Detailed information about the 100 most recent patent applications.
| Application Number | Title | Filing Date | Disposal Date | Disposition | Time (months) | Office Actions | Restrictions | Interview | Appeal |
|---|---|---|---|---|---|---|---|---|---|
| 19185160 | SUPERCRITICAL CO2 THICKENER FOR SHALE GAS RESERVOIR BASED ON HOLLOW MESOPOROUS SILICA NANOPARTICLES AND PREPARATION METHOD THEREOF | April 2025 | May 2025 | Allow | 1 | 0 | 0 | No | No |
| 19051090 | TRAILER-INTEGRATED SELF-CONTAINED FRAC-SAND SYSTEM AND METHOD WITH SAFETY FEATURES | February 2025 | April 2025 | Allow | 2 | 0 | 0 | No | No |
| 18977394 | PULSED POWER DRILLING WITH MULTIPLE SELECTIVE DRILLING FLUIDS | December 2024 | June 2025 | Allow | 7 | 0 | 0 | No | No |
| 18971905 | TWIN BIT | December 2024 | June 2025 | Allow | 6 | 1 | 0 | Yes | No |
| 18961299 | MULTIPURPOSE CONVEYOR SYSTEM | November 2024 | May 2025 | Allow | 6 | 1 | 0 | No | No |
| 18953272 | ELECTRICALLY ACTUATED ANNULAR SYSTEM AND METHOD FOR USE IN BLOWOUT PREVENTER | November 2024 | June 2025 | Allow | 7 | 0 | 0 | Yes | No |
| 18943606 | Methods for Shortening Waiting-On-Cement Time in a Subterranean Well | November 2024 | June 2025 | Allow | 7 | 0 | 0 | Yes | No |
| 18943001 | DESANDER ASSEMBLY FOR PLUNGER LIFT SYSTEM | November 2024 | June 2025 | Allow | 7 | 0 | 0 | Yes | No |
| 18939678 | SUPPORT MECHANISM OF SELF-ADAPTIVE TRACTION ROBOT FOR COMPLEX WELLBORE AND CONTROL METHOD THEREOF | November 2024 | February 2025 | Allow | 4 | 1 | 0 | No | No |
| 18938251 | DESANDER FOR A DOWNHOLE ASSEMBLY | November 2024 | April 2025 | Allow | 5 | 1 | 0 | No | No |
| 18915084 | PUSH THE BIT ROTARY STEERABLE SYSTEM | October 2024 | May 2025 | Allow | 7 | 0 | 0 | No | No |
| 18856461 | RAPID ASSEMBLY AND AUTOMATIC SAMPLING DRILLING TOOL FOR FROZEN SOIL LAYER EXPLORATION | October 2024 | June 2025 | Allow | 8 | 0 | 0 | Yes | No |
| 18903594 | Annular Blow Out Preventer | October 2024 | April 2025 | Allow | 7 | 0 | 0 | No | No |
| 18903641 | POLYMER-BASED WELL TRACERS WITH TUNABLE RELEASE PROFILE | October 2024 | May 2025 | Allow | 8 | 0 | 0 | Yes | No |
| 18895379 | SYSTEM FOR OPTIMIZING PARTICLE SIZE DISTRIBUTION OF LOST CIRCULATION MATERIALS | September 2024 | December 2024 | Allow | 3 | 0 | 0 | Yes | No |
| 18892007 | SYSTEM AND METHOD FOR PERMANENT STORAGE OF CARBON DIOXIDE IN SHALE RESERVOIRS | September 2024 | May 2025 | Allow | 8 | 0 | 0 | Yes | No |
| 18830970 | CARBON DIOXIDE SEQUESTERED PROPPANTS FOR WELL STIMULATION | September 2024 | June 2025 | Allow | 9 | 0 | 0 | No | No |
| 18882439 | METHODS AND SYSTEMS FOR ROTATING A CASING TO ENSURE EFFICIENT DISPLACEMENT OF CEMENT SLURRY | September 2024 | May 2025 | Allow | 8 | 0 | 0 | Yes | No |
| 18825367 | METHOD FOR CONSOLIDATING TARGET REGION IN A GEOLOGIC FORMATION | September 2024 | January 2025 | Allow | 5 | 1 | 0 | Yes | No |
| 18825350 | METHOD FOR BINDING SAND IN SUBTERRANEAN FORMATION | September 2024 | January 2025 | Allow | 5 | 1 | 0 | Yes | No |
| 18825309 | METHOD FOR TREATING UNCONSOLIDATED SUBTERRANEAN FORMATIONS | September 2024 | January 2025 | Allow | 5 | 1 | 0 | Yes | No |
| 18818873 | Method of Controlling Tensile-Splitting and Hydro-Shearing Parameters During Completion of Enhanced Geothermal System Wells | August 2024 | March 2025 | Allow | 6 | 1 | 0 | Yes | No |
| 18815732 | HYDRODYNAMIC DOWN-HOLE ANCHORS AND RELATED METHODS | August 2024 | June 2025 | Allow | 9 | 0 | 0 | No | No |
| 18809440 | PROCESS AND MATERIAL FOR REMOVING HYDROGEN SULFIDE FROM SUBTERRANEAN GEOLOGICAL FORMATIONS DURING DRILLING OPERATIONS | August 2024 | January 2025 | Allow | 5 | 0 | 0 | No | No |
| 18809324 | METHOD FOR UNDERGROUND SEPARATION OF COMPONENTS IN SULFUR-CONTAINING FLUE GAS AND SEQUESTRATION OF CARBON DIOXIDE AND SULFIDES | August 2024 | November 2024 | Allow | 3 | 0 | 0 | Yes | No |
| 18804291 | Method of Controlling Tensile-Splitting and Hydro-Shearing Parameters During Completion of Enhanced Geothermal System Wells | August 2024 | March 2025 | Allow | 7 | 1 | 0 | Yes | No |
| 18802048 | SYSTEMS AND PROCESSES FOR STIMULATING SUBTERRANEAN GEOLOGIC FORMATIONS | August 2024 | April 2025 | Allow | 8 | 1 | 0 | Yes | No |
| 18801992 | ENHANCING CONNECTIVITY BETWEEN INJECTOR AND PRODUCER WELLS USING SEQUENCED STIMULATION | August 2024 | January 2025 | Allow | 5 | 1 | 1 | No | No |
| 18800281 | METHOD FOR REDUCING HYDROGEN SULFIDE IN A SUBTERRANEAN FORMATION | August 2024 | January 2025 | Allow | 6 | 1 | 0 | No | No |
| 18800260 | PROCESS FOR REMOVING HYDROGEN SULFIDE FROM A GAS COMPOSITION | August 2024 | October 2024 | Allow | 2 | 1 | 0 | No | No |
| 18800227 | WEIGHTED DRILLING FLUID COMPOSITION | August 2024 | October 2024 | Allow | 2 | 1 | 0 | No | No |
| 18798438 | INTEGRATED DEVICE AND METHOD FOR CONTINUOUSLY CAPTURING, STORING AND SEPARATING FLUE GAS IN UNDERGROUND ROCK STRATUM | August 2024 | February 2025 | Allow | 6 | 1 | 0 | No | No |
| 18796416 | BOTTOM HOLE ASSEMBLY HAVING THREE-POINT CONTACT FOR IMPROVED STEERING | August 2024 | January 2025 | Allow | 5 | 1 | 0 | Yes | No |
| 18794971 | WELLSITE GREENHOUSE GAS REDUCTION AND HYDROGEN PRODUCTION SYSTEM AND METHOD | August 2024 | June 2025 | Allow | 11 | 0 | 0 | Yes | No |
| 18792758 | PROCESS FOR REMOVING HYDROGEN SULFIDE FROM SUBTERRANEAN GEOLOGICAL FORMATIONS WITH A LAYERED TRIPLE HYDROXIDE MATERIAL IN A WATER-BASED DRILLING FLUID | August 2024 | November 2024 | Allow | 4 | 1 | 0 | No | No |
| 18792012 | EFFERVESCENT TABLET FOR ENHANCED OIL RECOVERY AND ENHANCED OIL RECOVERY METHOD USING THE SAME | August 2024 | January 2025 | Allow | 6 | 1 | 0 | No | No |
| 18834825 | IN-SITU PROCESS TO PRODUCE HYDROGEN-BEARING GAS FROM UNDERGROUND PETROLEUM RESERVOIRS | July 2024 | February 2025 | Allow | 7 | 0 | 0 | No | No |
| 18786371 | HIGH THERMAL COEFFICIENT SLURRY COMPOSITIONS AND METHODS THEREFOR | July 2024 | November 2024 | Allow | 3 | 1 | 0 | No | No |
| 18782094 | CARBONATE ROCK FORMATION SURFACTANT INJECTION METHOD | July 2024 | September 2024 | Allow | 2 | 0 | 0 | Yes | No |
| 18782103 | PRESSURE INJECTION METHOD FOR RECOVERING HYDROCARBONS | July 2024 | September 2024 | Allow | 2 | 0 | 0 | Yes | No |
| 18782087 | ENHANCED OIL RECOVERY METHOD AND SYSTEM USING GEMINI SURFACTANT | July 2024 | September 2024 | Allow | 2 | 0 | 0 | Yes | No |
| 18780564 | RESIN SLURRY PLUGGING SYSTEM SUITABLE FOR FRACTURED-VUGGY FORMATION AND PREPARATION AND USE THEREOF | July 2024 | November 2024 | Allow | 4 | 1 | 0 | Yes | No |
| 18779708 | SYSTEMS AND METHODS FOR DELIVERING FLUID INTO A WELLBORE | July 2024 | June 2025 | Allow | 11 | 1 | 1 | No | No |
| 18778355 | CHAMFERED SINKER BAR CONNECTION | July 2024 | June 2025 | Allow | 11 | 1 | 0 | Yes | No |
| 18775655 | METHODS AND APPARATUS TO DECOUPLE DOWNHOLE TOOL SPEED FROM CONVEYANCE TOOLS | July 2024 | May 2025 | Allow | 10 | 1 | 0 | No | No |
| 18770681 | WATER DETECTION AND MEASUREMENT SYSTEM AND METHOD | July 2024 | June 2025 | Allow | 11 | 1 | 0 | Yes | No |
| 18768483 | COMPOSITIONS AND METHODS FOR INHIBITING CLAY SWELLING IN HYDROCARBON SHALE FORMATIONS | July 2024 | September 2024 | Allow | 2 | 1 | 1 | Yes | No |
| 18768776 | REAL TIME AUTOMATED CONTROL METHOD FOR WIRELINE DOWNHOLE DEBRIS COLLECTING WHILE MILLING OPERATION | July 2024 | March 2025 | Allow | 9 | 0 | 0 | No | No |
| 18768521 | COMPOSITIONS AND METHODS FOR INCREASING PERMEABILITY IN HYDROCARBON SHALE FORMATIONS | July 2024 | October 2024 | Allow | 3 | 0 | 1 | No | No |
| 18763426 | HYDROGEN STORAGE AND RECOVERY WITH IRON-RICH SEDIMENTS | July 2024 | March 2025 | Allow | 9 | 0 | 1 | Yes | No |
| 18763303 | REMOVING HYDROGEN SULFIDE FROM SUBTERRANEAN GEOLOGICAL FORMATION WITH A COPPER MAGNESIUM IRON LAYERED TRIPLE HYDROXIDE ZEOLITE MATERIAL IN A WATER-BASED DRILLING FLUID | July 2024 | September 2024 | Allow | 2 | 1 | 0 | No | No |
| 18762783 | AUTOMATIC DETECTION FUNCTION-INTEGRATED DETECTION APPARATUS AND METHOD FOR WATER FLOWING FRACTURED ZONE | July 2024 | November 2024 | Allow | 5 | 0 | 0 | No | No |
| 18762378 | CHEMICAL HYDROSTATIC BACKPRESSURE REDUCTION METHODOLOGY TO FLOW FLUIDS THROUGH DISPOSAL WELLS | July 2024 | April 2025 | Allow | 9 | 0 | 0 | No | No |
| 18761950 | HIGH SOLIDS CONTENT FLUID TECHNIQUES | July 2024 | May 2025 | Allow | 11 | 0 | 0 | No | No |
| 18760130 | NORMALIZED SHIFTING VISUALIZER | July 2024 | April 2025 | Allow | 10 | 0 | 0 | No | No |
| 18760009 | GAS DRIVEN WIRELINE RELEASE TOOL | June 2024 | March 2025 | Allow | 9 | 1 | 0 | No | No |
| 18725300 | COILED TUBING TOOL FLOW TUBE ARCHITECTURE | June 2024 | May 2025 | Allow | 10 | 1 | 0 | Yes | No |
| 18725471 | BLOWOUT PREVENTER RAM SEALS AND RAM BLOCKS | June 2024 | March 2025 | Allow | 9 | 0 | 0 | Yes | No |
| 18756391 | Method of Controlling Tensile-Splitting and Hydro-Shearing Parameters During Completion of Enhanced Geothermal System Wells | June 2024 | January 2025 | Allow | 6 | 1 | 0 | Yes | No |
| 18724304 | METHOD AND SYSTEM FOR SIMULTANEOUS WIRELINE MILLING AND DEBRIS COLLECTION | June 2024 | October 2024 | Allow | 4 | 0 | 0 | No | No |
| 18753570 | MONOBORE DRILLING METHODS WITH MANAGED PRESSURE DRILLING | June 2024 | January 2025 | Allow | 7 | 0 | 0 | No | No |
| 18750652 | Displaceable Shoe Track Assembly | June 2024 | January 2025 | Allow | 7 | 0 | 0 | No | No |
| 18722540 | A WIPER TOOL | June 2024 | March 2025 | Allow | 9 | 0 | 0 | Yes | No |
| 18746387 | SURFACTANTS FOR OIL AND GAS PRODUCTION | June 2024 | March 2025 | Allow | 8 | 0 | 1 | Yes | No |
| 18720970 | MULTIPLE EXPANDABLE METAL PACKERS WITH HYDROLOCK PREVENTION | June 2024 | May 2025 | Allow | 11 | 1 | 0 | Yes | No |
| 18719888 | METHOD FOR DEPLOYING A WELL PUMP ON AN ELECTRICAL CABLE | June 2024 | November 2024 | Allow | 5 | 1 | 0 | No | No |
| 18743952 | ZERO FLARING ZONAL FORMATION TESTING WITH DRILL STEM TESTING CAPABILITIES | June 2024 | May 2025 | Allow | 11 | 0 | 0 | No | No |
| 18720297 | DEPLOYMENT TOOL AND METHOD | June 2024 | April 2025 | Allow | 10 | 0 | 0 | No | No |
| 18719587 | DRILLING TOOL AND METHOD FOR PRODUCING A BORE IN THE GROUND | June 2024 | March 2025 | Allow | 9 | 0 | 0 | No | No |
| 18742447 | SETTING TOOL | June 2024 | April 2025 | Allow | 10 | 1 | 0 | No | No |
| 18718716 | SNAP LATCH OR COLLET PROFILE | June 2024 | October 2024 | Allow | 4 | 0 | 0 | No | No |
| 18718446 | A POLYHALITE COMPOSITION AND METHOD FOR ENHANCED RECOVERY OF OIL | June 2024 | April 2025 | Allow | 10 | 1 | 0 | No | No |
| 18738214 | METHODS AND SYSTEMS FOR PUMP DOWN RINGS FOR FRAC PLUGS | June 2024 | May 2025 | Allow | 11 | 1 | 0 | No | No |
| 18737664 | ESP MONITORING SYSTEM AND METHODOLOGY | June 2024 | February 2025 | Allow | 9 | 1 | 0 | No | No |
| 18737518 | DOWNHOLE SEPARATION SYSTEM AND METHOD | June 2024 | April 2025 | Allow | 10 | 1 | 0 | No | No |
| 18733866 | IN-SITU STRESS MEASUREMENT DEVICE AND METHOD FOR ULTRA-DEEP NON-VERTICAL DRILLING | June 2024 | January 2025 | Allow | 8 | 0 | 0 | No | No |
| 18716817 | DAMPING DRILL STRING VIBRATIONS | June 2024 | May 2025 | Allow | 11 | 1 | 0 | No | No |
| 18734583 | SYSTEMS AND METHODS FOR DRILLING A WELL | June 2024 | January 2025 | Allow | 8 | 0 | 0 | Yes | No |
| 18732816 | Method of Controlling Tensile-Splitting and Hydro-Shearing Parameters During Completion of Enhanced Geothermal System Wells | June 2024 | November 2024 | Allow | 5 | 1 | 0 | Yes | No |
| 18732770 | INITIATOR SYSTEM PROVIDING SET CONFIRMATION FROM PLUG SETTING TOOL IN DOWNHOLE WELL | June 2024 | April 2025 | Allow | 11 | 0 | 0 | No | No |
| 18716058 | FUNCTIONALIZED NANOPARTICLES AS WETABILITY MODIFIER | June 2024 | June 2025 | Allow | 12 | 1 | 1 | No | No |
| 18715122 | MONITORING CASING ANNULUS | May 2024 | September 2024 | Allow | 4 | 0 | 0 | No | No |
| 18677430 | METHOD OF USING A DISSOLVABLE DEPLOYMENT DEVICE FOR THE TRANSFER OF ULTRAHIGH RESOLUTION NANOPARTICLE TRACER ADDITIVES INTO A WELLBORE | May 2024 | June 2025 | Allow | 13 | 1 | 0 | No | No |
| 18714495 | PACKER ASSEMBLY WITH AN ANTI-EXTRUSION ASSEMBLY | May 2024 | May 2025 | Allow | 11 | 1 | 0 | Yes | No |
| 18677530 | Use of Graphene to Enhance Stability and Density Control of Cement Slurries | May 2024 | June 2025 | Allow | 13 | 1 | 1 | Yes | No |
| 18675521 | WELL PRODUCTION MANAGEMENT IN SOUR ENVIRONMENT AT A SURFACE EQUIPMENT ZONE | May 2024 | June 2025 | Allow | 13 | 0 | 0 | Yes | No |
| 18713189 | WIRE-GUIDED AUTOMATIC PAY-OFF DEVICE AND METHOD | May 2024 | June 2025 | Allow | 13 | 1 | 0 | No | No |
| 18672094 | SYNTHESIS AND USE OF GRAFTED GRAPHENE IN AQUEOUS DRILLING FLUIDS AS LOW SHEAR RATE VISCOSITY ENHANCER | May 2024 | June 2025 | Allow | 13 | 0 | 1 | Yes | No |
| 18672622 | SELF-SETTING PLUG | May 2024 | January 2025 | Allow | 8 | 0 | 0 | Yes | No |
| 18671211 | TRACERS FOR PETROLEUM RESERVOIRS | May 2024 | April 2025 | Allow | 11 | 0 | 1 | No | No |
| 18712120 | NON-PRESSURE SENSITIVE MODULE FOR LINER HANGER INSTALLATION | May 2024 | March 2025 | Allow | 10 | 0 | 0 | No | No |
| 18668487 | SNAKE-SKIN-INSPIRED IN-HOLE BOW SPRING CENTRALIZER | May 2024 | February 2025 | Allow | 9 | 0 | 0 | Yes | No |
| 18666942 | Multi-Stage Temporary Plugging Fracturing Method Based on Stress Cage Effect, Device Thereof and Storage Medium | May 2024 | April 2025 | Allow | 11 | 0 | 0 | Yes | No |
| 18667222 | HOT CRUDE GRAVITY DRAINAGE (HCGD) FOR HEAVY AND EXTRA-HEAVY ENHANCED OIL RECOVERY (EOR) | May 2024 | December 2024 | Allow | 7 | 0 | 0 | No | No |
| 18667229 | WHIPSTOCK TO PLUG AND ABANDON WELLBORE BELOW SETTING DEPTH | May 2024 | May 2025 | Allow | 12 | 1 | 0 | No | No |
| 18664641 | Identifying Hydrogen Sweet Spots in Subsurface Formations | May 2024 | August 2024 | Allow | 3 | 1 | 0 | No | No |
| 18663929 | POWER DISTRIBUTION TRAILER FOR AN ELECTRIC DRIVEN HYDRAULIC FRACKING SYSTEM | May 2024 | May 2025 | Allow | 12 | 1 | 0 | No | No |
| 18664000 | ELECTRIC DRIVEN HYDRAULIC FRACKING SYSTEM | May 2024 | May 2025 | Allow | 12 | 1 | 0 | Yes | No |
| 18663154 | DISPLACEMENT SYSTEM SUITABLE FOR STRONG HETEROGENEOUS OIL RESERVOIR AND ITS APPLICATION | May 2024 | September 2024 | Allow | 4 | 0 | 0 | Yes | No |
| 18658704 | PROCESS FOR PROVIDING STEAM FOR A HYDROCARBON RECOVERY PROCESS | May 2024 | May 2025 | Allow | 12 | 1 | 0 | No | No |
This analysis examines appeal outcomes and the strategic value of filing appeals for art-unit 3674.
With a 42.4% reversal rate, the PTAB reverses the examiner's rejections in a meaningful percentage of cases. This reversal rate is in the top 25% across the USPTO, indicating that appeals are more successful here than in most other areas.
Filing a Notice of Appeal can sometimes lead to allowance even before the appeal is fully briefed or decided by the PTAB. This occurs when the examiner or their supervisor reconsiders the rejection during the mandatory appeal conference (MPEP § 1207.01) after the appeal is filed.
In this dataset, 37.0% of applications that filed an appeal were subsequently allowed. This appeal filing benefit rate is above the USPTO average, suggesting that filing an appeal can be an effective strategy for prompting reconsideration.
✓ Appeals to PTAB show good success rates. If you have a strong case on the merits, consider fully prosecuting the appeal to a Board decision.
✓ Filing a Notice of Appeal is strategically valuable. The act of filing often prompts favorable reconsideration during the mandatory appeal conference.
Art Unit 3674 is part of Group 3670 in Technology Center 3600. This art unit has examined 12,238 patent applications in our dataset, with an overall allowance rate of 77.3%. Applications typically reach final disposition in approximately 27 months.
Art Unit 3674's allowance rate of 77.3% places it in the 48% percentile among all USPTO art units. This art unit has a below-average allowance rate compared to other art units.
Applications in Art Unit 3674 receive an average of 1.90 office actions before reaching final disposition (in the 58% percentile). The median prosecution time is 27 months (in the 65% percentile).
When prosecuting applications in this art unit, consider the following:
Not Legal Advice: The information provided in this report is for informational purposes only and does not constitute legal advice. You should consult with a qualified patent attorney or agent for advice specific to your situation.
No Guarantees: We do not provide any guarantees as to the accuracy, completeness, or timeliness of the statistics presented above. Patent prosecution statistics are derived from publicly available USPTO data and are subject to data quality limitations, processing errors, and changes in USPTO practices over time.
Limitation of Liability: Under no circumstances will IronCrow AI be liable for any outcome, decision, or action resulting from your reliance on the statistics, analysis, or recommendations presented in this report. Past prosecution patterns do not guarantee future results.
Use at Your Own Risk: While we strive to provide accurate and useful prosecution statistics, you should independently verify any information that is material to your prosecution strategy and use your professional judgment in all patent prosecution matters.