEMBLING THE ROOF CONSTRUCTION, AND METHOD FOR PLACING A LEDSTRIP IN THE ROOF CONSTRUCTIONApril 2023October 2025Allow3010NoNo
18131067Safety enclosure building systemApril 2023July 2025Allow2710NoNo
18127158AERODYNAMIC SOLAR CELL SYSTEMMarch 2023July 2025Allow2810NoNo
18126763Snow Fort Making KitMarch 2023June 2025Allow2710YesNo
18188922SANDWICH PANEL AND BUILDING MODULEMarch 2023March 2025Allow2410NoNo
18187867FLOOR PANEL FOR FORMING A FLOOR COVERINGMarch 2023August 2024Allow1720NoNo
18188072CONCRETE SLAB JOINT FORMING SYSTEM AND METHODMarch 2023August 2025Allow2930NoNo
18027264TEMPORARY SUPPORT STRUCTURAL SYSTEM FOR POWER LINESMarch 2023March 2026Allow4030YesNo
18120023DOOR ASSEMBLYMarch 2023March 2024Allow1220YesNo
18118387SURFACE MOUNT ASSEMBLIES FOR A SOLAR PANEL SYSTEMMarch 2023August 2023Allow610NoNo
18024111SUPPORTING BEAM FOR A FORMWORK PANELMarch 2023March 2026Abandon3620NoNo
18042634SEALING DEVICE FOR DOUBLE EDGE JOINTS, AND DRYWALLFebruary 2023December 2024Allow2220NoNo
18169294Access Panel And Method Of ManufactureFebruary 2023February 2026Allow3621YesNo
18109814ONE-PIECE BONDING SPLICE FOR RAILSFebruary 2023June 2024Allow1620NoNo
18040537Hanger With Removable Leveling MemberFebruary 2023April 2025Allow2610NoNo
18105753MODULAR WALL AND FAÇADE SYSTEMS FOR DISTRIBUTING ENERGY OR SIGNALS IN STRUCTURESFebruary 2023June 2023Allow410NoNo
18164255CLAMPS FOR SOLAR SYSTEMFebruary 2023June 2024Allow1720NoNo
18154308SUBFLOOR JOINTJanuary 2023June 2024Allow1720NoNo
18016319CONSTRUCTION FRAME AND SYSTEM COMPRISING AT LEAST ONE CONSTRUCTION FRAMEJanuary 2023March 2025Abandon2610NoNo
18004422REMOVABLE ROOFING SYSTEM COMPRISING A COMPENSATION DEVICEJanuary 2023August 2025Allow3110NoNo
18093810POSITIVE PRESSURE STRUCTUREJanuary 2023September 2025Abandon3320NoNo
18089181DEVICES, METHODS, AND SYSTEMS FOR INSTALLATION OF PHOTOVOLTAIC SYSTEMSDecember 2022November 2024Abandon2220NoNo
18087876SILL PAN SYSTEM FOR DOORS AND METHODS OF MAKING AND USING THE SAMEDecember 2022January 2025Allow2510NoNo
18087600FLOOR PANEL FOR FORMING A FLOOR COVERINGDecember 2022June 2023Allow610NoNo
18086358Access Panel And Method Of ManufactureDecember 2022February 2026Allow3821YesNo
18079127EDGE GUARD AND END CAP SYSTEM FOR A FIRE DOOR ASSEMBLYDecember 2022March 2025Allow2720YesNo
18077098SYNTHETIC MECHANICALLY ATTACHED ROOF UNDERLAYMENT SYSTEMDecember 2022October 2023Allow1010NoNo
18063043GUTTER GUARD WITH GIRDERDecember 2022January 2024Allow1410NoNo
18008610INSULATING GLAZING UNIT AND GLAZINGDecember 2022February 2025Abandon2710NoNo
17926587Dry-Construction Stud and Dry-Construction Wall with a Dry-Construction StudNovember 2022April 2025Allow2920NoNo
17925670Foundation FormworkNovember 2022February 2025Allow2710NoNo
17986257Pest-Control Structure for Photovoltaic InstallationsNovember 2022June 2024Allow1910YesNo
17985838BLOCKING COMPONENT FOR CONSTRUCTION FRAMING ASSEMBLY AND CONSTRUCTION FRAMING ASSEMBLY COMPRISING BLOCKING COMPONENTNovember 2022November 2024Abandon2420NoNo
18054613POLYETHYLENE TEREPHTHALATE (PET) PARTICULATE COMPOSITION FOR STRUCTURAL CONSTRUCTION COMPONENTSNovember 2022March 2026Abandon4001NoNo
18054117MODULAR BUILDING SYSTEM, APPARATUS AND METHODNovember 2022August 2023Allow910YesNo
18051699RAIL MOUNTING APPARATUS, SYSTEM AND METHOD OF SECURING DEVICES TO A STRUCTURENovember 2022June 2023Allow710NoNo
17977080SOLAR WINDOW CONSTRUCTION AND METHODSOctober 2022February 2024Allow1520NoNo
17997353RAPID CONNECTION SYSTEM FOR DETACHABLY HOLDING A FORMWORK SHELL AND FORMWORK BEAMOctober 2022May 2025Allow3110YesNo
17964352Energy Room as an Energy CenterOctober 2022February 2025Allow2810NoNo

Appeals Overview

This analysis examines appeal outcomes and the strategic value of filing appeals for examiner FONSECA, JESSIE T.

Patent Trial and Appeal Board (PTAB) Decisions

Total PTAB Decisions
15
Examiner Affirmed
10
(66.7%)
Examiner Reversed
5
(33.3%)
Reversal Percentile
53.8%
Higher than average

What This Means

With a 33.3% reversal rate, the PTAB reverses the examiner's rejections in a meaningful percentage of cases. This reversal rate is above the USPTO average, indicating that appeals have better success here than typical.

Strategic Value of Filing an Appeal

Total Appeal Filings
42
Allowed After Appeal Filing
10
(23.8%)
Not Allowed After Appeal Filing
32
(76.2%)
Filing Benefit Percentile
32.5%
Lower than average

Understanding Appeal Filing Strategy

Filing a Notice of Appeal can sometimes lead to allowance even before the appeal is fully briefed or decided by the PTAB. This occurs when the examiner or their supervisor reconsiders the rejection during the mandatory appeal conference (MPEP § 1207.01) after the appeal is filed.

In this dataset, 23.8% of applications that filed an appeal were subsequently allowed. This appeal filing benefit rate is below the USPTO average, suggesting that filing an appeal has limited effectiveness in prompting favorable reconsideration.

Strategic Recommendations

Appeals to PTAB show good success rates. If you have a strong case on the merits, consider fully prosecuting the appeal to a Board decision.

Filing a Notice of Appeal shows limited benefit. Consider other strategies like interviews or amendments before appealing.

Examiner FONSECA, JESSIE T - Prosecution Strategy Guide

Executive Summary

Examiner FONSECA, JESSIE T works in Art Unit 3633 and has examined 965 patent applications in our dataset. With an allowance rate of 61.6%, this examiner allows applications at a lower rate than most examiners at the USPTO. Applications typically reach final disposition in approximately 26 months.

Allowance Patterns

Examiner FONSECA, JESSIE T's allowance rate of 61.6% places them in the 22% percentile among all USPTO examiners. This examiner is less likely to allow applications than most examiners at the USPTO.

Office Action Patterns

On average, applications examined by FONSECA, JESSIE T receive 2.04 office actions before reaching final disposition. This places the examiner in the 53% percentile for office actions issued. This examiner issues a slightly above-average number of office actions.

Prosecution Timeline

The median time to disposition (half-life) for applications examined by FONSECA, JESSIE T is 26 months. This places the examiner in the 77% percentile for prosecution speed. Applications move through prosecution relatively quickly with this examiner.

Interview Effectiveness

Conducting an examiner interview provides a +23.8% benefit to allowance rate for applications examined by FONSECA, JESSIE T. This interview benefit is in the 70% percentile among all examiners. Recommendation: Interviews provide an above-average benefit with this examiner and are worth considering.

Request for Continued Examination (RCE) Effectiveness

When applicants file an RCE with this examiner, 23.7% of applications are subsequently allowed. This success rate is in the 33% percentile among all examiners. Strategic Insight: RCEs show below-average effectiveness with this examiner. Carefully evaluate whether an RCE or continuation is the better strategy.

After-Final Amendment Practice

This examiner enters after-final amendments leading to allowance in 39.1% of cases where such amendments are filed. This entry rate is in the 60% percentile among all examiners. Strategic Recommendation: This examiner shows above-average receptiveness to after-final amendments. If your amendments clearly overcome the rejections and do not raise new issues, consider filing after-final amendments before resorting to an RCE.

Pre-Appeal Conference Effectiveness

When applicants request a pre-appeal conference (PAC) with this examiner, 20.0% result in withdrawal of the rejection or reopening of prosecution. This success rate is in the 27% percentile among all examiners. Note: Pre-appeal conferences show below-average success with this examiner. Consider whether your arguments are strong enough to warrant a PAC request.

Appeal Withdrawal and Reconsideration

This examiner withdraws rejections or reopens prosecution in 55.9% of appeals filed. This is in the 28% percentile among all examiners. Of these withdrawals, 21.1% occur early in the appeal process (after Notice of Appeal but before Appeal Brief). Strategic Insight: This examiner shows below-average willingness to reconsider rejections during appeals. Be prepared to fully prosecute appeals if filed.

Petition Practice

When applicants file petitions regarding this examiner's actions, 71.0% are granted (fully or in part). This grant rate is in the 78% percentile among all examiners. Strategic Note: Petitions are frequently granted regarding this examiner's actions compared to other examiners. Per MPEP § 1002.02(c), various examiner actions are petitionable to the Technology Center Director, including prematureness of final rejection, refusal to enter amendments, and requirement for information. If you believe an examiner action is improper, consider filing a petition.

Examiner Cooperation and Flexibility

Examiner's Amendments: This examiner makes examiner's amendments in 4.0% of allowed cases (in the 83% percentile). Per MPEP § 1302.04, examiner's amendments are used to place applications in condition for allowance when only minor changes are needed. This examiner frequently uses this tool compared to other examiners, indicating a cooperative approach to getting applications allowed. Strategic Insight: If you are close to allowance but minor claim amendments are needed, this examiner may be willing to make an examiner's amendment rather than requiring another round of prosecution.

Quayle Actions: This examiner issues Ex Parte Quayle actions in 2.4% of allowed cases (in the 70% percentile). This examiner issues Quayle actions more often than average when claims are allowable but formal matters remain (MPEP § 714.14).

Prosecution Strategy Recommendations

Based on the statistical analysis of this examiner's prosecution patterns, here are tailored strategic recommendations:

  • Prepare for rigorous examination: With a below-average allowance rate, ensure your application has strong written description and enablement support. Consider filing a continuation if you need to add new matter.
  • Examiner cooperation: This examiner frequently makes examiner's amendments to place applications in condition for allowance. If you are close to allowance, the examiner may help finalize the claims.

Relevant MPEP Sections for Prosecution Strategy

  • MPEP § 713.10: Examiner interviews - available before Notice of Allowance or transfer to PTAB
  • MPEP § 714.12: After-final amendments - may be entered "under justifiable circumstances"
  • MPEP § 1002.02(c): Petitionable matters to Technology Center Director
  • MPEP § 1004: Actions requiring primary examiner signature (allowances, final rejections, examiner's answers)
  • MPEP § 1207.01: Appeal conferences - mandatory for all appeals
  • MPEP § 1214.07: Reopening prosecution after appeal

Important Disclaimer

Not Legal Advice: The information provided in this report is for informational purposes only and does not constitute legal advice. You should consult with a qualified patent attorney or agent for advice specific to your situation.

No Guarantees: We do not provide any guarantees as to the accuracy, completeness, or timeliness of the statistics presented above. Patent prosecution statistics are derived from publicly available USPTO data and are subject to data quality limitations, processing errors, and changes in USPTO practices over time.

Limitation of Liability: Under no circumstances will IronCrow AI be liable for any outcome, decision, or action resulting from your reliance on the statistics, analysis, or recommendations presented in this report. Past prosecution patterns do not guarantee future results.

Use at Your Own Risk: While we strive to provide accurate and useful prosecution statistics, you should independently verify any information that is material to your prosecution strategy and use your professional judgment in all patent prosecution matters.