USPTO Examiner BARLOW ADAM G - Art Unit 3633

Recent Applications

Detailed information about the 100 most recent patent applications.

Application NumberTitleFiling DateDisposal DateDispositionTime (months)Office ActionsRestrictionsInterviewAppeal
19220403One Piece Flood Panel Barrier for Residential and Commercial StructuresMay 2025July 2025Allow200NoNo
19219472ROOFING SYSTEM AND ASSOCIATED ROOFING SHINGLEMay 2025October 2025Allow510NoNo
18983887SAFETY RECOVERY SUPPORT FIXTUREDecember 2024February 2025Allow200NoNo
18979437MOMENT CONNECTION FOR STEEL FRAMED BUILDINGSDecember 2024June 2025Allow610NoNo
18957332INTERLOCKING PANELS WITH V-SHAPED SEAMSNovember 2024November 2025Allow1220NoNo
18794663SUPPORT STRUCTURE FOR FLOOD BARRIER PANELSAugust 2024September 2024Allow200NoNo
18740535VARIABLE FRICTION ENERGY DISSIPATION PREFABRICATED SEISMIC-DAMPING PARTITION WALL-FRAME STRUCTURE AND CONSTRUCTION METHOD THEREFORJune 2024September 2024Allow300NoNo
18737967DROP IN FIRE STOP ASSEMBLYJune 2024April 2025Allow1010NoNo
18668763ROOFING SYSTEM AND ASSOCIATED ROOFING SHINGLEMay 2024March 2025Allow1011YesNo
18636816Construction SystemApril 2024January 2025Allow1000NoNo
18623628VEHICLE DISPLAY SYSTEMS AND METHODSApril 2024January 2026Allow2100NoNo
18595976Siding Panel with Varying Profile and Siding SystemMarch 2024May 2025Allow1410NoNo
18587074Roofing Shingle System and Shingles for Use ThereinFebruary 2024March 2026Allow2421NoNo
18583512REINFORCED SLATWALL ASSEMBLYFebruary 2024February 2026Allow2420NoNo
18437069Tile Leveling SystemFebruary 2024February 2025Allow1201NoNo
18432897FLASHING ASSEMBLIES AND RELATED SYSTEMS AND METHODSFebruary 2024September 2024Allow710NoNo
18426642PREFABRICATED CONSTRUCTION WALL ASSEMBLYJanuary 2024September 2025Allow1910NoNo
18406157Arch for Metal Canopy Without WeldingJanuary 2024June 2025Allow1710NoNo
18400811PORTABLE AND MODULAR ENCLOSURE FOR ENGINE GENERATOR SETDecember 2023March 2025Abandon1401NoNo
18571629Web Member for Truss with High Sectional Strength and Assembled TrussDecember 2023August 2024Allow810NoNo
18543955PORTABLE SUPPORT PLATFORMDecember 2023October 2025Abandon2220NoNo
18514839Extruded Aluminum Roof Truss Manufacturing System and MethodsNovember 2023February 2025Abandon1501NoNo
18483451FIBER ENFORCED THIN BRICK SHEET AND PROCESSOctober 2023March 2025Abandon1720NoNo
18456156Systems and Methods for Flood PreventionAugust 2023July 2024Allow1110NoNo
18453512Modular Trim AssemblyAugust 2023May 2025Allow2100NoNo
18274857DEVICE FOR FASTENING A FINISHING STRIPJuly 2023August 2025Allow2510NoNo
18349743MASONRY PANEL AND FASTENER INSERTJuly 2023February 2026Allow3111NoNo
18344047Bulletproof Building Siding DeviceJune 2023January 2026Abandon3010NoNo
18336301DUCT SUPPORT ASSEMBLY AND METHOD OF USING A DUCT SUPPORTJune 2023August 2024Allow1411NoNo
18202843FACING BUILDING MEMBERMay 2023July 2025Abandon2621NoNo
18142870FIRE RESISTANT COMPOSITE POLE SYSTEMMay 2023February 2024Allow910NoNo
18251669CLADDING PANEL THAT COLLECTS AND/OR EMITS THERMAL ENERGYMay 2023September 2025Allow2800NoNo
18311570SYSTEM AND APPARATUS FOR SECURING A FLOORPLATE TO A STRUCTUREMay 2023April 2024Allow1200NoNo
18309655SHAPED STEEL COMBINATION STRUCTUREApril 2023October 2025Abandon3010NoNo
18031108METHOD OF APPLYING A FOIL ON AN INCLINED ROOF STRUCTUREApril 2023July 2025Allow2700NoNo
18129803INTEGRATED ROOF SYSTEM WITH ENGINEERED WOODMarch 2023January 2026Allow3311NoNo
18192706MODULAR BUILDING CONSTRUCTION SYSTEMMarch 2023February 2026Abandon3411NoNo
18127855CONCRETE VOID FORM AND METHOD OF MODULAR CONSTRUCTION THEREWITHMarch 2023January 2025Allow2131YesNo
18126326RAILING SYSTEM AND METHOD OF USE THEREOFMarch 2023July 2024Allow1620YesNo
18123385DEVICES AND METHODS FOR FITTING LUXURY VINYL FLOORCOVERING TO INTERIOR STAIRSMarch 2023December 2024Allow2120YesNo
18121560BUILDING TRUSS WIRE GUARD SYSTEM AND METHOD OF USEMarch 2023December 2025Abandon3321YesNo
18183010SYSTEMS AND METHODS FOR ANCHORING CURTAINWALLSMarch 2023September 2024Allow1801NoNo
18043993MOUNTING SYSTEM FOR BUILDING PANELSMarch 2023November 2023Allow810NoNo
18173975SYSTEM, METHOD, AND DEVICE FOR REINFORCEMENT OR REPAIR OF STRUCTURAL ELEMENTSFebruary 2023October 2025Abandon3201NoNo
18087486CONNECTOR FOR A MODULAR BUILDINGDecember 2022November 2023Allow1100NoNo
18065399ROOFING SYSTEM AND ASSOCIATED ROOFING SHINGLEDecember 2022April 2024Allow1620NoNo
18065444ROOFING SYSTEM AND ASSOCIATED ROOFING SHINGLEDecember 2022March 2025Abandon2720YesYes
18079915Transition mouldingDecember 2022December 2024Allow2400NoNo
18065304ROOFING SYSTEM AND ASSOCIATED ROOFING SHINGLEDecember 2022March 2024Allow1520YesYes
18061706PRETENSIONED MECHANICAL LOCKING DEVICE FOR BUILDING PANELSDecember 2022January 2026Allow3711NoNo
17991042SUPPORT SYSTEM FOR FOUNDATION WALLSNovember 2022December 2024Allow2511NoNo
17922893PANELNovember 2022January 2026Allow3811NoNo
17971330Modular Building Units, and Methods of Constructing and Transporting SameOctober 2022July 2024Allow2120NoNo
17964682SURFACE PANELOctober 2022May 2025Allow3120YesNo
17917286PANEL HAVING FRACTURE-RESISTANT COUPLING ELEMENTSOctober 2022January 2025Allow2710NoNo
17935727PURLIN CLIP ASSEMBLY AND SYSTEMSeptember 2022January 2025Allow2710NoNo
17934364FIRESTOP COLLARSeptember 2022December 2022Allow300NoNo
17946240FLOOR AND COLUMN STRUCTURESeptember 2022January 2025Abandon2801NoNo
17944161BOOTHSeptember 2022April 2025Allow3111NoNo
17941458FIBER REINFORCED RESIN-BASED TEMPORARY ROAD BARRIERSeptember 2022April 2025Allow3121NoNo
17900988ANCHOR PLATFORM ASSEMBLY WITH ANGLED BASEPLATESeptember 2022January 2024Allow1710NoNo
17897724SLATWALL ASSEMBLY AND ASSOCIATED METHOD OF INSTALLING THE SAMEAugust 2022September 2023Allow1310NoNo
17895505Passive Fire Protection DeviceAugust 2022February 2025Allow3011NoNo
17893260TANK BASEAugust 2022July 2025Allow3510NoNo
17892670ANCHOR PLATFORM ASSEMBLYAugust 2022April 2025Allow3121NoNo
17820447Insulation panel for use in building construction.August 2022November 2025Abandon3940NoNo
17820219ADJUSTABLE STEP FOUNDATIONAugust 2022September 2025Abandon3710NoNo
17886035Wall Panel SystemAugust 2022August 2024Allow2430YesNo
17884630SYSTEMS AND METHODS FOR MODULAR CONSTRUCTIONAugust 2022November 2025Allow4021NoNo
17865094BEAM COUPLER OPERATING AS A SEISMIC BRAKE, SEISMIC ENERGY DISSIPATION DEVICE AND SEISMIC DAMAGE CONTROL DEVICEJuly 2022August 2024Allow2521NoNo
17792194PREFABRICATED POST ASSEMBLYJuly 2022January 2023Allow700NoNo
17858534PROFILED PLASTIC SECTION FOR A METAL/PLASTIC COMPOSITE PROFILED SECTIONJuly 2022September 2023Allow1510NoNo
17851389Spliced Wall PanelJune 2022November 2024Abandon2920NoNo
17788928DROP IN FIRE STOP ASSEMBLYJune 2022April 2024Allow2210NoNo
17848527PROTECTING CONNECTORJune 2022October 2025Abandon4021NoNo
17787348STRUCTURAL INSULATED PANEL (SIP) FOR A MODULAR BUILDINGJune 2022October 2024Abandon2810NoNo
17842560BUILDING CLADDING SYSTEMS AND METHODS OF USE THEREOFJune 2022March 2025Allow3330YesNo
17838460Construction SystemJune 2022January 2024Allow1911NoNo
17784330Floor Panel with Separate Clip for a Vertical LockJune 2022August 2024Allow2610NoNo
17783874CONCRETE PRODUCT COMPRISING AN ADAPTIVE PRESTRESSING SYSTEM, AND METHOD OF LOCALLY PRESTRESSING A CONCRETE PRODUCTJune 2022January 2025Allow3111YesNo
17834120PROCESS FOR SECURING A DOOR TO AN OPENINGJune 2022September 2024Abandon2710NoNo
17833369RAINSCREEN SUPPORT SYSTEMJune 2022November 2024Allow2920NoNo
17829491SLATWALL ASSEMBLY AND ASSOCIATED METHOD OF INSTALLING THE SAMEJune 2022June 2023Allow1320NoNo
17664850FIBER ENFORCED THIN BRICK SHEET AND PROCESSMay 2022July 2024Abandon2620NoNo
17749705LOAD DISTRIBUTION AND ABSORPTION UNDERLAYMENT SYSTEM WITH TRANSITION FEATURESMay 2022August 2023Allow1410NoNo
17742427CONNECTION SYSTEM FOR VOLUMETRIC MODULAR CONSTRUCTIONMay 2022October 2024Abandon2911NoNo
17736223Roofing Shingle System and Shingles for Use ThereinMay 2022December 2023Allow1920NoNo
17774236SUPPORT STRUCTURE FOR WIND POWER GENERATION DEVICE AND WIND POWER GENERATION DEVICEMay 2022May 2024Allow2410NoNo
17725019DUAL CHANNEL DRAINAGE SEAL FOR CHANNELING WATER SEEPAGE AND MITIGATING RADON GAS ADMITTANCE IN A BASEMENT OR SUBTERRANEAN AREAApril 2022August 2024Allow2810YesNo
17722962Secure, Movable Vending StructureApril 2022August 2024Abandon2810NoNo
17714801RISER AND INGRESS DEVICE ASSEMBLY FOR SEPTIC TANK SYSTEMApril 2022October 2025Allow4321YesNo
17709827ACOUSTIC BUILDING PANELSMarch 2022May 2025Allow3721NoNo
17765739A MULTI-LAYERED STRUCTURAL AND MATERIAL SYSTEM ASSEMBLYMarch 2022May 2025Allow3710NoNo
17710150Rigid Articulated Batten Integrated Truss Devices, Systems, and MethodsMarch 2022June 2025Allow3920NoNo
17708553BUILDING CONTAINER OUTRIGGER AND METHODS OF USEMarch 2022May 2024Allow2500NoNo
17703120MAINTAINING WATER BARRIER ABOVE RISING WATERMarch 2022September 2023Allow1710NoNo
17637611IMPROVED COMPONENT OF A MODULAR BUILDINGFebruary 2022November 2023Abandon2020NoNo
17597861A BRICK SLIP PANEL AND A METHOD OF MANUFACTURE A BRICK SLIP PANELJanuary 2022June 2024Abandon2901NoNo
17578577Student Enclosure AssemblyJanuary 2022April 2025Abandon3920NoNo
17564974Stanchion Surrounding AssemblyDecember 2021January 2024Allow2510NoNo

Appeals Overview

This analysis examines appeal outcomes and the strategic value of filing appeals for examiner BARLOW, ADAM G.

Patent Trial and Appeal Board (PTAB) Decisions

Total PTAB Decisions
3
Examiner Affirmed
2
(66.7%)
Examiner Reversed
1
(33.3%)
Reversal Percentile
53.8%
Higher than average

What This Means

With a 33.3% reversal rate, the PTAB reverses the examiner's rejections in a meaningful percentage of cases. This reversal rate is above the USPTO average, indicating that appeals have better success here than typical.

Strategic Value of Filing an Appeal

Total Appeal Filings
18
Allowed After Appeal Filing
7
(38.9%)
Not Allowed After Appeal Filing
11
(61.1%)
Filing Benefit Percentile
64.2%
Higher than average

Understanding Appeal Filing Strategy

Filing a Notice of Appeal can sometimes lead to allowance even before the appeal is fully briefed or decided by the PTAB. This occurs when the examiner or their supervisor reconsiders the rejection during the mandatory appeal conference (MPEP § 1207.01) after the appeal is filed.

In this dataset, 38.9% of applications that filed an appeal were subsequently allowed. This appeal filing benefit rate is above the USPTO average, suggesting that filing an appeal can be an effective strategy for prompting reconsideration.

Strategic Recommendations

✓ Appeals to PTAB show good success rates. If you have a strong case on the merits, consider fully prosecuting the appeal to a Board decision.

✓ Filing a Notice of Appeal is strategically valuable. The act of filing often prompts favorable reconsideration during the mandatory appeal conference.

Examiner BARLOW, ADAM G - Prosecution Strategy Guide

Executive Summary

Examiner BARLOW, ADAM G works in Art Unit 3633 and has examined 821 patent applications in our dataset. With an allowance rate of 72.7%, this examiner has a below-average tendency to allow applications. Applications typically reach final disposition in approximately 23 months.

Allowance Patterns

Examiner BARLOW, ADAM G's allowance rate of 72.7% places them in the 36% percentile among all USPTO examiners. This examiner has a below-average tendency to allow applications.

Office Action Patterns

On average, applications examined by BARLOW, ADAM G receive 1.64 office actions before reaching final disposition. This places the examiner in the 33% percentile for office actions issued. This examiner issues fewer office actions than average, which may indicate efficient prosecution or a more lenient examination style.

Prosecution Timeline

The median time to disposition (half-life) for applications examined by BARLOW, ADAM G is 23 months. This places the examiner in the 87% percentile for prosecution speed. Applications move through prosecution relatively quickly with this examiner.

Interview Effectiveness

Conducting an examiner interview provides a +17.6% benefit to allowance rate for applications examined by BARLOW, ADAM G. This interview benefit is in the 59% percentile among all examiners. Recommendation: Interviews provide an above-average benefit with this examiner and are worth considering.

Request for Continued Examination (RCE) Effectiveness

When applicants file an RCE with this examiner, 29.6% of applications are subsequently allowed. This success rate is in the 56% percentile among all examiners. Strategic Insight: RCEs show above-average effectiveness with this examiner. Consider whether your amendments or new arguments are strong enough to warrant an RCE versus filing a continuation.

After-Final Amendment Practice

This examiner enters after-final amendments leading to allowance in 58.2% of cases where such amendments are filed. This entry rate is in the 84% percentile among all examiners. Strategic Recommendation: This examiner is highly receptive to after-final amendments compared to other examiners. Per MPEP § 714.12, after-final amendments may be entered "under justifiable circumstances." Consider filing after-final amendments with a clear showing of allowability rather than immediately filing an RCE, as this examiner frequently enters such amendments.

Pre-Appeal Conference Effectiveness

When applicants request a pre-appeal conference (PAC) with this examiner, 80.0% result in withdrawal of the rejection or reopening of prosecution. This success rate is in the 63% percentile among all examiners. Strategic Recommendation: Pre-appeal conferences show above-average effectiveness with this examiner. If you have strong arguments, a PAC request may result in favorable reconsideration.

Appeal Withdrawal and Reconsideration

This examiner withdraws rejections or reopens prosecution in 83.3% of appeals filed. This is in the 77% percentile among all examiners. Of these withdrawals, 66.7% occur early in the appeal process (after Notice of Appeal but before Appeal Brief). Strategic Insight: This examiner frequently reconsiders rejections during the appeal process compared to other examiners. Per MPEP § 1207.01, all appeals must go through a mandatory appeal conference. Filing a Notice of Appeal may prompt favorable reconsideration even before you file an Appeal Brief.

Petition Practice

When applicants file petitions regarding this examiner's actions, 56.4% are granted (fully or in part). This grant rate is in the 58% percentile among all examiners. Strategic Note: Petitions show above-average success regarding this examiner's actions. Petitionable matters include restriction requirements (MPEP § 1002.02(c)(2)) and various procedural issues.

Examiner Cooperation and Flexibility

Examiner's Amendments: This examiner makes examiner's amendments in 2.2% of allowed cases (in the 76% percentile). Per MPEP § 1302.04, examiner's amendments are used to place applications in condition for allowance when only minor changes are needed. This examiner frequently uses this tool compared to other examiners, indicating a cooperative approach to getting applications allowed. Strategic Insight: If you are close to allowance but minor claim amendments are needed, this examiner may be willing to make an examiner's amendment rather than requiring another round of prosecution.

Quayle Actions: This examiner issues Ex Parte Quayle actions in 0.0% of allowed cases (in the 38% percentile). This examiner issues Quayle actions less often than average. Allowances may come directly without a separate action for formal matters.

Prosecution Strategy Recommendations

Based on the statistical analysis of this examiner's prosecution patterns, here are tailored strategic recommendations:

  • Consider after-final amendments: This examiner frequently enters after-final amendments. If you can clearly overcome rejections with claim amendments, file an after-final amendment before resorting to an RCE.
  • Appeal filing as negotiation tool: This examiner frequently reconsiders rejections during the appeal process. Filing a Notice of Appeal may prompt favorable reconsideration during the mandatory appeal conference.
  • Examiner cooperation: This examiner frequently makes examiner's amendments to place applications in condition for allowance. If you are close to allowance, the examiner may help finalize the claims.

Relevant MPEP Sections for Prosecution Strategy

  • MPEP § 713.10: Examiner interviews - available before Notice of Allowance or transfer to PTAB
  • MPEP § 714.12: After-final amendments - may be entered "under justifiable circumstances"
  • MPEP § 1002.02(c): Petitionable matters to Technology Center Director
  • MPEP § 1004: Actions requiring primary examiner signature (allowances, final rejections, examiner's answers)
  • MPEP § 1207.01: Appeal conferences - mandatory for all appeals
  • MPEP § 1214.07: Reopening prosecution after appeal

Important Disclaimer

Not Legal Advice: The information provided in this report is for informational purposes only and does not constitute legal advice. You should consult with a qualified patent attorney or agent for advice specific to your situation.

No Guarantees: We do not provide any guarantees as to the accuracy, completeness, or timeliness of the statistics presented above. Patent prosecution statistics are derived from publicly available USPTO data and are subject to data quality limitations, processing errors, and changes in USPTO practices over time.

Limitation of Liability: Under no circumstances will IronCrow AI be liable for any outcome, decision, or action resulting from your reliance on the statistics, analysis, or recommendations presented in this report. Past prosecution patterns do not guarantee future results.

Use at Your Own Risk: While we strive to provide accurate and useful prosecution statistics, you should independently verify any information that is material to your prosecution strategy and use your professional judgment in all patent prosecution matters.