Detailed information about the 100 most recent patent applications.
| Application Number | Title | Filing Date | Disposal Date | Disposition | Time (months) | Office Actions | Restrictions | Interview | Appeal |
|---|---|---|---|---|---|---|---|---|---|
| 19305454 | SYSTEMS AND METHODS FOR DETERMINING TARGET ALLOCATION PARAMETERS FOR INITIATING TARGETED COMMUNICATIONS IN COMPLEX COMPUTING NETWORKS | August 2025 | February 2026 | Allow | 5 | 0 | 0 | No | No |
| 19274090 | Scheduling a request using an inference large scale model and rescheduling on a different inference large scale model in response to not meeting a condition | July 2025 | September 2025 | Allow | 2 | 0 | 0 | Yes | No |
| 19260306 | SYSTEM AND METHOD FOR OPERATION, MAINTENANCE, AND RESOURCE MANAGEMENT OF MEGA-CONSTELLATIONS BASED ON COMPUTING-NETWORK INTEGRATION | July 2025 | August 2025 | Allow | 2 | 0 | 0 | No | No |
| 19214907 | SYSTEMS AND METHODS FOR DETERMINING TARGET ALLOCATION PARAMETERS FOR INITIATING TARGETED COMMUNICATIONS IN COMPLEX COMPUTING NETWORKS | May 2025 | June 2025 | Allow | 1 | 0 | 0 | No | No |
| 19212424 | PROCESSING DEVICE AND METHOD FOR MANAGING TASKS THEREOF | May 2025 | July 2025 | Allow | 2 | 0 | 0 | No | No |
| 19096698 | METHODS FOR DYNAMICALLY GENERATING GENERATIVE OPERATING SYSTEMS BASED ON HARDWARE AND SOFTWARE ENVIRONMENT FEATURE | March 2025 | October 2025 | Allow | 7 | 1 | 0 | No | No |
| 19056633 | SYSTEMS AND METHODS FOR COMPUTING PROCESS MANAGEMENT AND COMPUTING RESOURCE ALLOCATION USING SERVERLESS CLOUD COMPUTATIONAL COMPUTING MODELS | February 2025 | September 2025 | Allow | 7 | 1 | 0 | Yes | No |
| 19049359 | SYSTEM AND METHOD FOR IMPROVED DATA MIGRATION BETWEEN AN RDBMS SOURCE AND RDBMS TARGET | February 2025 | August 2025 | Allow | 6 | 1 | 0 | No | No |
| 19032177 | METHOD OF OPTIMIZING DEPENDENT TASK OFFLOADING IN INTERNET OF VEHICLES USING DEEP REINFORCEMENT LEARNING | January 2025 | July 2025 | Allow | 6 | 1 | 0 | No | No |
| 19007241 | SYSTEMS AND METHODS FOR DETERMINING TARGET ALLOCATION PARAMETERS FOR INITIATING TARGETED COMMUNICATIONS IN COMPLEX COMPUTING NETWORKS | December 2024 | March 2025 | Allow | 2 | 0 | 0 | No | No |
| 19000641 | SYSTEMS AND METHODS FOR EXECUTING AN ANALYTICAL OPERATION ACROSS A PLURALITY OF COMPUTER PROCESSES | December 2024 | April 2025 | Allow | 3 | 0 | 0 | No | No |
| 18951845 | SYSTEM AND METHOD FOR OBSERVING AND PREDICTING DATA BATCH ACTIVITY IN REAL TIME | November 2024 | May 2025 | Allow | 6 | 1 | 0 | Yes | No |
| 18950323 | SYSTEM FOR ARTIFICIAL INTELLIGENCE AGENT AND METHOD OF OPERATION OF THE SYSTEM | November 2024 | April 2025 | Allow | 5 | 1 | 1 | No | No |
| 18934437 | METHOD FOR EXECUTING DATA PROCESSING TASK IN CLUSTER MIXED DEPLOYMENT SCENARIO, ELECTRONIC DEVICE AND STORAGE MEDIUM | November 2024 | June 2025 | Allow | 8 | 1 | 0 | No | No |
| 18910914 | METHODS AND SYSTEMS FOR PRIORITIZATION OF GROUP COMPUTING TASKS | October 2024 | August 2025 | Allow | 10 | 2 | 0 | Yes | No |
| 18901324 | THREE-CLASS VERTEX DEGREE AWARE-BASED 1.5-DIMENSIONAL GRAPH DIVISION METHOD AND APPLICATION | September 2024 | July 2025 | Allow | 10 | 1 | 0 | No | No |
| 18893600 | SYSTEM AND METHOD FOR TASK SCHEDULING IN VEHICULAR FOG COMPUTING NETWORKS | September 2024 | April 2025 | Allow | 6 | 1 | 0 | No | No |
| 18830410 | SYSTEMS AND METHODS FOR DETERMINING TARGET ALLOCATION PARAMETERS FOR INITIATING TARGETED COMMUNICATIONS IN COMPLEX COMPUTING NETWORKS | September 2024 | November 2024 | Allow | 2 | 0 | 0 | No | No |
| 18804529 | SYSTEM AND METHOD FOR MULTI-VENDOR ARTIFICIAL INTELLIGENCE WORKLOAD OPTIMIZATION AND RESOURCE ALLOCATION IN CLOUD ENVIRONMENTS | August 2024 | March 2025 | Allow | 7 | 0 | 0 | No | No |
| 18725590 | COMPUTING TASK SCHEDULING METHOD AND APPARATUS, ELECTRONIC DEVICE, AND READABLE STORAGE MEDIUM | June 2024 | August 2025 | Allow | 14 | 2 | 0 | Yes | No |
| 18724179 | PROCESS EXECUTION SYSTEM INCLUDING PROCESS NETWORK GENERATION UNIT, PROCESS NETWORK STATE MANAGEMENT UNIT, AND PROCESS NETWORK EXECUTION UNIT, DATA STRUCTURE, AND PROCESS EXECUTION PROGRAM | June 2024 | July 2025 | Allow | 13 | 2 | 0 | Yes | No |
| 18752706 | BINARY DISTANCE TRANSFORM | June 2024 | August 2024 | Allow | 2 | 2 | 0 | No | No |
| 18734834 | PROTOCOL FOR VALIDATING BLOCKCHAIN TRANSACTIONS | June 2024 | May 2025 | Allow | 11 | 1 | 0 | No | No |
| 18731501 | BACKUP OF CONTAINERIZED APPLICATIONS USING A BACKUP SERVICES CONTAINER AND A BACKUP SERVICES CONTAINER-ORCHESTRATION POD | June 2024 | April 2025 | Allow | 11 | 1 | 0 | No | No |
| 18674752 | PROCESSING DEVICE AND METHOD FOR MANAGING TASKS THEREOF | May 2024 | February 2025 | Allow | 9 | 1 | 0 | No | No |
| 18671802 | TASK MANAGER, PROCESSING DEVICE, AND METHOD FOR CHECKING TASK DEPENDENCIES THEREOF | May 2024 | February 2025 | Allow | 9 | 1 | 0 | No | No |
| 18670459 | ASYNCHRONOUS TASK QUEUE CONFIGURATION IN A DATABASE SYSTEM | May 2024 | September 2025 | Allow | 16 | 1 | 0 | No | No |
| 18657187 | AUTOMATICALLY IDENTIFYING AND RIGHT SIZING INSTANCES | May 2024 | March 2025 | Allow | 10 | 1 | 0 | No | No |
| 18647789 | MANUFACTURING SCHEDULE MANAGEMENT DEVICE AND METHOD FOR RESCHEDULING MANUFACTURING PROCESS | April 2024 | April 2025 | Allow | 11 | 1 | 0 | Yes | No |
| 18637364 | HYBRID RESOURCE SCHEDULING METHOD AND SYSTEM FOR ONLNE AND OFFLINE TRANSACTIONS | April 2024 | November 2024 | Allow | 7 | 1 | 0 | No | No |
| 18633570 | Hybrid Cloud-Edge Computing Architecture for Decentralized Computing Platform | April 2024 | September 2025 | Allow | 17 | 2 | 0 | No | No |
| 18626781 | ROBOTIC PROCESS AUTOMATION SYSTEM AND METHOD | April 2024 | November 2024 | Allow | 7 | 1 | 0 | No | No |
| 18625580 | Method and Apparatus for Creating Virtual Machines based on an Authentication Request from a User | April 2024 | September 2024 | Allow | 6 | 2 | 0 | Yes | No |
| 18626208 | CLOUD-BASED FLEET AND ASSET MANAGEMENT FOR EDGE COMPUTING OF MACHINE LEARNING AND ARTIFICIAL INTELLIGENCE WORKLOADS | April 2024 | February 2025 | Allow | 11 | 1 | 0 | Yes | No |
| 18619642 | METHOD FOR ENTERING SYSTEM MANAGEMENT MODE, PROCESSOR, AND COMPUTER SYSTEM | March 2024 | August 2025 | Allow | 16 | 3 | 0 | No | No |
| 18618901 | MAINTAINING WORKLOAD DATA COHERENCY BETWEEN LOCAL AND REMOTE ACCELERATORS | March 2024 | September 2025 | Allow | 18 | 2 | 0 | No | No |
| 18613571 | SYSTEM AND METHOD FOR QUEUING NODE LOAD IN DATA PREPROCESSING | March 2024 | March 2025 | Allow | 12 | 1 | 0 | No | No |
| 18610793 | WORKLOAD OPTIMIZATION THROUGH CONTEXTUAL BANDITS | March 2024 | October 2025 | Allow | 19 | 2 | 0 | Yes | No |
| 18607953 | DATA PROCESSING ACROSS APPLICATIONS IN CLOUD ENVIRONMENTS | March 2024 | January 2026 | Allow | 22 | 2 | 0 | Yes | No |
| 18603616 | PROGRAM FLOW MONITORING AND CONTROL OF AN EVENT-TRIGGERED SYSTEM | March 2024 | March 2026 | Allow | 24 | 2 | 0 | No | No |
| 18600164 | SYSTEM AND METHOD FOR OPTIMIZED COMPUTATION AND DATA MANAGEMENT | March 2024 | November 2024 | Allow | 8 | 1 | 0 | Yes | No |
| 18595649 | BARRIERS AND SYNCHRONIZATION FOR MACHINE LEARNING AT AUTONOMOUS MACHINES | March 2024 | March 2026 | Abandon | 24 | 2 | 0 | Yes | No |
| 18587648 | SYSTEMS AND METHODS FOR DETERMINING TARGET ALLOCATION PARAMETERS FOR INITIATING TARGETED COMMUNICATIONS IN COMPLEX COMPUTING NETWORKS | February 2024 | May 2024 | Allow | 2 | 0 | 0 | No | No |
| 18581777 | HARDWARE-BASED PREDICTIVE FAULT DETECTION AND ANALYSIS | February 2024 | June 2025 | Allow | 16 | 2 | 0 | Yes | No |
| 18442995 | Job Modification To Present A User Interface Based On A User Interface Update Rate | February 2024 | December 2024 | Allow | 10 | 1 | 0 | Yes | No |
| 18420602 | HARDWARE ACCELERATORS USING SHARED INTERFACE REGISTERS | January 2024 | May 2025 | Allow | 16 | 1 | 0 | Yes | No |
| 18416638 | DEPLOYING CLOUD-NATIVE SERVICES ACROSS CONTROL PLANES | January 2024 | March 2025 | Allow | 14 | 1 | 0 | Yes | No |
| 18411618 | PORTABLE APPLICATION BASED VIRTUALIZATION | January 2024 | April 2025 | Allow | 15 | 1 | 0 | No | No |
| 18410938 | METHODS AND SYSTEMS FOR INSTANTIATING AND TRANSPARENTLY MIGRATING EXECUTING CONTAINERIZED PROCESSES | January 2024 | August 2025 | Allow | 19 | 2 | 0 | No | No |
| 18406492 | Method of Making Dental Restorations from Sintered Preforms | January 2024 | September 2024 | Allow | 9 | 0 | 0 | No | No |
| 18405115 | PLACEMENT AND SCHEDULING OF RADIO SIGNAL PROCESSING DATAFLOW OPERATIONS | January 2024 | September 2024 | Allow | 9 | 0 | 0 | No | No |
| 18403517 | DYNAMIC DEVICE VIRTUALIZATION FOR USE BY GUEST USER PROCESSES BASED ON OBSERVED BEHAVIORS OF NATIVE DEVICE DRIVERS | January 2024 | October 2025 | Allow | 22 | 1 | 0 | Yes | No |
| 18400734 | METHOD AND SYSTEM FOR SEQUENCING ARTIFICIAL INTELLIGENCE (AI) JOBS FOR EXECUTION AT AI ACCELERATORS | December 2023 | January 2026 | Allow | 25 | 3 | 0 | No | No |
| 18389680 | PARALLEL OVERLAPPING BURST LOAD OPERATIONS | December 2023 | September 2025 | Allow | 21 | 4 | 0 | Yes | No |
| 18542245 | METHOD AND APPARATUS FOR SEGMENTING GPU RESOURCES INTO VIRTUAL PROCESSING RESOURCE TYPES AND ALLOCATING TO DIFFERENT TARGET TASKS | December 2023 | January 2025 | Allow | 13 | 2 | 0 | Yes | No |
| 18531989 | DETERMINING A JOB GROUP STATUS BASED ON A RELATIONSHIP BETWEEN A GENERATION COUNTER VALUE AND A TICKET VALUE FOR SCHEDULING THE JOB GROUP FOR EXECUTION | December 2023 | November 2024 | Allow | 12 | 1 | 0 | No | No |
| 18530273 | INTER-THREAD COMMUNICATION WITHIN THE COMPUTE FABRIC OF A MULTI-THREADED RECONFIGURABLE COARSE-GRAIN ARRAY WITHOUT ACCESSING SYSTEM MEMORY | December 2023 | August 2025 | Allow | 20 | 2 | 0 | No | No |
| 18531445 | BURST DATACENTER CAPACITY FOR HYPERSCALE WORKLOADS | December 2023 | February 2025 | Allow | 15 | 1 | 0 | Yes | No |
| 18524345 | INTENT-BASED ORCHESTRATION OF INDEPENDENT AUTOMATIONS | November 2023 | February 2025 | Allow | 15 | 1 | 0 | No | No |
| 18521121 | QUANTUM COMPUTING TASK PROCESSING METHOD, SYSTEM AND APPARATUS, AND OPERATING SYSTEM | November 2023 | May 2024 | Allow | 5 | 1 | 0 | No | No |
| 18511623 | TECHNIQUES FOR DETECTING AI PIPELINES IN CLOUD COMPUTING ENVIRONMENTS | November 2023 | August 2024 | Allow | 9 | 1 | 0 | Yes | No |
| 18505464 | SCOREBOARD FOR TRACKING COMPLETION OF TASKS | November 2023 | June 2024 | Allow | 8 | 0 | 0 | No | No |
| 18503555 | DATA PROCESSING USING APPLICATION SEQUENCE IDENTIFIERS IN CLOUD ENVIRONMENTS | November 2023 | January 2024 | Allow | 3 | 0 | 0 | No | No |
| 18501401 | METHOD AND SYSTEM FOR COLLECTING USER INFORMATION ACCORDING TO PROVIDED VIRTUAL DESKTOP INFRASTRUCTURE SERVICE | November 2023 | March 2025 | Allow | 17 | 1 | 0 | No | No |
| 18495971 | GATEWAY DEVICE, IN-VEHICLE NETWORK SYSTEM, AND FIRMWARE UPDATE METHOD | October 2023 | August 2024 | Allow | 10 | 1 | 0 | No | No |
| 18495682 | NEURAL PROCESSING DEVICE AND METHOD FOR JOB SCHEDULING THEREOF | October 2023 | June 2024 | Allow | 8 | 0 | 0 | No | No |
| 18493993 | Shared Control Bus for Graphics Processors with Intra-Substrate and Cross-Substrate Interfaces | October 2023 | October 2025 | Allow | 23 | 2 | 0 | Yes | No |
| 18493703 | TASK MANAGER, PROCESSING DEVICE, AND METHOD FOR CHECKING TASK DEPENDENCIES THEREOF | October 2023 | April 2024 | Allow | 6 | 1 | 0 | No | No |
| 18382914 | SYSTEMS AND METHODS FOR MAINTAINING DATA OBJECTS TO MANAGE ASYNCHRONOUS WORKFLOWS | October 2023 | September 2024 | Allow | 11 | 1 | 0 | No | No |
| 18382893 | CORE TARGETING IN HETEROGENEOUS MULTIPROCESSOR SYSTEMS | October 2023 | July 2025 | Allow | 21 | 1 | 0 | No | No |
| 18491695 | PROCESSING DEVICE AND METHOD FOR MANAGING TASKS THEREOF | October 2023 | April 2024 | Allow | 6 | 1 | 0 | No | No |
| 18381728 | BRANCH PREDICTION FOR USER INTERFACES IN WORKFLOWS | October 2023 | September 2024 | Allow | 11 | 1 | 0 | No | No |
| 18489559 | METHOD AND APPARATUS FOR PREVENTING TASK-SIGNAL DEADLOCK DUE TO CONTENTION FOR MUTEX IN RTOS | October 2023 | February 2025 | Allow | 16 | 1 | 0 | Yes | No |
| 18488794 | FINE-GRAINED CONDITIONAL DISPATCHING | October 2023 | February 2026 | Allow | 28 | 0 | 0 | No | No |
| 18486527 | METHODS AND SYSTEMS FOR AUTOMATING DEPLOYMENT OF APPLICATIONS IN A MULTI-TENANT DATABASE ENVIRONMENT | October 2023 | October 2024 | Allow | 12 | 1 | 0 | Yes | No |
| 18378281 | SELF-SCHEDULING THREADS IN A PROCESSOR BASED ON A THRESHOLD ASSOCIATED WITH PIPELINE STAGES | October 2023 | April 2025 | Allow | 18 | 2 | 0 | Yes | No |
| 18483449 | GENERATING STANDBY CLOUD VERSIONS OF A VIRTUAL MACHINE | October 2023 | December 2024 | Allow | 14 | 1 | 0 | No | No |
| 18480185 | METHODS AND SYSTEMS FOR IMPROVING HARDWARE RESILIENCY DURING SERIAL PROCESSING TASKS IN DISTRIBUTED COMPUTER NETWORKS | October 2023 | June 2025 | Allow | 21 | 2 | 0 | Yes | No |
| 18478820 | Systems and Methods for Safely Subscribing to Locks Using Hardware Extensions | September 2023 | February 2025 | Allow | 17 | 1 | 0 | No | No |
| 18373743 | TECHNIQUES FOR MANAGING DRIFT IN A DEPLOYMENT ORCHESTRATOR | September 2023 | November 2024 | Allow | 14 | 1 | 0 | Yes | No |
| 18474725 | METHOD AND APPARATUS FOR TRANSLATING MEMORY ADDRESSES IN MANYCORE SYSTEM | September 2023 | November 2023 | Allow | 2 | 0 | 0 | No | No |
| 18470563 | ORGANIZING TASKS BY A HIERARCHICAL TASK SCHEDULER FOR EXECUTION IN A MULTI-THREADED PROCESSING SYSTEM | September 2023 | June 2025 | Allow | 21 | 2 | 0 | No | No |
| 18370015 | SYSTEM AND METHOD FOR DYNAMICALLY ALLOCATING COMPUTER RESOURCES TO A DATA PROCESSING PIPELINE | September 2023 | September 2024 | Allow | 12 | 2 | 0 | Yes | No |
| 18469480 | COORDINATED GARBAGE COLLECTION IN DISTRIBUTED SYSTEMS | September 2023 | June 2024 | Allow | 9 | 0 | 0 | No | No |
| 18466384 | DISTRIBUTED MODEL COMPILATION | September 2023 | January 2024 | Allow | 4 | 1 | 0 | No | No |
| 18461474 | FLEET AND ASSET MANAGEMENT FOR EDGE COMPUTING OF MACHINE LEARNING AND ARTIFICIAL INTELLIGENCE WORKLOADS DEPLOYED FROM CLOUD TO EDGE | September 2023 | July 2024 | Abandon | 10 | 2 | 0 | No | No |
| 18461470 | CLOUD-BASED FLEET AND ASSET MANAGEMENT FOR EDGE COMPUTING OF MACHINE LEARNING AND ARTIFICIAL INTELLIGENCE WORKLOADS | September 2023 | February 2024 | Allow | 6 | 1 | 0 | No | No |
| 18241101 | APPARATUSES, METHODS, AND COMPUTER PROGRAM PRODUCTS FOR OPTIMIZED SUPPORT MANAGEMENT SLOT ALLOCATIONS | August 2023 | February 2026 | Allow | 29 | 0 | 0 | No | No |
| 18239489 | VIRTUALIZATION AND MULTI-TENANCY SUPPORT IN GRAPHICS PROCESSORS | August 2023 | October 2024 | Allow | 13 | 1 | 0 | No | No |
| 18456921 | DISTRIBUTED COMMINICATION | August 2023 | February 2025 | Abandon | 17 | 2 | 0 | No | No |
| 18231631 | ENFORCE CHANGES IN SESSION BEHAVIOR BASED ON UPDATED MACHINE LEARNING MODEL WITH DETECTED RISK BEHAVIOR DURING SESSION | August 2023 | February 2026 | Abandon | 30 | 4 | 0 | Yes | No |
| 18229644 | MIGRATING VIRTUAL MACHINES WHILE PERFORMING MIDDLEBOX SERVICE OPERATIONS AT A PNIC | August 2023 | November 2025 | Allow | 28 | 0 | 0 | No | No |
| 18363656 | CROSS-CLUSTER LOAD BALANCER | August 2023 | May 2025 | Allow | 21 | 0 | 0 | Yes | No |
| 18228173 | SCALING VIRTUALIZATION RESOURCE UNITS OF APPLICATIONS | July 2023 | July 2024 | Allow | 12 | 1 | 0 | No | No |
| 18361549 | ASYNCHRONOUS TASK QUEUE CONFIGURATION IN A DATABASE SYSTEM | July 2023 | February 2024 | Allow | 7 | 1 | 0 | No | No |
| 18359746 | HYBRID INVENTORY DATA SUMMARIZATION ACROSS HYBRID CLOUD INFRASTRUCTURE | July 2023 | February 2026 | Allow | 31 | 1 | 0 | Yes | No |
| 18356001 | FIXING A CHANGING WEAVE USING A FINALIZE NODE | July 2023 | December 2023 | Allow | 5 | 0 | 0 | Yes | No |
| 18223495 | SCHEDULING OPERATIONS ON A COMPUTATION GRAPH | July 2023 | June 2024 | Allow | 11 | 1 | 0 | Yes | No |
| 18353020 | INTER-THREAD INTERRUPT SIGNAL SENDING BASED ON INTERRUPT CONFIGURATION INFORMATION OF A PCI DEVICE AND THREAD STATUS INFORMATION | July 2023 | November 2023 | Allow | 5 | 1 | 0 | Yes | No |
| 18352293 | INSTANTIATING SOFTWARE DEFINED STORAGE NODES ON EDGE INFORMATION HANDLING SYSTEMS | July 2023 | February 2026 | Allow | 31 | 0 | 0 | No | No |
This analysis examines appeal outcomes and the strategic value of filing appeals for art-unit 2195.
With a 20.9% reversal rate, the PTAB affirms the examiner's rejections in the vast majority of cases. This reversal rate is in the bottom 25% across the USPTO, indicating that appeals face significant challenges here.
Filing a Notice of Appeal can sometimes lead to allowance even before the appeal is fully briefed or decided by the PTAB. This occurs when the examiner or their supervisor reconsiders the rejection during the mandatory appeal conference (MPEP § 1207.01) after the appeal is filed.
In this dataset, 47.6% of applications that filed an appeal were subsequently allowed. This appeal filing benefit rate is in the top 25% across the USPTO, indicating that filing appeals is particularly effective here. The act of filing often prompts favorable reconsideration during the mandatory appeal conference.
⚠ Appeals to PTAB face challenges. Ensure your case has strong merit before committing to full Board review.
✓ Filing a Notice of Appeal is strategically valuable. The act of filing often prompts favorable reconsideration during the mandatory appeal conference.
Art Unit 2195 is part of Group 2190 in Technology Center 2100. This art unit has examined 7,777 patent applications in our dataset, with an overall allowance rate of 80.2%. Applications typically reach final disposition in approximately 40 months.
Art Unit 2195's allowance rate of 80.2% places it in the 64% percentile among all USPTO art units. This art unit has an above-average allowance rate compared to other art units.
Applications in Art Unit 2195 receive an average of 2.21 office actions before reaching final disposition (in the 74% percentile). The median prosecution time is 40 months (in the 14% percentile).
When prosecuting applications in this art unit, consider the following:
Not Legal Advice: The information provided in this report is for informational purposes only and does not constitute legal advice. You should consult with a qualified patent attorney or agent for advice specific to your situation.
No Guarantees: We do not provide any guarantees as to the accuracy, completeness, or timeliness of the statistics presented above. Patent prosecution statistics are derived from publicly available USPTO data and are subject to data quality limitations, processing errors, and changes in USPTO practices over time.
Limitation of Liability: Under no circumstances will IronCrow AI be liable for any outcome, decision, or action resulting from your reliance on the statistics, analysis, or recommendations presented in this report. Past prosecution patterns do not guarantee future results.
Use at Your Own Risk: While we strive to provide accurate and useful prosecution statistics, you should independently verify any information that is material to your prosecution strategy and use your professional judgment in all patent prosecution matters.