USPTO Examiner GRAY GEORGE STERLING - Art Unit 3676

Recent Applications

Detailed information about the 100 most recent patent applications.

Application NumberTitleFiling DateDisposal DateDispositionTime (months)Office ActionsRestrictionsInterviewAppeal
18741708ELECTROMAGNETIC REVERSAL DOWNHOLE PRESSURE INTENSIFIERJune 2024December 2024Allow610YesNo
18654706PLUNGER LIFT WITH AN ADJUSTABLE AND VARIABLE CLUTCHMay 2024June 2025Allow1410YesNo
18654734SAFETY VALVE, METHOD, AND SYSTEMMay 2024June 2025Allow1310YesNo
18602944ELECTRIC AUTO-CATCHERMarch 2024April 2025Allow1320NoNo
18433809SYSTEM, APPARATUS AND METHOD FOR ARTIFICIAL LIFT, AND IMPROVED DOWNHOLE ACTUATOR FOR SAMEFebruary 2024April 2025Allow1510YesNo
18402855SLICKLINE LUBRICATION DEVICES, SYSTEMS, AND METHODS FOR USING THE SAMEJanuary 2024May 2025Allow1710YesNo
18529881CASING SHOE ASSEMBLYDecember 2023January 2025Allow1410YesNo
18528633BOREHOLE SAND CATCHERDecember 2023April 2025Abandon1610NoNo
18484900DOWN-THE-HOLE DRILL HAMMER HAVING A RIBBED EXHAUST TUBEOctober 2023May 2025Allow1910NoNo
18475928SYSTEM AND METHOD FOR ACTIVE CENTRALIZATION OF DOWNHOLE WELL TOOLSSeptember 2023September 2024Allow1210YesNo
18473364DOWNHOLE WET-MATE SYSTEMS AND METHODS USING WET-MATE DEPLOYMENT CARRIERSeptember 2023April 2025Allow1810YesNo
18239964MODULAR FRACTURING SYSTEMAugust 2023February 2025Abandon1810NoNo
18216339Environmental Sensing Wireline StandoffJune 2023March 2024Allow800YesNo
18340709DRILL BIT FOR DOWNHOLE ELECTROCRUSHING DRILLINGJune 2023August 2024Allow1310YesNo
18310392PUSH ON AND PULL OFF CONFIGURABLE RETRIEVING SYSTEM FOR INTERCEPT RETRIEVABLE BRIDGE PLUGMay 2023August 2024Allow1510YesNo
18140607Adaptive Fluid Switches having a Temporary ConfigurationApril 2023June 2024Allow1300YesNo
18033977APPARATUSES AND METHODS FOR USE WITH REVERSE CIRCULATION OVERSHOT SYSTEMSApril 2023August 2024Allow1610NoNo
18183535FLEXIBLE PIPE CONNECTION SYSTEMS AND METHODSMarch 2023October 2024Allow1910NoNo
18042823ANNULAR BLOWOUT PREVENTERFebruary 2023April 2024Allow1310YesNo
18167492METHOD AND DEVICE FOR OBTAINING MEASUREMENTS OF DOWNHOLE PROPERTIES IN A SUBTERRANEAN WELLFebruary 2023March 2024Allow1401YesNo
18007316Methods for Determining a Position of a Droppable Object in a WellboreJanuary 2023October 2024Allow2110YesNo
18160025FRANGIBLE DISK ARRANGEMENT, METHOD, AND SYSTEMJanuary 2023May 2024Allow1510YesNo
18101643DOWNHOLE GAS VENTILATION SYSTEM FOR ARTIFICIAL LIFT APPLICATIONSJanuary 2023September 2024Allow1911NoNo
18153809HYDRAULIC SLIDING SLEEVE FOR ELECTRIC SUBMERSIBLE PUMP APPLICATIONSJanuary 2023September 2024Allow2010YesNo
18095413Volumetric Compensation For Sealing Performance Under Large Temperature Swing ConditionsJanuary 2023June 2025Allow2921YesNo
18010721DOWNHOLE TOOL AND METHOD FOR OPERATING THE SAMEDecember 2022December 2024Allow2410YesNo
18076770Float Valve InsertDecember 2022August 2023Allow810NoNo
18007941Pulling toolDecember 2022December 2023Allow1300YesNo
17990190SWAB RESISTANT SEAL TOOL AND SYSTEMNovember 2022August 2024Abandon2110NoNo
17989674DOWNHOLE BIPARTITE DATA TRANSMISSON ASSEMBLYNovember 2022June 2024Allow1910YesNo
17924782ACTIVATING A REFERENCE POINTNovember 2022July 2024Allow2010YesNo
17981945TUNNELING AND NAVIGATION SYSTEMS INCLUDING CONTROLLER CONFIGURED TO DETERMINE ENVIRONMENTAL CHARACTERISTICNovember 2022June 2025Allow3130YesNo
17971878DRILL BIT FOR DOWNHOLE ELECTROCRUSHING DRILLINGOctober 2022October 2023Abandon1210NoNo
17962788DOWNHOLE TUBING DISCONNECT TOOLOctober 2022May 2024Allow2010NoNo
17995611MULTI-TRIP WELLBORE COMPLETION SYSTEM WITH A SERVICE STRINGOctober 2022August 2024Allow2311YesNo
17911791Apparatus for, and Method of, Controlling Sand Production from an Oil WellSeptember 2022August 2023Allow1110NoNo
17895501MECHANICAL STEPPERAugust 2022January 2023Allow500YesNo
17820626Determining Asphaltene OnsetAugust 2022June 2024Abandon2220NoNo
17819839POSITION SENSOR ASSEMBLY WITH CIRCUMFERENTIAL MAGNETIC COUPLING FOR WELLBORE OPERATIONSAugust 2022January 2025Allow2910YesNo
17883081DOUBLE BARRIER GAS LIFT FLOW CONTROL DEVICEAugust 2022January 2023Allow510YesNo
17816893SHEAR PIN FOR DEACTIVATING A STEERING PAD OF A ROTARY STEERABLE SYSTEMAugust 2022August 2024Allow2510YesNo
17796202DOWNHOLE CONTROL ARRANGEMENT, VALVE ARRANGEMENT, SIDE POCKET MANDREL, AND METHOD FOR OPERATING A DOWNHOLE VALVE ARRANGEMENTJuly 2022July 2024Allow2310YesNo
17869167Adaptive Fluid Switches for Autonomous Flow ControlJuly 2022December 2022Allow500YesNo
17865730FLUID ENERGIZED METAL-TO-METAL SEAL WITH RETRIEVAL CAPABILITIESJuly 2022June 2024Allow2320YesNo
17840606SYSTEM, APPARATUS AND METHOD FOR ARTIFICIAL LIFT, AND IMPROVED DOWNHOLE ACTUATOR FOR SAMEJune 2022November 2023Allow1710NoNo
17780921ACTIVELY CONTROLLED BAILERMay 2022January 2025Allow3111NoNo
17746060Gas lift valve with two simultaneous mechanical stopsMay 2022March 2023Allow1001YesNo
17735977Environmental Sensing Wireline StandoffMay 2022January 2023Allow810NoNo
17726066FLOW RESTRICTOR METHOD AND APPARATUSApril 2022July 2024Allow2710YesNo
17720030WELLBORE CLEANOUT MAGNET TOOLApril 2022March 2024Allow2310YesNo
17716728METHOD FOR ASSEMBLING A LINER SYSTEMApril 2022January 2024Allow2110YesNo
17656331SELECTIVE INFLOW CONTROL DEVICE, SYSTEM, AND METHODMarch 2022February 2024Allow2310YesNo
17654132METHODS AND SYSTEMS FOR CEMENTED OPEN HOLE INTELLIGENT COMPLETIONS IN MULTILATERAL WELLS REQUIRING FULL ISOLATION OF GAS CAP, FRACTURES AND / OR WATER BEARING BOUNDARIESMarch 2022December 2024Allow3320YesNo
17687089MODULAR SOLUTION MINING SYSTEM AND METHODSMarch 2022April 2024Allow2510YesNo
17651287SYSTEM AND METHOD FOR ACTIVE CENTRALIZATION OF DOWNHOLE WELL TOOLSFebruary 2022August 2023Allow1710YesNo
17668562METHOD AND APPARATUS FOR MAKING A LATERAL WELLFebruary 2022July 2024Allow2920NoNo
17649121PRESSURE-PULSING FOR EFFECTIVE MUDCAKE REMOVALJanuary 2022December 2024Allow3421NoNo
17575528DEBRIS COLLECTION TOOLJanuary 2022February 2023Allow1310YesNo
17556539Steering System For Use With A Drill StringDecember 2021July 2023Allow1810NoNo
17541608VALVE WITH PUMP ROTOR PASSAGE FOR USE IN DOWNHOLE PRODUCTION STRINGSDecember 2021February 2023Allow1400YesNo
17531363DOUBLE BARRIER GAS LIFT FLOW CONTROL DEVICENovember 2021June 2022Allow610YesNo
17520649Redistribution of Mass on the Earth's Surface to Offset Induced Earth Axis WobbleNovember 2021November 2022Abandon1201NoNo
17510820Intelligent Well Control System and Method for Surface Blow-Out Preventer Equipment StackOctober 2021March 2025Abandon4120YesNo
17506178FLOW CONTROL DEVICE, METHOD, AND SYSTEMOctober 2021April 2023Allow1810YesNo
17500988MANIFOLD IMPLEMENTED IN MULTI-CHANNEL SYSTEM FOR CONTROLLING FLOW OF FLUIDS IN OIL WELLOctober 2021November 2023Abandon2510NoNo
17449210DEVICE AND METHOD FOR GAS LIFT OF A RESERVOIR FLUIDSeptember 2021December 2023Allow2720NoNo
17483430TORPEDO PLUNGERSeptember 2021March 2023Allow1710YesNo
17479032MANAGED PRESSURE DRILLING CONTROL SYSTEM WITH CONTINUOUSLY VARIABLE TRANSMISSIONSeptember 2021March 2024Allow3040NoNo
17474230TAPERED MULTISTAGE PLUNGER LIFT WITH BYPASS SLEEVESeptember 2021August 2022Allow1100YesNo
17460923Methods for In-Situ Multi-Temperature Measurements Using Downhole Acquisition ToolAugust 2021March 2023Allow1910YesNo
17412397MODULAR ANTI-ROTATION DRILLING SYSTEMS AND METHODSAugust 2021September 2022Allow1300YesNo
17399800BUMPER SPRINGAugust 2021March 2023Allow2010YesNo
17384386Degradable Plug Device For A PipeJuly 2021January 2023Allow1810NoNo
17376220LUBRICATING ELEMENT FOR DRAG REDUCTION IN PRODUCTION AND TRANSPORTATION OF WATER-CUT HEAVY OIL IN WELLBOREJuly 2021February 2023Allow1910YesNo
17370587MINING BIT AND METHOD OF MANUFACTURING THE BITJuly 2021January 2023Abandon1810YesNo
17368286VENTURI ACTIVATED DOWNHOLE TORQUE LIMITERJuly 2021July 2023Allow2410YesNo
17363590DOWNHOLE RECONFIGURATION OF PULSED-POWER DRILLING SYSTEM COMPONENTS DURING PULSED DRILLING OPERATIONSJune 2021January 2022Allow610YesNo
17353125ADDITIVE MANUFACTURED FLOATS FOR USE IN A DOWNHOLE ENVIRONMENTJune 2021September 2023Allow2710YesNo
17352155GAS-PHASE SOLVENT MANAGEMENT DURING PRODUCTION OF IN-SITU HYDROCARBONSJune 2021January 2024Allow3130YesNo
17349318Gas lift valve with dual fortress sealJune 2021December 2021Allow600YesNo
17339050STANDING VALVE ASSEMBLY AND RELATED SYSTEMS FOR DOWNHOLE RECIPROCATING PUMPJune 2021October 2022Allow1710YesNo
17325880GAS LIFT SYSTEMS, FLOW REGIME MODIFIERS, AND RELATED METHODSMay 2021November 2023Allow2921YesNo
17324549MANIFOLD IMPLEMENTED IN MULTI-CHANNEL SYSTEM FOR CONTROLLING FLOW OF FLUIDS IN OIL WELLMay 2021August 2023Abandon2710NoNo
17291709METHOD OF GRAVEL PACKING OPEN HOLESMay 2021November 2023Allow3010YesNo
17220987DOWNHOLE TOOL SECURABLE IN A TUBULAR STRINGApril 2021November 2022Allow2010YesNo
17281133NOZZLE FOR GAS CHOKINGMarch 2021July 2024Abandon3920NoNo
17205318SETTING AND RETRIEVAL MECHANISMMarch 2021April 2023Allow2510YesNo
17276495EXPANDABLE LINER AND METHOD FOR RUNNING THE SAMEMarch 2021August 2023Allow2910NoNo
17200207AUTOMATED GEOSTEERING BASED ON A DISTANCE TO OIL-WATER CONTACTMarch 2021April 2024Allow3750YesNo
17164067ORIENTING A DOWNHOLE TOOL IN A WELLBOREFebruary 2021November 2023Allow3430YesNo
17162743SYSTEM AND METHOD OF WELL OPERATIONS USING A VIRTUAL PLUNGERJanuary 2021March 2022Allow1410YesNo
17154508High Power Laser Completion Drilling Tool and Methods for Upstream Subsurface ApplicationsJanuary 2021April 2022Allow1400YesNo
17143690Deep Horizontal Water WellJanuary 2021March 2022Allow1400YesNo
17142574MODULAR FRACTURING SYSTEMJanuary 2021October 2023Abandon3320NoNo
17127169METHOD AND DEVICE FOR OBTAINING MEASUREMENTS OF DOWNHOLE PROPERTIES IN A SUBTERRANEAN WELLDecember 2020October 2022Allow2210YesNo
17124577WEIGHT AND DENSITY STABLE MATERIALS FOR FLOW CONTROL DEVICE FLOAT BODIESDecember 2020March 2023Abandon2710NoNo
16972057APPARATUS AND METHODS FOR A GAS LIFT VALVEDecember 2020June 2022Allow1810YesNo
17108765DRILL BIT FOR DOWNHOLE ELECTROCRUSHING DRILLINGDecember 2020June 2022Allow1810YesNo
17091509Method and Apparatus for Low Displacement, Hydraulically-Suppressed and Flow-Through Shock DampeningNovember 2020December 2022Allow2510NoNo
17051894BOREHOLE SAND CATCHEROctober 2020August 2023Allow3430YesNo

Appeals Overview

This analysis examines appeal outcomes and the strategic value of filing appeals for examiner GRAY, GEORGE STERLING.

Patent Trial and Appeal Board (PTAB) Decisions

Total PTAB Decisions
14
Examiner Affirmed
10
(71.4%)
Examiner Reversed
4
(28.6%)
Reversal Percentile
44.4%
Lower than average

What This Means

With a 28.6% reversal rate, the PTAB affirms the examiner's rejections in the vast majority of cases. This reversal rate is below the USPTO average, indicating that appeals face more challenges here than typical.

Strategic Value of Filing an Appeal

Total Appeal Filings
29
Allowed After Appeal Filing
10
(34.5%)
Not Allowed After Appeal Filing
19
(65.5%)
Filing Benefit Percentile
53.8%
Higher than average

Understanding Appeal Filing Strategy

Filing a Notice of Appeal can sometimes lead to allowance even before the appeal is fully briefed or decided by the PTAB. This occurs when the examiner or their supervisor reconsiders the rejection during the mandatory appeal conference (MPEP § 1207.01) after the appeal is filed.

In this dataset, 34.5% of applications that filed an appeal were subsequently allowed. This appeal filing benefit rate is above the USPTO average, suggesting that filing an appeal can be an effective strategy for prompting reconsideration.

Strategic Recommendations

Appeals to PTAB face challenges. Ensure your case has strong merit before committing to full Board review.

Filing a Notice of Appeal is strategically valuable. The act of filing often prompts favorable reconsideration during the mandatory appeal conference.

Examiner GRAY, GEORGE STERLING - Prosecution Strategy Guide

Executive Summary

Examiner GRAY, GEORGE STERLING works in Art Unit 3676 and has examined 670 patent applications in our dataset. With an allowance rate of 77.8%, this examiner has a below-average tendency to allow applications. Applications typically reach final disposition in approximately 31 months.

Allowance Patterns

Examiner GRAY, GEORGE STERLING's allowance rate of 77.8% places them in the 37% percentile among all USPTO examiners. This examiner has a below-average tendency to allow applications.

Office Action Patterns

On average, applications examined by GRAY, GEORGE STERLING receive 1.77 office actions before reaching final disposition. This places the examiner in the 53% percentile for office actions issued. This examiner issues a slightly above-average number of office actions.

Prosecution Timeline

The median time to disposition (half-life) for applications examined by GRAY, GEORGE STERLING is 31 months. This places the examiner in the 38% percentile for prosecution speed. Prosecution timelines are slightly slower than average with this examiner.

Interview Effectiveness

Conducting an examiner interview provides a +11.5% benefit to allowance rate for applications examined by GRAY, GEORGE STERLING. This interview benefit is in the 50% percentile among all examiners. Recommendation: Interviews provide an above-average benefit with this examiner and are worth considering.

Request for Continued Examination (RCE) Effectiveness

When applicants file an RCE with this examiner, 29.9% of applications are subsequently allowed. This success rate is in the 49% percentile among all examiners. Strategic Insight: RCEs show below-average effectiveness with this examiner. Carefully evaluate whether an RCE or continuation is the better strategy.

After-Final Amendment Practice

This examiner enters after-final amendments leading to allowance in 38.2% of cases where such amendments are filed. This entry rate is in the 51% percentile among all examiners. Strategic Recommendation: This examiner shows above-average receptiveness to after-final amendments. If your amendments clearly overcome the rejections and do not raise new issues, consider filing after-final amendments before resorting to an RCE.

Pre-Appeal Conference Effectiveness

When applicants request a pre-appeal conference (PAC) with this examiner, 42.9% result in withdrawal of the rejection or reopening of prosecution. This success rate is in the 37% percentile among all examiners. Note: Pre-appeal conferences show below-average success with this examiner. Consider whether your arguments are strong enough to warrant a PAC request.

Appeal Withdrawal and Reconsideration

This examiner withdraws rejections or reopens prosecution in 54.8% of appeals filed. This is in the 21% percentile among all examiners. Of these withdrawals, 23.5% occur early in the appeal process (after Notice of Appeal but before Appeal Brief). Strategic Insight: This examiner rarely withdraws rejections during the appeal process compared to other examiners. If you file an appeal, be prepared to fully prosecute it to a PTAB decision. Per MPEP § 1207, the examiner will prepare an Examiner's Answer maintaining the rejections.

Petition Practice

When applicants file petitions regarding this examiner's actions, 32.7% are granted (fully or in part). This grant rate is in the 26% percentile among all examiners. Strategic Note: Petitions show below-average success regarding this examiner's actions. Ensure you have a strong procedural basis before filing.

Examiner Cooperation and Flexibility

Examiner's Amendments: This examiner makes examiner's amendments in 1.2% of allowed cases (in the 70% percentile). This examiner makes examiner's amendments more often than average to place applications in condition for allowance (MPEP § 1302.04).

Quayle Actions: This examiner issues Ex Parte Quayle actions in 0.0% of allowed cases (in the 36% percentile). This examiner issues Quayle actions less often than average. Allowances may come directly without a separate action for formal matters.

Prosecution Strategy Recommendations

Based on the statistical analysis of this examiner's prosecution patterns, here are tailored strategic recommendations:

    Relevant MPEP Sections for Prosecution Strategy

    • MPEP § 713.10: Examiner interviews - available before Notice of Allowance or transfer to PTAB
    • MPEP § 714.12: After-final amendments - may be entered "under justifiable circumstances"
    • MPEP § 1002.02(c): Petitionable matters to Technology Center Director
    • MPEP § 1004: Actions requiring primary examiner signature (allowances, final rejections, examiner's answers)
    • MPEP § 1207.01: Appeal conferences - mandatory for all appeals
    • MPEP § 1214.07: Reopening prosecution after appeal

    Important Disclaimer

    Not Legal Advice: The information provided in this report is for informational purposes only and does not constitute legal advice. You should consult with a qualified patent attorney or agent for advice specific to your situation.

    No Guarantees: We do not provide any guarantees as to the accuracy, completeness, or timeliness of the statistics presented above. Patent prosecution statistics are derived from publicly available USPTO data and are subject to data quality limitations, processing errors, and changes in USPTO practices over time.

    Limitation of Liability: Under no circumstances will IronCrow AI be liable for any outcome, decision, or action resulting from your reliance on the statistics, analysis, or recommendations presented in this report. Past prosecution patterns do not guarantee future results.

    Use at Your Own Risk: While we strive to provide accurate and useful prosecution statistics, you should independently verify any information that is material to your prosecution strategy and use your professional judgment in all patent prosecution matters.