| Application Number | Title | Filing Date | Disposal Date | Disposition | Time (months) | Office Actions | Restrictions | Interview | Appeal |
|---|---|---|---|---|---|---|---|---|---|
| 19219859 | AI AGENT-DRIVEN INTERACTION MODEL FOR APPLICATIONS | May 2025 | September 2025 | Allow | 3 | 0 | 0 | Yes | No |
| 19214099 | REUSING THREAD IDENTIFICATION VALUES WHEN EXECUTING CONCURRENT THREADS | May 2025 | July 2025 | Allow | 2 | 0 | 0 | No | No |
| 19212942 | SYSTEM AND METHOD FOR MONITORING AND MANAGING COMPUTERIZED RESOURCES IN A COMPUTER CLUSTER ENVIRONMENT | May 2025 | October 2025 | Allow | 5 | 1 | 0 | No | No |
| 19210278 | ACYCLIC ARCHITECTURE FOR AI PROCESSORS | May 2025 | August 2025 | Allow | 3 | 1 | 0 | No | No |
| 19206035 | METHODS, SYSTEMS, AND STORAGE MEDIA FOR COMPUTATION SCHEDULING BASED ON IIOT DATA CENTERS | May 2025 | August 2025 | Allow | 3 | 0 | 0 | No | No |
| 19179572 | SEQUENTIAL WORKFLOW ORCHESTRATION MODEL SYSTEM AND METHOD | April 2025 | October 2025 | Allow | 7 | 1 | 0 | No | No |
| 19068551 | METHOD OF HANDLING A FAILURE IN A TASK PIPELINE BETWEEN A SOURCE OF ALERTS AND A SECURITY INCIDENT & EVENT MANAGEMENT (SIEM) SYSTEM | March 2025 | May 2025 | Allow | 3 | 0 | 0 | Yes | No |
| 19064870 | SYSTEMS AND METHODS FOR GENERATING AND EXECUTING FUNCTION CALLS USING MACHINE LEARNING | February 2025 | January 2026 | Allow | 10 | 2 | 0 | Yes | No |
| 19049229 | METHODS AND SYSTEMS FOR DYNAMICALLY OPTIMIZING AND MODIFYING ALLOCATION OF VIRTUAL RESOURCES TO PROCESSES | February 2025 | May 2025 | Allow | 3 | 0 | 0 | Yes | No |
| 19048513 | DYNAMICALLY COMPOSABLE DATA-IN-PLACE SYSTEM | February 2025 | April 2025 | Allow | 2 | 0 | 0 | No | No |
| 19033142 | SECURED TRANSFER MEDIUM MANAGEMENT AND GRADUATION | January 2025 | April 2025 | Allow | 2 | 0 | 0 | No | No |
| 19029511 | AUTOMATED RIGHTSIZING OF CONTAINERIZED APPLICATION WITH OPTIMIZED HORIZONTAL SCALING | January 2025 | November 2025 | Allow | 10 | 1 | 0 | Yes | No |
| 19007053 | EVENT-DRIVEN RESOURCE EXECUTION ARCHITECTURE | December 2024 | June 2025 | Allow | 6 | 2 | 0 | Yes | No |
| 18878029 | TASK SCHEDULING METHOD AND APPARATUS, ELECTRONIC DEVICE, AND STORAGE MEDIUM | December 2024 | March 2025 | Allow | 3 | 0 | 0 | Yes | No |
| 18991123 | Apparatus and Methods for Generating A Technical Debt Management and Data Management Machine | December 2024 | February 2025 | Allow | 2 | 0 | 0 | Yes | No |
| 18988678 | SERVICE INSTANCE SCHEDULING METHOD, AN ELECTRONIC DEVICE, AND A STORAGE MEDIUM | December 2024 | March 2025 | Allow | 3 | 0 | 0 | Yes | No |
| 18988714 | PROCESSING TASK DISTRIBUTION AND RECOVERY | December 2024 | February 2025 | Allow | 2 | 0 | 0 | Yes | No |
| 18988734 | Machine Learning Technique for Efficiently Scheduling Tasks for Large-Scale Analysis of Binary Executables | December 2024 | April 2025 | Allow | 4 | 1 | 0 | Yes | No |
| 18987197 | SYSTEMS AND METHODS TO FACILITATE ADAPTIVE RESOURCE CAPACITY PREDICTION AND CONTROL USING CLOUD INFRASTRUCTURES WITH A CAPACITY PREDICTION INTERFACE | December 2024 | June 2025 | Allow | 6 | 1 | 0 | Yes | No |
| 18983455 | RULES-BASED RESOURCE DISTRIBUTION | December 2024 | October 2025 | Allow | 10 | 2 | 0 | Yes | No |
| 18972692 | UNDERPROVISIONING IN CONTAINERIZED ENVIRONMENTS | December 2024 | December 2025 | Allow | 12 | 2 | 0 | Yes | No |
| 18969593 | HARDWARE APPARATUS FOR NETWORK COMMUNICATIONS | December 2024 | February 2025 | Allow | 2 | 0 | 0 | No | No |
| 18968095 | METHOD AND APPARATUS FOR BASELINE MONITORING AND ALARMING, COMPUTER DEVICE, AND STORAGE MEDIUM | December 2024 | January 2026 | Allow | 14 | 2 | 0 | No | No |
| 18951880 | SECURITY INCIDENT & EVENT MANAGEMENT CASE CREATION SYSTEM AND METHOD | November 2024 | January 2025 | Allow | 2 | 0 | 0 | Yes | No |
| 18939286 | DATA RESOURCE HEALTH MAINTENANCE METHOD AND APPARATUS, AND DEVICE | November 2024 | January 2025 | Allow | 3 | 0 | 0 | Yes | No |
| 18922050 | SYSTEM AND METHOD FOR MANAGING AI AGENTS USING CENTRAL AGENT NAME AND ATTRIBUTE REGISTRY | October 2024 | January 2025 | Allow | 3 | 0 | 0 | No | No |
| 18917643 | CONTEXT-AWARE APPLICATION PROVISIONING | October 2024 | July 2025 | Allow | 9 | 2 | 0 | Yes | No |
| 18906863 | COMMUNICATION AND COMPUTATION INTEGRATED NETWORK ARCHITECTURE AND RESOURCE ADAPTATION METHOD | October 2024 | January 2025 | Allow | 3 | 0 | 0 | No | No |
| 18905078 | Machine Learning Technique for Efficiently Scheduling Tasks for Large-Scale Analysis of Binary Executables | October 2024 | December 2024 | Allow | 2 | 0 | 0 | No | No |
| 18901209 | METHOD FOR THE COMPUTER-AIDED EXECUTION OF A TECHNICAL PROCESS IN PROCESSING UNITS, COMPUTING ENVIRONMENT, AND STORAGE MEDIUM | September 2024 | June 2025 | Allow | 9 | 0 | 0 | Yes | No |
| 18900098 | BUILDING MANAGEMENT SYSTEMS WITH SUSTAINABILITY IMPROVEMENT ARCHITECTURES | September 2024 | July 2025 | Allow | 10 | 1 | 0 | Yes | No |
| 18892972 | NEURAL NETWORK SYSTEMS FOR SOURCE CODE GENERATION AND RANKING | September 2024 | April 2025 | Allow | 6 | 1 | 0 | Yes | No |
| 18827286 | SYSTEMS AND METHODS FOR DYNAMIC ALLOCATION OF COMPUTE RESOURCES VIA A MACHINE LEARNING-INFORMED FEEDBACK SEQUENCE | September 2024 | December 2025 | Allow | 16 | 1 | 0 | Yes | No |
| 18844249 | Method, System, and Computer Program Product for Dynamic Data Allocation to Nodes in Distributed Systems | September 2024 | March 2025 | Allow | 6 | 0 | 0 | Yes | No |
| 18817035 | METHOD FOR PROCESSING INFORMATION | August 2024 | February 2025 | Allow | 6 | 1 | 0 | No | No |
| 18794248 | SECURITY INCIDENT & EVENT MANAGEMENT CASE CREATION SYSTEM AND METHOD | August 2024 | October 2024 | Allow | 3 | 0 | 0 | No | No |
| 18785954 | SYSTEMS AND METHODS TO FACILITATE ADAPTIVE RESOURCE CAPACITY PREDICTION AND CONTROL USING CLOUD INFRASTRUCTURES | July 2024 | December 2024 | Allow | 4 | 0 | 0 | Yes | No |
| 18785993 | SYSTEMS AND METHODS TO FACILITATE ADAPTIVE RESOURCE CAPACITY PREDICTION AND CONTROL USING CLOUD INFRASTRUCTURES WITH A CAPACITY PREDICTION INTERFACE | July 2024 | December 2024 | Allow | 5 | 1 | 0 | Yes | No |
| 18759563 | METHODS AND SYSTEMS OF SCHEDULING COMPUTER PROCESSES OR TASKS IN A DISTRIBUTED SYSTEM | June 2024 | February 2025 | Allow | 7 | 0 | 0 | Yes | No |
| 18756694 | SYSTEMS AND METHODS FOR MANAGING MULTI-COMPONENT, MULTI-DEPLOYMENT INFRASTRUCTURE-AS-CODE CONFIGURATIONS FOR CLOUD COMPUTING PLATFORMS | June 2024 | January 2025 | Allow | 7 | 1 | 0 | Yes | No |
| 18757455 | Apparatus and Methods for Generating A Technical Debt Management and Data Management Machine | June 2024 | August 2024 | Allow | 2 | 0 | 0 | No | No |
| 18754011 | APPLICATION PROGRAMMING INTERFACE TO CAUSE GRAPH CODE TO WAIT ON A SEMAPHORE | June 2024 | July 2025 | Allow | 13 | 1 | 0 | Yes | No |
| 18749893 | CONTEXT ENGINE TEST GENERATION | June 2024 | June 2025 | Allow | 12 | 2 | 0 | Yes | No |
| 18748627 | GRAPHICAL USER INTERFACE FOR AUTOMATICALLY GENERATING SOFTWARE TESTS | June 2024 | July 2025 | Allow | 13 | 2 | 0 | Yes | No |
| 18748682 | OPTIMIZING CLOUD INSTANCES WITH SMART AVAILABILITY ZONE FAILOVER | June 2024 | March 2025 | Allow | 9 | 2 | 0 | Yes | No |
| 18745889 | SYSTEM AND METHODS FOR USING CONTAINER LAYERS TO FACILITATE CLOUD RESOURCE SHARING AND DECREASE STARTUP TIMES | June 2024 | May 2025 | Allow | 11 | 1 | 0 | No | No |
| 18745825 | OFFLOADING PACKET PROCESSING PROGRAMS FROM VIRTUAL MACHINES TO A HYPERVISOR AND EFFICIENTLY EXECUTING THE OFFLOADED PACKET PROCESSING PROGRAMS | June 2024 | March 2025 | Allow | 9 | 0 | 0 | Yes | No |
| 18745855 | APPLICATION PROGRAMMING INTERFACE TO CAUSE GRAPH CODE TO WAIT ON A SEMAPHORE | June 2024 | July 2025 | Allow | 13 | 1 | 0 | Yes | No |
| 18739658 | SYSTEM AND METHOD FOR OBSERVING AND PREDICTING DATA BATCH ACTIVITY IN REAL TIME | June 2024 | September 2024 | Allow | 3 | 1 | 0 | No | No |
| 18737728 | COMMON PRIORITY INFORMATION FOR MULTIPLE RESOURCE ARBITRATION | June 2024 | August 2025 | Allow | 14 | 2 | 0 | No | No |
| 18736305 | Examining A Cloud-Based Storage System Using Codified States | June 2024 | January 2026 | Allow | 20 | 2 | 0 | Yes | No |
| 18736094 | AUTOMATED RIGHTSIZING OF CONTAINERIZED APPLICATION WITH OPTIMIZED HORIZONTAL SCALING | June 2024 | September 2025 | Abandon | 16 | 1 | 0 | No | No |
| 18734459 | NOTICED-BASED RESOURCE SITE CURTAILMENT | June 2024 | August 2024 | Allow | 3 | 0 | 0 | No | No |
| 18733588 | OPERATIONAL VALUE OPTIMIZATION FOR DATA CENTER POWER AND COMPUTATIONAL LOAD | June 2024 | September 2024 | Allow | 4 | 1 | 0 | Yes | No |
| 18732320 | DYNAMICALLY SELECTING ARTIFICIAL INTELLIGENCE MODELS AND HARDWARE ENVIRONMENTS TO EXECUTE TASKS | June 2024 | November 2024 | Allow | 5 | 3 | 0 | Yes | No |
| 18732305 | DYNAMICALLY SELECTING ARTIFICIAL INTELLIGENCE MODELS AND HARDWARE ENVIRONMENTS TO EXECUTE TASKS | June 2024 | April 2025 | Allow | 10 | 2 | 0 | Yes | No |
| 18732297 | DYNAMICALLY SELECTING ARTIFICIAL INTELLIGENCE MODELS AND HARDWARE ENVIRONMENTS TO EXECUTE TASKS | June 2024 | August 2025 | Allow | 15 | 3 | 0 | Yes | No |
| 18680247 | DIFFERENTIAL CONTROL OF AGGREGATED CRYPTOGRAPHIC HARDWARE ASSETS | May 2024 | March 2025 | Allow | 10 | 2 | 0 | Yes | No |
| 18677805 | METHOD, AN APPARATUS, AN ELECTRONIC DEVICE, AND A STORAGE MEDIUM FOR DETECTING VIRTUAL MACHINE LOAD | May 2024 | August 2024 | Allow | 2 | 0 | 0 | No | No |
| 18676219 | Methods and User Interface Generation and Application Modification | May 2024 | July 2025 | Allow | 14 | 1 | 0 | No | No |
| 18669635 | MANAGING COMPUTER WORKLOADS ACROSS DISTRIBUTED COMPUTING CLUSTERS | May 2024 | February 2025 | Allow | 9 | 1 | 0 | Yes | No |
| 18667804 | MANAGING PROXY VIRTUAL MACHINES | May 2024 | July 2025 | Allow | 14 | 1 | 0 | No | No |
| 18653936 | MAGNIFYING RESOURCES FOR A LOCATION | May 2024 | July 2024 | Allow | 3 | 0 | 0 | Yes | No |
| 18639016 | METHOD, DEVICE, COMPUTER DEVICE AND STORAGE DEVICE FOR REQUEST PROCESSING | April 2024 | June 2024 | Allow | 2 | 0 | 0 | Yes | No |
| 18637362 | DYNAMICALLY VALIDATING AI APPLICATIONS FOR COMPLIANCE | April 2024 | August 2024 | Allow | 4 | 1 | 0 | Yes | No |
| 18636749 | DISAGGREGATED COMPUTING FOR DISTRIBUTED CONFIDENTIAL COMPUTING ENVIRONMENT | April 2024 | April 2025 | Allow | 12 | 1 | 0 | No | No |
| 18636927 | MANAGING A DIGITAL ASSISTANT WORKFLOW | April 2024 | February 2025 | Allow | 10 | 2 | 0 | No | No |
| 18635240 | System And Method For Upgrading Sparkline Cluster With Zero Downtime | April 2024 | June 2025 | Allow | 14 | 1 | 0 | Yes | No |
| 18635907 | SYSTEMS AND METHODS OF AUTO-SCALING A VIRTUAL DESKTOP ENVIRONMENT | April 2024 | November 2024 | Allow | 7 | 0 | 0 | Yes | No |
| 18627375 | SYSTEMS AND METHODS FOR DYNAMIC ALLOCATION OF COMPUTE RESOURCES VIA A MACHINE LEARNING-INFORMED FEEDBACK SEQUENCE | April 2024 | September 2024 | Allow | 6 | 1 | 0 | Yes | No |
| 18625771 | MANYCORE SYSTEM | April 2024 | September 2024 | Allow | 6 | 1 | 0 | Yes | No |
| 18624288 | ADAPTIVE CPU USAGE MECHANISM FOR NETWORKING SYSTEM IN A VIRTUAL ENVIRONMENT | April 2024 | April 2025 | Allow | 13 | 1 | 0 | No | No |
| 18621895 | COMMAND PROCESSOR, NEURAL PROCESSING SYSTEM AND METHOD FOR TRANSMITTING DATA THEREOF | March 2024 | December 2024 | Allow | 9 | 1 | 0 | No | No |
| 18621936 | COMMAND PROCESSOR, NEURAL CORE SOC AND METHOD FOR OBTAINING CONTEXT DATA USING THE SAME | March 2024 | October 2024 | Allow | 7 | 1 | 0 | No | No |
| 18622214 | NEURAL PROCESSING DEVICE, NEURAL PROCESSING SYSTEM AND METHOD FOR PROCESSING COMMAND BRANCH OF NEURAL PROCESSING DEVICE | March 2024 | August 2024 | Allow | 4 | 0 | 0 | Yes | No |
| 18611615 | Methods for User Interface Generation and Application Modification | March 2024 | August 2025 | Allow | 17 | 2 | 0 | Yes | No |
| 18597105 | RECONCILING RESOURCE MANAGEMENT PLATFORMS | March 2024 | March 2026 | Allow | 24 | 1 | 0 | Yes | No |
| 18597070 | SYSTEMS AND METHODS FOR VIDEO/AUDIO PRODUCTION AND ARCHITECTURE TO OPTIMIZE UNUSED CAPACITY | March 2024 | April 2025 | Allow | 13 | 1 | 0 | Yes | No |
| 18585018 | SYSTEMS AND METHODS FOR CUSTOMIZATION OF WORKFLOW DESIGN | February 2024 | March 2025 | Allow | 12 | 1 | 0 | No | No |
| 18584281 | VIRTUAL SERVER AGENT LOAD BALANCING | February 2024 | January 2025 | Allow | 11 | 1 | 0 | No | No |
| 18441697 | ON-CHIP COMMUNICATION ARCHITECTURE FOR A HETEROGENOUS SYSTEM | February 2024 | December 2024 | Allow | 10 | 2 | 0 | Yes | No |
| 18437065 | TECHNIQUES FOR DISTRIBUTED COMPUTING AND STORAGE | February 2024 | September 2024 | Allow | 7 | 1 | 0 | Yes | No |
| 18437039 | TECHNIQUES FOR DISTRIBUTED COMPUTING AND STORAGE | February 2024 | July 2024 | Allow | 6 | 1 | 0 | No | No |
| 18434110 | System and Method for Queuing Work within a Virtualized Scheduler Based on In-Unit Accounting of In-Unit Entries | February 2024 | September 2024 | Allow | 7 | 0 | 0 | Yes | No |
| 18429269 | MANAGING COMPUTER RESOURCES FOR CLINICAL APPLICATIONS | January 2024 | January 2026 | Allow | 24 | 1 | 0 | Yes | No |
| 18428778 | GENERATING FAULT CONDITIONS USING A FAULT-ENABLED SOFTWARE DEVELOPMENT KIT | January 2024 | February 2025 | Allow | 13 | 1 | 0 | No | No |
| 18428544 | TECHNIQUES FOR BEHAVIORAL PAIRING IN A TASK ASSIGNMENT SYSTEM | January 2024 | February 2026 | Allow | 24 | 3 | 0 | No | No |
| 18421848 | SIMULTANEOUS MULTI-THREADED PROCESSING FOR EXECUTING MULTIPLE WORKLOADS WITH INTERFERENCE PREVENTION | January 2024 | July 2024 | Allow | 6 | 1 | 0 | Yes | No |
| 18417445 | METHOD AND APPARATUS FOR MANAGING THREADS IN MANYCORE | January 2024 | July 2024 | Allow | 6 | 1 | 0 | No | No |
| 18416481 | SMARTNIC BASED VIRTUAL SPLITTER ENSURING MICROSECOND LATENCIES | January 2024 | May 2025 | Allow | 16 | 0 | 0 | No | No |
| 18412105 | EXECUTION OF AUXILIARY FUNCTIONS IN AN ON-DEMAND NETWORK CODE EXECUTION SYSTEM | January 2024 | January 2025 | Allow | 13 | 1 | 0 | No | No |
| 18405380 | System in the Middle Transaction Processor | January 2024 | December 2024 | Allow | 11 | 1 | 0 | No | No |
| 18402659 | COMPLEX COMPUTING NETWORK FOR CONTROLLING COMPUTING OPERATIONS BASED ON A COMPUTING LOAD | January 2024 | May 2024 | Allow | 4 | 0 | 0 | No | No |
| 18574436 | Vehicle, Computing System, Operating Method of Computing System and Computer Program | December 2023 | June 2025 | Allow | 18 | 1 | 0 | Yes | No |
| 18394232 | HYBRID VIRTUAL GPU CO-SCHEDULING | December 2023 | November 2025 | Abandon | 23 | 2 | 0 | No | No |
| 18395473 | TRANSACTION SCHEDULING FOR A USER DATA CACHE BY ASSESSING UPDATE CRITERIA | December 2023 | March 2025 | Allow | 14 | 1 | 0 | No | No |
| 18544249 | CONTROLLING SCHEDULING OF A GPU | December 2023 | December 2025 | Allow | 24 | 2 | 0 | No | No |
| 18544348 | HIGHLY EFFICIENT INEXACT COMPUTING STORAGE DEVICE | December 2023 | April 2025 | Allow | 16 | 1 | 0 | Yes | No |
| 18541063 | SOFTWARE LOG PROCESSING METHOD | December 2023 | July 2024 | Allow | 7 | 2 | 0 | No | No |
| 18540196 | VIRTUAL MACHINE BACKUP FROM COMPUTING ENVIRONMENT TO STORAGE ENVIRONMENT | December 2023 | March 2025 | Allow | 16 | 1 | 0 | Yes | No |
This analysis examines appeal outcomes and the strategic value of filing appeals for art-unit 2196.
With a 18.3% reversal rate, the PTAB affirms the examiner's rejections in the vast majority of cases. This reversal rate is in the bottom 25% across the USPTO, indicating that appeals face significant challenges here.
Filing a Notice of Appeal can sometimes lead to allowance even before the appeal is fully briefed or decided by the PTAB. This occurs when the examiner or their supervisor reconsiders the rejection during the mandatory appeal conference (MPEP § 1207.01) after the appeal is filed.
In this dataset, 40.6% of applications that filed an appeal were subsequently allowed. This appeal filing benefit rate is in the top 25% across the USPTO, indicating that filing appeals is particularly effective here. The act of filing often prompts favorable reconsideration during the mandatory appeal conference.
⚠ Appeals to PTAB face challenges. Ensure your case has strong merit before committing to full Board review.
✓ Filing a Notice of Appeal is strategically valuable. The act of filing often prompts favorable reconsideration during the mandatory appeal conference.
Art Unit 2196 is part of Group 2190 in Technology Center 2100. This art unit has examined 8,199 patent applications in our dataset, with an overall allowance rate of 83.9%. Applications typically reach final disposition in approximately 30 months.
Art Unit 2196's allowance rate of 83.9% places it in the 77% percentile among all USPTO art units. This art unit has a significantly higher allowance rate than most art units at the USPTO.
Applications in Art Unit 2196 receive an average of 1.91 office actions before reaching final disposition (in the 51% percentile). The median prosecution time is 30 months (in the 54% percentile).
When prosecuting applications in this art unit, consider the following:
Not Legal Advice: The information provided in this report is for informational purposes only and does not constitute legal advice. You should consult with a qualified patent attorney or agent for advice specific to your situation.
No Guarantees: We do not provide any guarantees as to the accuracy, completeness, or timeliness of the statistics presented above. Patent prosecution statistics are derived from publicly available USPTO data and are subject to data quality limitations, processing errors, and changes in USPTO practices over time.
Limitation of Liability: Under no circumstances will IronCrow AI be liable for any outcome, decision, or action resulting from your reliance on the statistics, analysis, or recommendations presented in this report. Past prosecution patterns do not guarantee future results.
Use at Your Own Risk: While we strive to provide accurate and useful prosecution statistics, you should independently verify any information that is material to your prosecution strategy and use your professional judgment in all patent prosecution matters.