Detailed information about the 100 most recent patent applications.
| Application Number | Title | Filing Date | Disposal Date | Disposition | Time (months) | Office Actions | Restrictions | Interview | Appeal |
|---|---|---|---|---|---|---|---|---|---|
| 18767691 | UE SIGNAL TO INTERFERENCE POWER RATIO DETECTION FOR NETWORK SCHEDULING ASSISTANCE | July 2024 | June 2025 | Allow | 12 | 1 | 0 | Yes | No |
| 18673533 | METHOD AND DEVICE FOR PERFORMING HANDOVER IN WIRELESS COMMUNICATION SYSTEM | May 2024 | June 2025 | Allow | 13 | 1 | 0 | No | No |
| 18594708 | RESOURCE CONFIGURATION FOR EPDCCH | March 2024 | May 2025 | Allow | 15 | 1 | 0 | No | No |
| 18444579 | WIRELESS COMMUNICATION METHOD AND WIRELESS COMMUNICATION TERMINAL USING SAME | February 2024 | April 2025 | Allow | 14 | 1 | 0 | No | No |
| 18415771 | EFFICIENT ALGORITHM TO ELIMINATE REDUNDANT SPECIFIC PREFIXES IN FORWARDING INFORMATION BASE USING TRIE | January 2024 | January 2025 | Allow | 12 | 1 | 0 | Yes | No |
| 18402889 | DOWNLINK DATA TRANSMISSION IN RRC INACTIVE MODE | January 2024 | March 2025 | Allow | 14 | 1 | 0 | No | No |
| 18519921 | METHOD AND APPARATUS FOR TRANSMITTING AND RECEIVING SYSTEM INFORMATION | November 2023 | March 2025 | Allow | 16 | 2 | 0 | Yes | No |
| 18387890 | Packet Format of Network Abstraction Layer Unit, and Algorithm and Apparatus for Video Encoding and Decoding Using the Format, QOS Control Algorithm and Apparatus for IPV6 Label Switching Using the Format | November 2023 | January 2025 | Allow | 15 | 1 | 0 | No | No |
| 18387903 | Packet Format of Network Abstraction Layer Unit, and Algorithm and Apparatus for Video Encoding and Decoding Using the Format, QOS Control Algorithm and Apparatus for IPV6 Label Switching Using the Format | November 2023 | October 2024 | Allow | 11 | 1 | 0 | No | No |
| 18455254 | DATA ROUTER CONNECTIVITY TO WIRELESS COMMUNICATION SLICES | August 2023 | December 2024 | Allow | 15 | 2 | 0 | Yes | No |
| 18234405 | APPARATUS AND METHOD | August 2023 | March 2025 | Allow | 19 | 2 | 0 | No | No |
| 18229513 | Test Signals and Feedback for Beam Optimization in 5G and 6G | August 2023 | October 2024 | Allow | 14 | 2 | 0 | No | No |
| 18352608 | USER EQUIPMENT COMMUNICATIONS WHILE OPERATING IN A SECONDARY CELL GROUP DEACTIVATED STATE | July 2023 | January 2025 | Allow | 18 | 2 | 0 | Yes | No |
| 18211606 | SPECTRUM USAGE PROTECTION IN A SHARED WIRELESS NETWORK | June 2023 | October 2024 | Allow | 16 | 1 | 0 | No | No |
| 18328307 | METHOD AND DEVICE FOR CONTROLLING TRANSMISSION POWER OF TERMINAL IN WIRELESS COMMUNICATION SYSTEM | June 2023 | May 2024 | Allow | 11 | 1 | 0 | No | No |
| 18141489 | UE IDENTIFIER IN RRC RESUME | May 2023 | October 2024 | Allow | 17 | 2 | 0 | No | No |
| 18191019 | Lean Deterministic Beam/Power Feedback During 5G/6G Initial Access | March 2023 | July 2023 | Allow | 4 | 1 | 0 | No | No |
| 18102425 | TRANSMITTING DATA USING A RELAY USER EQUIPMENT | January 2023 | March 2025 | Allow | 26 | 4 | 0 | Yes | No |
| 18160075 | EFFICIENT ALGORITHM TO ELIMINATE REDUNDANT SPECIFIC PREFIXES IN FORWARDING INFORMATION BASE USING TRIE | January 2023 | October 2023 | Allow | 9 | 1 | 0 | No | No |
| 18100649 | DEVICE COMMUNICATION USING A REDUCED CHANNEL BANDWIDTH | January 2023 | June 2024 | Allow | 17 | 2 | 0 | Yes | No |
| 18099264 | MULTI-CARRIER SIGNAL TRANSMISSION METHOD, DEVICE, AND SYSTEM | January 2023 | September 2023 | Allow | 8 | 1 | 0 | No | No |
| 18078614 | MULTI-BEAM RANDOM ACCESS PROCEDURE IN HANDOVER EXECUTION | December 2022 | July 2023 | Allow | 8 | 1 | 0 | No | No |
| 17979771 | WIRELESS COMMUNICATION METHOD AND WIRELESS COMMUNICATION TERMINAL USING SAME | November 2022 | October 2023 | Allow | 12 | 1 | 0 | No | No |
| 17978408 | METHOD AND APPARATUS FOR PROVIDING NETWORK SLICES IN WIRELESS COMMUNICATIONS SYSTEMS | November 2022 | May 2025 | Allow | 31 | 1 | 0 | No | No |
| 17935458 | RESOURCE CONFIGURATION FOR EPDCCH | September 2022 | October 2023 | Allow | 13 | 1 | 0 | No | No |
| 17942989 | SYSTEMS AND METHODS FOR COOPERATIVE COMMUNICATION USING INTERFERING SIGNALS | September 2022 | August 2023 | Allow | 12 | 1 | 0 | Yes | No |
| 17931263 | SYSTEM AND METHOD FOR ENCODING OF LOCAL BANDWIDTH CONDITIONS INTO TUNNELING MESSAGE | September 2022 | September 2023 | Allow | 12 | 1 | 0 | No | No |
| 17941609 | ADMISSION CONTROL OF A COMMUNICATION SESSION | September 2022 | December 2023 | Allow | 16 | 1 | 0 | No | No |
| 17902663 | UE SIGNAL TO INTERFERENCE POWER RATIO DETECTION FOR NETWORK SCHEDULING ASSISTANCE | September 2022 | August 2023 | Allow | 11 | 1 | 0 | Yes | No |
| 17880684 | METHOD RELATED TO PHYSICAL UPLINK CONTROL CHANNEL CELL SWITCHING AND USER EQUIPMENT | August 2022 | May 2025 | Allow | 33 | 1 | 0 | No | No |
| 17870335 | SYSTEMS AND METHODS FOR ZERO-TOUCH INTERWORKING OF NETWORK ORCHESTRATION WITH DATA PLATFORM AND ANALYTICS IN VIRTUALIZED 5G DEPLOYMENT | July 2022 | October 2023 | Allow | 14 | 2 | 0 | Yes | No |
| 17858478 | METHOD AND APPARATUS FOR RELEASING PUSCH RESOURCES ASSIGNED FOR RANDOM ACCESS IN WIRELESS COMMUNICATION SYSTEM | July 2022 | May 2023 | Allow | 10 | 1 | 0 | No | No |
| 17846885 | DATA TRANSMISSION METHOD AND COMMUNICATIONS APPARATUS | June 2022 | April 2023 | Allow | 10 | 1 | 0 | No | No |
| 17779641 | SWITCHING TO MINI-SLOTS FOR TRANSMISSION OF URGENT DATA | May 2022 | March 2025 | Allow | 34 | 1 | 0 | No | No |
| 17778952 | METHOD OF AND A NETWORK CONTROL FUNCTION FOR ADAPTIVELY ALLOCATING RADIO RESOURCES, AN ADVANCED ANTENNA SYSTEM, AND RADIO CELL SITE EQUIPMENT | May 2022 | April 2024 | Allow | 22 | 1 | 0 | No | No |
| 17744066 | STEERING TO OPTIMIZE PERFORMANCE IN MESH NETWORKS | May 2022 | March 2025 | Allow | 35 | 2 | 0 | No | No |
| 17662978 | SECURITY HANDLING OF 5GS TO EPC RESELECTION | May 2022 | July 2024 | Allow | 26 | 2 | 0 | Yes | No |
| 17741127 | 5G NEW RADIO (NR) TIME DIVISION DUPLEXING FRAME STRUCTURE MANAGEMENT FOR HEAVY UPLINK TRAFFIC SITE | May 2022 | December 2023 | Allow | 20 | 1 | 0 | Yes | No |
| 17734998 | COMMUNICATION METHOD AND DEVICE | May 2022 | June 2025 | Allow | 37 | 1 | 0 | No | No |
| 17766530 | ELECTRONIC DEVICE AND METHOD FOR WIRELESS COMMUNICATION, AND COMPUTER READABLE STORAGE MEDIUM | April 2022 | May 2025 | Allow | 38 | 1 | 0 | No | No |
| 17657699 | WEIGHTED ERROR OPTIMIZATION FOR DIGITAL PRE-DISTORTION | April 2022 | March 2025 | Allow | 36 | 1 | 0 | Yes | No |
| 17764033 | METHOD FOR RECEIVING DOWNLINK SIGNAL ON BASIS OF RANDOM-ACCESS CHANNEL PROCEDURE IN UNLICENSED BAND, AND DEVICE THEREFOR | March 2022 | October 2024 | Allow | 31 | 1 | 0 | No | No |
| 17763482 | METHOD AND SYSTEM FOR SEAMLESS SERVICE CONTINUITY FOR EDGE COMPUTING | March 2022 | February 2025 | Allow | 35 | 2 | 0 | No | No |
| 17703800 | RATE ADJUSTMENT ANTICIPATING CHANGE IN CHANNEL CAPACITY | March 2022 | September 2023 | Allow | 17 | 1 | 0 | Yes | No |
| 17763241 | CONFIGURATIONS FOR OMITTING CHANNEL STATE INFORMATION | March 2022 | September 2024 | Allow | 30 | 1 | 0 | No | No |
| 17763322 | SEMI-DYNAMIC CONFIGURATION FOR MOBILE SYSTEM | March 2022 | October 2024 | Allow | 31 | 1 | 0 | No | No |
| 17652841 | RADIO LINK MONITORING WITH SUB-BANDS AND INTERFERENCE MEASUREMENTS | February 2022 | April 2024 | Allow | 25 | 1 | 0 | No | No |
| 17678776 | METHOD FOR SENDING AND RECEIVING CONTROL INFORMATION, APPARATUS, AND SYSTEM | February 2022 | April 2025 | Allow | 37 | 1 | 0 | No | No |
| 17678598 | DOWNLINK CONTROL INFORMATION ACTIVATION FOR SEMI-PERSISTENT SOUNDING REFERENCE SIGNAL RESOURCE SETS | February 2022 | April 2025 | Allow | 38 | 1 | 0 | No | No |
| 17668583 | APPARATUSES AND METHODS FOR EXPEDITED TUNNEL ESTABLISHMENT WITH A NON-THIRD GENERATION PARTNERSHIP PROJECT (3GPP) INTERWORKING GATEWAY TO ACCESS A 3GPP NETWORK | February 2022 | August 2024 | Allow | 30 | 2 | 0 | No | No |
| 17632009 | METHOD AND APPARATUS FOR TRANSMITTING INFORMATION ON AN UPLINK CHANNEL | February 2022 | March 2025 | Allow | 38 | 1 | 0 | No | No |
| 17589489 | Gateway for Transporting Out-Of-Band Messaging Signals | January 2022 | April 2023 | Allow | 14 | 1 | 0 | No | No |
| 17582745 | REPORTING MEASUREMENTS FOR MINIMIZATION OF DRIVING TEST IN WIRELESS COMMUNICATION | January 2022 | July 2024 | Allow | 29 | 1 | 0 | No | No |
| 17628336 | DATA COLLECTION SYSTEM, DATA OUTPUT APPARATUS, AND DATA COLLECTION METHOD | January 2022 | October 2024 | Allow | 33 | 1 | 0 | No | No |
| 17627451 | INTERFERENCE CANCELLATION REPEATER AND METHOD OF OPERATION THEREOF | January 2022 | November 2024 | Allow | 34 | 2 | 0 | No | No |
| 17576892 | EFFICIENT RADIO ACCESS TECHNOLOGY OFFLOADING WITHOUT DEDICATED MEASUREMENT REPORT | January 2022 | October 2023 | Allow | 21 | 1 | 0 | Yes | No |
| 17574289 | VERIFYING RESOURCES ASSOCIATED WITH REPETITION-BASED LINKED DOWNLINK CONTROL CHANNEL CANDIDATES | January 2022 | December 2024 | Allow | 36 | 2 | 0 | No | No |
| 17625961 | MINIMIZING SIGNALING LOAD DURING HANDOVER FOR NTN | January 2022 | May 2024 | Allow | 28 | 1 | 0 | No | No |
| 17559526 | WIRELESS COMMUNICATIONS SYSTEMS SUPPORTING CARRIER AGGREGATION AND SELECTIVE DISTRIBUTED ROUTING OF SECONDARY CELL COMPONENT CARRIERS BASED ON TRANSMISSION POWER DEMAND OR SIGNAL QUALITY | December 2021 | May 2023 | Allow | 17 | 1 | 0 | No | No |
| 17557745 | METHOD AND APPARATUS FOR TRANSMITTING AND RECEIVING SYSTEM INFORMATION | December 2021 | July 2023 | Allow | 19 | 1 | 0 | No | No |
| 17548675 | ENHANCEMENTS ON 5G SESSION MANAGEMENT (5GSM) HANDLING OF NETWORK REJECTION NOT DUE TO CONGESTION CONTROL | December 2021 | March 2024 | Allow | 27 | 2 | 0 | No | No |
| 17457127 | TECHNIQUES FOR HANDLING CALLS ASSOCIATED WITH USER EQUIPMENT TRANSITION FROM DUAL ACTIVE MODE TO DUAL STANDBY MODE | December 2021 | January 2024 | Allow | 26 | 1 | 0 | Yes | No |
| 17457177 | HANDLING OF CONDITIONAL HANDOVER AND CONDITIONAL PRIMARY SECONDARY CELL CHANGE | December 2021 | December 2024 | Allow | 37 | 3 | 0 | Yes | No |
| 17532873 | METHOD AND APPARATUS FOR HANDLING A BEAM FAILURE RECOVERY IN WIRELESS COMMUNICATION SYSTEM | November 2021 | June 2023 | Allow | 19 | 1 | 0 | No | No |
| 17529446 | APPARATUSES AND METHODS FOR FACILITATING A SELECTION OF RADIO RESOURCES | November 2021 | April 2024 | Allow | 29 | 1 | 0 | No | No |
| 17611876 | METHOD, SYSTEM AND DEVICE FOR ACQUIRING RANDOM ACCESS CONFIGURATION INFORMATION | November 2021 | November 2024 | Allow | 36 | 1 | 0 | No | No |
| 17519405 | Data Transmission Method and Apparatus | November 2021 | March 2023 | Allow | 17 | 1 | 0 | No | No |
| 17511140 | METHOD AND APPARATUS FOR TRANSMITTING AND RECEIVING SIGNAL FOR COOPERATIVE TRANSMISSION IN COMMUNICATION SYSTEM | October 2021 | October 2023 | Allow | 24 | 1 | 0 | No | No |
| 17504237 | UE SIGNAL TO INTERFERENCE POWER RATIO DETECTION FOR NETWORK SCHEDULING ASSISTANCE | October 2021 | March 2024 | Allow | 29 | 2 | 0 | Yes | No |
| 17496629 | LOCATING METHOD IN MULTI-CONNECTIVITY NETWORK, TERMINAL DEVICE AND LOCATION MANAGEMENT FUNCTION ENTITY | October 2021 | April 2023 | Abandon | 18 | 1 | 0 | No | No |
| 17493668 | METHOD AND APPARATUS FOR DETERMINING BEAM INFORMATION, AND COMMUNICATIONS DEVICE | October 2021 | July 2024 | Allow | 33 | 1 | 0 | No | No |
| 17599195 | TRANSFERRING MONITORING EVENT INFORMATION DURING A MOBILITY PROCEDURE | September 2021 | October 2023 | Allow | 24 | 1 | 0 | No | No |
| 17599205 | COT SHARING INDICATOR FOR MESSAGE 3 IN RANDOM ACCESS PROCEDURE | September 2021 | September 2024 | Allow | 35 | 1 | 0 | No | No |
| 17479865 | DATA ROUTER CONNECTIVITY TO WIRELESS COMMUNICATION SLICES | September 2021 | May 2023 | Allow | 20 | 1 | 0 | No | No |
| 17593489 | Channel State Information Feedback in Wireless Communications | September 2021 | October 2024 | Allow | 36 | 2 | 0 | No | No |
| 17440209 | LINK ADAPTATION OPTIMIZED WITH MACHINE LEARNING | September 2021 | November 2024 | Allow | 38 | 2 | 0 | No | No |
| 17447494 | METHOD AND APPARATUS FOR INITIAL ACCESS OF TERMINAL IN WIRELESS COMMUNICATION SYSTEM | September 2021 | March 2023 | Allow | 18 | 1 | 0 | No | No |
| 17438443 | Timing Alignment Handling for Configured Grant Based Small Data Transmissions in Inactive Mode | September 2021 | July 2024 | Allow | 34 | 2 | 0 | Yes | No |
| 17437770 | RESOURCE ALLOCATION FOR REPEATED UPLINK TRANSMISSIONS | September 2021 | October 2024 | Allow | 37 | 1 | 0 | No | No |
| 17437763 | METHOD AND DEVICE FOR TRANSMITTING PUCCH | September 2021 | July 2024 | Allow | 34 | 1 | 0 | No | No |
| 17437602 | Physical Downlink Control Channel Reception with Improved Reliability | September 2021 | April 2024 | Allow | 31 | 1 | 0 | No | No |
| 17436333 | CONTROL SYSTEM, RELAY DEVICE, CONTROL DEVICE, CONTROL METHOD, AND NON-TRANSITORY COMPUTER-READABLE MEDIUM | September 2021 | March 2024 | Allow | 30 | 1 | 0 | Yes | No |
| 17434752 | RIFT PROTOCOL-BASED NETWORK LOGICAL LAYERING METHOD AND DEVICE, NETWORK DEVICE AND STORAGE MEDIUM | August 2021 | August 2024 | Allow | 36 | 1 | 0 | No | No |
| 17434622 | MEASUREMENTS FOR ON-DEMAND POSITIONING REFERENCE SIGNAL TRANSMISSION | August 2021 | August 2024 | Allow | 36 | 2 | 0 | No | No |
| 17434718 | RA-RNTI FORMULA FOR EXTENDED RANDOM ACCESS RESPONSE WINDOWS | August 2021 | February 2025 | Allow | 42 | 3 | 0 | No | Yes |
| 17458934 | NB LTE PRACH DESIGN | August 2021 | April 2023 | Allow | 20 | 1 | 0 | No | No |
| 17432033 | AVOIDING TRANSMISSION OF UNNECESSARY 5GSM MESSAGE | August 2021 | May 2024 | Abandon | 33 | 2 | 0 | No | No |
| 17428817 | APPARATUS, METHOD AND COMPUTER PROGRAM | August 2021 | April 2024 | Allow | 32 | 1 | 0 | No | No |
| 17427268 | DATA TRANSMISSION METHOD AND TERMINAL DEVICE | July 2021 | June 2024 | Abandon | 35 | 2 | 0 | No | No |
| 17426387 | ON THE FRAME STRUCTURE DESIGN FOR SINGLE CARRIER WAVEFORM | July 2021 | April 2024 | Allow | 32 | 1 | 0 | No | No |
| 17443596 | DEVICE COORDINATION FOR DISTRIBUTED EDGE COMPUTATIONS | July 2021 | January 2023 | Allow | 18 | 1 | 0 | Yes | No |
| 17443413 | METHOD AND APPARATUS FOR COMMUNICATING DATA PACKETS IN A CLOUD CELL | July 2021 | January 2024 | Allow | 30 | 3 | 0 | Yes | No |
| 17380449 | BEAMFORMING | July 2021 | June 2023 | Allow | 23 | 2 | 0 | No | No |
| 17422636 | METHOD OF TRANSMISSION OF A DATA PACKET, COMPUTER PROGRAM, AND TRANSCEIVER DEVICE | July 2021 | May 2024 | Allow | 34 | 1 | 0 | No | No |
| 17358585 | METHOD AND APPARATUS FOR TRIGGERING RESELECTION FOR RELAY | June 2021 | February 2024 | Allow | 32 | 4 | 0 | No | No |
| 17352929 | METHOD AND DEVICE FOR CONTROLLING TRANSMISSION POWER OF TERMINAL IN WIRELESS COMMUNICATION SYSTEM | June 2021 | February 2023 | Allow | 20 | 1 | 0 | No | No |
| 17352360 | TELECOMMUNICATIONS APPARATUSES AND METHODS | June 2021 | May 2025 | Abandon | 47 | 4 | 0 | Yes | No |
| 17346943 | METHOD AND APPARATUS FOR TRANSMITTING AND RECEIVING WIRELESS SIGNAL IN WIRELESS COMMUNICATION SYSTEM | June 2021 | February 2023 | Allow | 20 | 1 | 0 | No | No |
| 17347014 | SCHEDULING REQUEST POLLING FOR SIDELINK COMMUNICATIONS | June 2021 | July 2024 | Allow | 37 | 3 | 0 | No | No |
| 17312573 | MANAGING RADIO BEARER TRAFFIC BETWEEN RADIO NETWORK NODES | June 2021 | November 2023 | Allow | 29 | 1 | 0 | No | No |
This analysis examines appeal outcomes and the strategic value of filing appeals for examiner EBRAHIM, ANEZ C.
With a 30.0% reversal rate, the PTAB affirms the examiner's rejections in the vast majority of cases. This reversal rate is below the USPTO average, indicating that appeals face more challenges here than typical.
Filing a Notice of Appeal can sometimes lead to allowance even before the appeal is fully briefed or decided by the PTAB. This occurs when the examiner or their supervisor reconsiders the rejection during the mandatory appeal conference (MPEP § 1207.01) after the appeal is filed.
In this dataset, 34.3% of applications that filed an appeal were subsequently allowed. This appeal filing benefit rate is above the USPTO average, suggesting that filing an appeal can be an effective strategy for prompting reconsideration.
⚠ Appeals to PTAB face challenges. Ensure your case has strong merit before committing to full Board review.
✓ Filing a Notice of Appeal is strategically valuable. The act of filing often prompts favorable reconsideration during the mandatory appeal conference.
Examiner EBRAHIM, ANEZ C works in Art Unit 2467 and has examined 726 patent applications in our dataset. With an allowance rate of 83.3%, this examiner has an above-average tendency to allow applications. Applications typically reach final disposition in approximately 31 months.
Examiner EBRAHIM, ANEZ C's allowance rate of 83.3% places them in the 51% percentile among all USPTO examiners. This examiner has an above-average tendency to allow applications.
On average, applications examined by EBRAHIM, ANEZ C receive 2.21 office actions before reaching final disposition. This places the examiner in the 75% percentile for office actions issued. This examiner issues more office actions than most examiners, which may indicate thorough examination or difficulty in reaching agreement with applicants.
The median time to disposition (half-life) for applications examined by EBRAHIM, ANEZ C is 31 months. This places the examiner in the 36% percentile for prosecution speed. Prosecution timelines are slightly slower than average with this examiner.
Conducting an examiner interview provides a +8.4% benefit to allowance rate for applications examined by EBRAHIM, ANEZ C. This interview benefit is in the 41% percentile among all examiners. Recommendation: Interviews provide a below-average benefit with this examiner.
When applicants file an RCE with this examiner, 30.8% of applications are subsequently allowed. This success rate is in the 53% percentile among all examiners. Strategic Insight: RCEs show above-average effectiveness with this examiner. Consider whether your amendments or new arguments are strong enough to warrant an RCE versus filing a continuation.
This examiner enters after-final amendments leading to allowance in 24.6% of cases where such amendments are filed. This entry rate is in the 25% percentile among all examiners. Strategic Recommendation: This examiner rarely enters after-final amendments compared to other examiners. You should generally plan to file an RCE or appeal rather than relying on after-final amendment entry. Per MPEP § 714.12, primary examiners have discretion in entering after-final amendments, and this examiner exercises that discretion conservatively.
When applicants request a pre-appeal conference (PAC) with this examiner, 97.3% result in withdrawal of the rejection or reopening of prosecution. This success rate is in the 67% percentile among all examiners. Strategic Recommendation: Pre-appeal conferences show above-average effectiveness with this examiner. If you have strong arguments, a PAC request may result in favorable reconsideration.
This examiner withdraws rejections or reopens prosecution in 83.9% of appeals filed. This is in the 75% percentile among all examiners. Of these withdrawals, 57.7% occur early in the appeal process (after Notice of Appeal but before Appeal Brief). Strategic Insight: This examiner shows above-average willingness to reconsider rejections during appeals. The mandatory appeal conference (MPEP § 1207.01) provides an opportunity for reconsideration.
When applicants file petitions regarding this examiner's actions, 57.1% are granted (fully or in part). This grant rate is in the 72% percentile among all examiners. Strategic Note: Petitions show above-average success regarding this examiner's actions. Petitionable matters include restriction requirements (MPEP § 1002.02(c)(2)) and various procedural issues.
Examiner's Amendments: This examiner makes examiner's amendments in 1.0% of allowed cases (in the 68% percentile). This examiner makes examiner's amendments more often than average to place applications in condition for allowance (MPEP § 1302.04).
Quayle Actions: This examiner issues Ex Parte Quayle actions in 0.0% of allowed cases (in the 18% percentile). This examiner rarely issues Quayle actions compared to other examiners. Allowances typically come directly without a separate action for formal matters.
Based on the statistical analysis of this examiner's prosecution patterns, here are tailored strategic recommendations:
Not Legal Advice: The information provided in this report is for informational purposes only and does not constitute legal advice. You should consult with a qualified patent attorney or agent for advice specific to your situation.
No Guarantees: We do not provide any guarantees as to the accuracy, completeness, or timeliness of the statistics presented above. Patent prosecution statistics are derived from publicly available USPTO data and are subject to data quality limitations, processing errors, and changes in USPTO practices over time.
Limitation of Liability: Under no circumstances will IronCrow AI be liable for any outcome, decision, or action resulting from your reliance on the statistics, analysis, or recommendations presented in this report. Past prosecution patterns do not guarantee future results.
Use at Your Own Risk: While we strive to provide accurate and useful prosecution statistics, you should independently verify any information that is material to your prosecution strategy and use your professional judgment in all patent prosecution matters.