Detailed information about the 100 most recent patent applications.
| Application Number | Title | Filing Date | Disposal Date | Disposition | Time (months) | Office Actions | Restrictions | Interview | Appeal |
|---|---|---|---|---|---|---|---|---|---|
| 18730117 | A Linear Motor For Use In A Molten Salt Nuclear Reactor And A Valve For Use In A Molten Salt Nuclear Reactor | July 2024 | February 2026 | Abandon | 19 | 2 | 1 | Yes | No |
| 18422434 | Nano-Engineered Materials for LENR | January 2024 | March 2025 | Abandon | 14 | 0 | 1 | No | No |
| 18359594 | DEBRIS FILTERING ARRANGEMENT FOR NUCLEAR FUEL ASSEMBLY BOTTOM NOZZLE AND BOTTOM NOZZLE INCLUDING SAME | July 2023 | November 2025 | Allow | 27 | 1 | 1 | No | No |
| 18353509 | Method Of Converging Plasma Pistons | July 2023 | February 2026 | Allow | 31 | 2 | 1 | Yes | No |
| 18350970 | Nuclear Reactor and Operation Method for Nuclear Reactor | July 2023 | March 2025 | Abandon | 20 | 1 | 1 | No | No |
| 18318391 | TECHNIQUES FOR AUTOMATED MAINTENANCE OF A TOKAMAK AND RELATED SYSTEMS AND METHODS | May 2023 | June 2025 | Allow | 25 | 0 | 1 | No | No |
| 18305831 | COATINGS AND SURFACE MODIFICATIONS TO MITIGATE SiC CLADDING DURING OPERATION IN LIGHT WATER REACTORS | April 2023 | July 2025 | Abandon | 27 | 3 | 1 | No | No |
| 18184351 | METHOD FOR AMERLIORATING IMPACT BETWEEN COMPONENTS OF NUCLEAR FUEL STORAGE SYSTEM | March 2023 | September 2024 | Allow | 19 | 1 | 1 | No | No |
| 18163415 | Micro-Reactor Fuel Sleeve Assembly | February 2023 | May 2025 | Allow | 27 | 0 | 1 | Yes | No |
| 18104764 | CONTROL ROD DAMPING SYSTEM | February 2023 | March 2026 | Allow | 37 | 1 | 1 | Yes | No |
| 18019129 | METHOD OF DYNAMIC CONTROL ROD REACTIVITY MEASUREMENT | February 2023 | October 2025 | Allow | 32 | 1 | 0 | Yes | No |
| 17619121 | GUIDING DEVICE OF A SYSTEM FOR CONFINING AND COOLING MELT FROM THE CORE OF A NUCLEAR REACTOR | January 2023 | February 2026 | Abandon | 50 | 2 | 0 | No | No |
| 18101021 | EVACUATED CONTAINMENT VESSEL FOR NUCLEAR REACTOR | January 2023 | September 2024 | Allow | 20 | 0 | 1 | Yes | No |
| 18157561 | FISSION PRODUCT TRAP FOR SALT PIPE AND PUMP SHAFT SEALS AND METHODS OF USE THEREOF | January 2023 | November 2025 | Allow | 34 | 1 | 1 | Yes | No |
| 18093517 | ELECTROMAGNETIC CONFINEMENT OF PLASMA IN A CONTROLLED FUSION REACTOR | January 2023 | March 2026 | Abandon | 38 | 1 | 1 | No | No |
| 18013999 | RADIATION SHIELDING FOR COMPACT AND TRANSPORTABLE NUCLEAR POWER SYSTEMS | December 2022 | January 2026 | Allow | 36 | 1 | 1 | Yes | No |
| 18010358 | CONTROL DRUM CONTROLLER FOR NUCLEAR REACTOR SYSTEM | December 2022 | April 2025 | Allow | 28 | 0 | 0 | Yes | No |
| 17981978 | FUEL RACK APPARATUS HAVING STORAGE TUBES COMPRISING INTERIOR FLUX TRAP CHAMBERS | November 2022 | March 2025 | Allow | 28 | 3 | 1 | Yes | No |
| 17923036 | ENERGY SOURCE | November 2022 | June 2025 | Abandon | 31 | 1 | 0 | No | No |
| 17906141 | SPHERICAL TOKAMAK WITH HIGH POWER GAIN RATIO | September 2022 | August 2025 | Abandon | 35 | 1 | 1 | No | No |
| 17930909 | METHOD FOR PERFORMING STAR/ARWV RECONCILIATION | September 2022 | April 2025 | Abandon | 31 | 2 | 1 | No | No |
| 17901967 | 3D Printing of Additive Structures for Nuclear Fuels | September 2022 | January 2023 | Allow | 5 | 0 | 0 | Yes | No |
| 17800128 | CARRIER FOR IRRADIATED TARGET AND DISSOLUTION SYSTEM FOR PRODUCING SOLUTION OF SAME | August 2022 | June 2025 | Abandon | 34 | 0 | 1 | No | No |
| 17819146 | NUCLEAR FUSION APPARATUS | August 2022 | August 2024 | Abandon | 24 | 1 | 1 | No | No |
| 17799202 | ROBUST AUTOMATIC TRACKING OF INDIVIDUAL TRISO-FUELED PEBBLES THROUGH A NOVEL APPLICATION OF X-RAY IMAGING AND MACHINE LEARNING | August 2022 | November 2025 | Allow | 39 | 2 | 1 | Yes | No |
| 17880319 | Multipurpose small modular fluoride-salt-cooled high-temperature reactor energy system | August 2022 | December 2024 | Abandon | 29 | 3 | 0 | No | No |
| 17880137 | CONTAINMENT APPARATUS MONITORING SYSTEM AND METHOD | August 2022 | August 2025 | Abandon | 36 | 1 | 1 | No | No |
| 17759332 | NUCLEAR ENERGY PRODUCTION DEVICE AND ASSOCIATED COMPONENTS, SYSTEMS, AND METHODS | July 2022 | September 2025 | Abandon | 38 | 2 | 1 | No | No |
| 17859398 | DEVICE AND METHOD FOR THIRD LOW-TEMPERATURE CONTROLLABLE NUCLEAR FUSION | July 2022 | June 2024 | Abandon | 24 | 2 | 0 | No | No |
| 17850238 | METHOD FOR IMPROVING THE WITHSTANDING CAPABILITY OF THE CLADDING MATERIAL IN THE FAST NEUTRON IRRADIATION ENVIRONMENT | June 2022 | February 2025 | Abandon | 31 | 2 | 1 | No | No |
| 17848474 | Reactor Containment Vessel Vent System | June 2022 | March 2026 | Allow | 44 | 7 | 0 | Yes | No |
| 17848134 | DOUBLE NULL LIQUID METAL DIVERTERS | June 2022 | March 2026 | Abandon | 45 | 6 | 0 | Yes | No |
| 17843626 | IRRADIATION TARGETS FOR THE PRODUCTION OF RADIOISOTOPES AND DEBUNDLING TOOL FOR DISASSEMBLY THEREOF | June 2022 | May 2025 | Allow | 35 | 2 | 0 | Yes | No |
| 17807067 | USE OF SUB-CRITICAL NEUTRON MULTIPLICATION DRIVEN BY ELECTRONIC NEUTRON GENERATORS TO PRODUCE RADIOISOTOPES | June 2022 | October 2025 | Allow | 40 | 2 | 1 | Yes | No |
| 17836443 | PASSIVE CONTAINMENT COOLING SYSTEM FOR A NUCLEAR REACTOR | June 2022 | September 2022 | Allow | 4 | 0 | 0 | No | No |
| 17782529 | TRANSPIRATIONAL FIRST WALL COOLING | June 2022 | December 2025 | Abandon | 43 | 3 | 0 | No | No |
| 17781299 | A CONTAINMENT SYSTEM | May 2022 | February 2025 | Allow | 33 | 1 | 1 | Yes | No |
| 17746599 | STACKABLE NUCLEAR WASTE STORAGE SYSTEM | May 2022 | September 2024 | Allow | 28 | 2 | 1 | Yes | No |
| 17746773 | EXTERNAL REACTOR VESSEL COOLING SYSTEM FOR FLOATING NUCLEAR POWER PLANTS | May 2022 | April 2024 | Abandon | 23 | 2 | 0 | No | No |
| 17777028 | METHOD FOR EXTENDING LIFESPAN OF RHODIUM MEASURING DEVICES | May 2022 | November 2024 | Abandon | 30 | 1 | 0 | No | No |
| 17663307 | FUEL STRUCTURES COMPRISING URANIUM DIOXIDE AND URANIUM DIBORIDE, AND RELATED FUEL ROD ASSEMBLIES AND METHODS | May 2022 | December 2025 | Abandon | 43 | 4 | 1 | Yes | No |
| 17662159 | PLASMA CONFINEMENT APPARATUS FOR NUCLEAR FUSION | May 2022 | January 2025 | Abandon | 32 | 1 | 1 | No | No |
| 17736084 | Systems, Methods and Apparatus of a Fusion Nuclear Reactor | May 2022 | October 2023 | Abandon | 17 | 1 | 1 | No | No |
| 17728796 | INERTIAL ELECTROSTATIC CONFINEMENT FUSION FACILITY HAVING INNER ION SOURCE | April 2022 | April 2025 | Abandon | 36 | 2 | 1 | No | No |
| 17766122 | NUCLEAR FUEL ASSEMBLY BOTTOM END PART DEBRIS FILTER AND METHOD OF MANUFACTURING SUCH A DEBRIS FILTER | April 2022 | January 2026 | Allow | 46 | 3 | 1 | Yes | No |
| 17765771 | NUCLEAR REACTOR HEAD, NUCLEAR REACTOR COMPRISING SUCH A NUCLEAR REACTOR HEAD AND METHOD OF MAINTAINING A NUCLEAR REACTOR | March 2022 | August 2025 | Allow | 40 | 2 | 1 | Yes | No |
| 17699628 | NUCLEAR FUEL SINTERED PELLET HAVING EXCELLENT IMPACT RESISTANCE | March 2022 | March 2024 | Abandon | 24 | 2 | 0 | No | No |
| 17761954 | Nuclear Fuel Assembly with a Reinforcement Device | March 2022 | January 2026 | Allow | 46 | 3 | 1 | Yes | No |
| 17654920 | Direct Energy Converter for Axisymmetric Mirror Fusion Reactor | March 2022 | July 2024 | Allow | 29 | 3 | 1 | Yes | No |
| 17632394 | INTEGRATED IN-VESSEL NEUTRON SHIELD | February 2022 | November 2024 | Abandon | 34 | 4 | 1 | Yes | No |
| 17590958 | ENCRYPTION PROTECTED PLASMA COMPRESSION FUSION DEVICE | February 2022 | November 2023 | Abandon | 22 | 1 | 1 | No | No |
| 17567013 | LEAD-COOLED FAST REACTOR UTILIZING CONTROL DRUMS | December 2021 | April 2024 | Allow | 28 | 3 | 1 | Yes | No |
| 17560961 | TUBE ARRANGMENT AROUND A CORE | December 2021 | May 2024 | Abandon | 29 | 1 | 1 | No | No |
| 17557770 | FEEDWATER SPARGER NOZZLE REPAIR ASSEMBLY | December 2021 | January 2023 | Allow | 13 | 0 | 0 | Yes | No |
| 17619123 | SYSTEM FOR CONFINING AND COOLING MELT FROM THE CORE OF A NUCLEAR REACTOR | December 2021 | January 2025 | Abandon | 37 | 2 | 0 | No | No |
| 17619130 | Guide Assembly of the Corium Localizing and Cooling System of a Nuclear Reactor | December 2021 | January 2025 | Abandon | 37 | 2 | 0 | No | No |
| 17643628 | METHODS OF FORMING NUCLEAR FUEL RODS USING ADDITIVE MANUFACTURING AND USING REMOVABLE SACRIFICIAL MATERIAL | December 2021 | December 2023 | Abandon | 25 | 2 | 1 | No | No |
| 17614165 | PRESSURE-CONTAINING SILO FOR A PRESSURISED WATER REACTOR NUCLEAR POWER PLANT | November 2021 | October 2025 | Abandon | 46 | 4 | 1 | No | No |
| 17595614 | SYSTEM AND METHOD TO DETERMINE REACTIVITY | November 2021 | April 2025 | Abandon | 41 | 3 | 1 | Yes | No |
| 17524021 | MATERIALS FOR NUCLEAR FUSION | November 2021 | June 2024 | Abandon | 31 | 2 | 1 | No | No |
| 17454374 | SYSTEM AND METHOD FOR LOCAL RESISTIVITY MEASUREMENT AND CRITICAL HEAT FLUX CALCULATION FOR NUCLEAR REACTOR CLADDING TUBING | November 2021 | January 2025 | Allow | 39 | 3 | 1 | Yes | No |
| 17454364 | BOTTOM NOZZLE WITH PROTECTIVE INSERT | November 2021 | July 2023 | Allow | 20 | 1 | 1 | Yes | No |
| 17521955 | METHOD FOR DESIGN AND ADDITIVE MANUFACTURE OF FISSION REACTOR CORE STRUCTURE OF INVERTED REACTOR | November 2021 | January 2023 | Allow | 14 | 1 | 0 | Yes | No |
| 17522678 | COMPACT NUCLEAR REACTOR SYSTEM | November 2021 | August 2023 | Abandon | 22 | 0 | 1 | No | No |
| 17519089 | SYSTEMS AND METHODS FOR IMPROVED SUSTAINMENT OF A HIGH PERFORMANCE FRC PLASMA AT ELEVATED ENERGIES UTILIZING NEUTRAL BEAM INJECTORS WITH TUNABLE BEAM ENERGIES | November 2021 | February 2024 | Abandon | 27 | 3 | 0 | No | No |
| 17608136 | METHOD AND SYSTEM FOR GOVERNING A PRESSURIZED WATER NUCLEAR REACTOR | November 2021 | November 2024 | Allow | 36 | 2 | 0 | Yes | No |
| 17594819 | FUEL ASSEMBLY HAVING A SHARED FISSION GAS PLENUM | October 2021 | February 2026 | Allow | 52 | 4 | 1 | Yes | No |
| 17511761 | Nano-Engineered Materials for LENR | October 2021 | February 2024 | Abandon | 28 | 1 | 1 | No | No |
| 17480630 | BWR NUCLEAR FUEL ASSEMBLY COMPRISING AN INTERACTION DEVICE BETWEEN A LOWER TIE PLATE AND A FUEL CHANNEL | September 2021 | August 2024 | Allow | 35 | 3 | 1 | Yes | No |
| 17466109 | USE OF ISOLATION CONDENSER AND/OR FEEDWATER TO LIMIT CORE FLOW, CORE POWER, AND PRESSURE IN A BOILING WATER REACTOR | September 2021 | December 2023 | Allow | 27 | 7 | 0 | Yes | No |
| 17399894 | CONTROL DRUM ASSEMBLY AND ASSOCIATED NUCLEAR REACTORS AND METHODS | August 2021 | January 2024 | Abandon | 29 | 4 | 1 | No | No |
| 17399910 | NUCLEAR REACTOR SYSTEMS, CONTROL, ROD DRIVE SYSTEMS, AND RELATED METHODS | August 2021 | August 2025 | Abandon | 48 | 3 | 1 | No | No |
| 17399859 | CERMET FUEL ELEMENT AND FABRICATION AND APPLICATIONS THEREOF, INCLUDING IN THERMAL PROPULSION REACTOR | August 2021 | September 2023 | Allow | 26 | 1 | 1 | Yes | No |
| 17392599 | FLOW THROUGH LIQUID METAL COOLED MOLTEN SALT REACTORS | August 2021 | January 2024 | Allow | 30 | 2 | 1 | Yes | No |
| 17375885 | METHOD FOR INSTALLING EXTENSION TUBE IN A NUCLEAR REACTOR | July 2021 | December 2022 | Allow | 17 | 1 | 0 | No | No |
| 17422563 | A cladding tube for a fuel rod for nuclear reactors | July 2021 | June 2024 | Abandon | 35 | 3 | 1 | No | No |
| 17368576 | REFLECTORS FOR MOLTEN CHLORIDE FAST REACTORS | July 2021 | June 2023 | Allow | 23 | 1 | 1 | Yes | No |
| 17324904 | NUCLEAR FUEL ROD HAVING CLADDING WITH VARYING DIAMETER | May 2021 | March 2025 | Allow | 46 | 6 | 1 | Yes | No |
| 17294346 | Alpha-Contamination Tester of Fuel Elements | May 2021 | September 2022 | Abandon | 16 | 1 | 0 | No | No |
| 17222976 | Electric Heating for Nuclear Reactors | April 2021 | August 2025 | Abandon | 52 | 10 | 1 | Yes | No |
| 17278924 | METHOD FOR MONITORING NUCLEAR POWER PLANT IN TRANSIENT STATE BY USING SIGNAL CLASSIFICATION | March 2021 | September 2023 | Abandon | 30 | 2 | 0 | No | No |
| 17200028 | URANIUM-DIOXIDE PELLET FOR NUCLEAR FUEL HAVING IMPROVED NUCLEAR-FISSION-GAS ADSORPTION PROPERTY, AND METHOD OF MANUFACTURING SAME | March 2021 | August 2022 | Allow | 17 | 1 | 1 | Yes | No |
| 17192784 | CONTAINMENT STRUCTURE AND ARRANGEMENT FOR NUCLEAR REACTOR | March 2021 | July 2024 | Abandon | 40 | 6 | 0 | Yes | No |
| 17183493 | SYSTEM FOR CONTINUALLY MONITORING THE CONDITION OF NUCLEAR REACTOR INTERNALS | February 2021 | June 2023 | Allow | 27 | 1 | 1 | Yes | No |
| 17165224 | UNVENTILATED CASK FOR STORING NUCLEAR WASTE | February 2021 | September 2024 | Abandon | 43 | 2 | 1 | No | No |
| 17263669 | LANCE UNIT FOR A NUCLEAR REACTOR CORE | January 2021 | January 2025 | Abandon | 48 | 5 | 1 | Yes | No |
| 17262394 | METHOD OF REMOVING RADIOACTIVE STRUCTURE FROM A WALL IN A NUCLEAR POWER PLANT | January 2021 | August 2023 | Allow | 31 | 3 | 0 | Yes | No |
| 17259916 | FUEL ASSEMBLY HANDLING DEVICE AND HANDLING ASSEMBLY COMPRISING SUCH A DEVICE | January 2021 | January 2025 | Abandon | 48 | 6 | 1 | Yes | No |
| 17132102 | IMPACT AMELIORATION SYSTEM FOR NUCLEAR FUEL STORAGE | December 2020 | November 2022 | Allow | 23 | 1 | 1 | Yes | No |
| 15734711 | METHOD AND APPARATUS FOR INITIATING AND MAINTAINING NUCLEAR REACTIONS | December 2020 | October 2023 | Abandon | 35 | 3 | 1 | No | No |
| 17099198 | Nuclear Material and Methods | November 2020 | April 2023 | Abandon | 29 | 1 | 1 | No | No |
| 17097017 | 3D Printing of Additive Structures for Nuclear Fuels | November 2020 | July 2022 | Allow | 20 | 1 | 1 | Yes | No |
| 17054910 | HEAT TRANSFERRING DEVICE WITH A WORKING FLUID IN A CLOSED LOOP UTILIZING GRAVITY AND PRESSURE | November 2020 | March 2024 | Allow | 40 | 4 | 1 | Yes | No |
| 17088960 | METHOD OF RETROFITTING A SPENT NUCLEAR FUEL STORAGE SYSTEM | November 2020 | July 2022 | Allow | 20 | 0 | 1 | No | No |
| 17084403 | DEVICES, SYSTEMS, AND METHODS FOR CONFIGURING THE LAYOUT OF UNIT CELL OF A REACTOR CORE | October 2020 | March 2026 | Allow | 60 | 9 | 1 | Yes | No |
| 17082001 | CONTROL METHOD FOR VOLUME FRACTION OF MULTISTRUCTURAL ISOTROPIC FUEL PARTICLES IN FULLY CERAMIC MICROENCAPSULATED NUCLEAR FUELS, COMPOSITIONS FOR COATING AND SINTERED BODY OF THE SAME | October 2020 | February 2024 | Abandon | 39 | 2 | 1 | No | No |
| 17080241 | ENHANCED GRAPHITE NEUTRON REFLECTOR WITH BERYLLIUM OXIDE INCLUSIONS | October 2020 | July 2023 | Allow | 32 | 3 | 1 | Yes | No |
| 17079328 | MOLTEN METAL-FILLED SILICON CARBIDE FUEL CLADDING | October 2020 | January 2025 | Abandon | 51 | 4 | 1 | No | No |
| 17048222 | DISMANTLING AND DECONTAMINATION SYSTEM AND METHOD OF BIOPROTECTIVE CONCRETE OF PWR TYPE NUCLEAR POWER PLANT | October 2020 | May 2025 | Allow | 55 | 3 | 1 | Yes | No |
| 17072903 | NUCLEAR FUEL ELEMENTS INCLUDING PROTECTIVE STRUCTURES, AND RELATED METHOD OF FORMING A NUCLEAR FUEL ELEMENT | October 2020 | November 2022 | Allow | 25 | 2 | 1 | Yes | No |
This analysis examines appeal outcomes and the strategic value of filing appeals for examiner KIL, JINNEY.
With a 100.0% reversal rate, the PTAB has reversed the examiner's rejections more often than affirming them. This reversal rate is in the top 25% across the USPTO, indicating that appeals are more successful here than in most other areas.
Filing a Notice of Appeal can sometimes lead to allowance even before the appeal is fully briefed or decided by the PTAB. This occurs when the examiner or their supervisor reconsiders the rejection during the mandatory appeal conference (MPEP § 1207.01) after the appeal is filed.
In this dataset, 25.0% of applications that filed an appeal were subsequently allowed. This appeal filing benefit rate is below the USPTO average, suggesting that filing an appeal has limited effectiveness in prompting favorable reconsideration.
✓ Appeals to PTAB show good success rates. If you have a strong case on the merits, consider fully prosecuting the appeal to a Board decision.
⚠ Filing a Notice of Appeal shows limited benefit. Consider other strategies like interviews or amendments before appealing.
Examiner KIL, JINNEY works in Art Unit 3646 and has examined 145 patent applications in our dataset. With an allowance rate of 49.0%, this examiner allows applications at a lower rate than most examiners at the USPTO. Applications typically reach final disposition in approximately 35 months.
Examiner KIL, JINNEY's allowance rate of 49.0% places them in the 11% percentile among all USPTO examiners. This examiner is less likely to allow applications than most examiners at the USPTO.
On average, applications examined by KIL, JINNEY receive 2.59 office actions before reaching final disposition. This places the examiner in the 76% percentile for office actions issued. This examiner issues more office actions than most examiners, which may indicate thorough examination or difficulty in reaching agreement with applicants.
The median time to disposition (half-life) for applications examined by KIL, JINNEY is 35 months. This places the examiner in the 40% percentile for prosecution speed. Prosecution timelines are slightly slower than average with this examiner.
Conducting an examiner interview provides a +50.6% benefit to allowance rate for applications examined by KIL, JINNEY. This interview benefit is in the 93% percentile among all examiners. Recommendation: Interviews are highly effective with this examiner and should be strongly considered as a prosecution strategy. Per MPEP § 713.10, interviews are available at any time before the Notice of Allowance is mailed or jurisdiction transfers to the PTAB.
When applicants file an RCE with this examiner, 15.0% of applications are subsequently allowed. This success rate is in the 11% percentile among all examiners. Strategic Insight: RCEs show lower effectiveness with this examiner compared to others. Consider whether a continuation application might be more strategic, especially if you need to add new matter or significantly broaden claims.
This examiner enters after-final amendments leading to allowance in 17.9% of cases where such amendments are filed. This entry rate is in the 21% percentile among all examiners. Strategic Recommendation: This examiner rarely enters after-final amendments compared to other examiners. You should generally plan to file an RCE or appeal rather than relying on after-final amendment entry. Per MPEP § 714.12, primary examiners have discretion in entering after-final amendments, and this examiner exercises that discretion conservatively.
When applicants request a pre-appeal conference (PAC) with this examiner, 0.0% result in withdrawal of the rejection or reopening of prosecution. This success rate is in the 18% percentile among all examiners. Note: Pre-appeal conferences show limited success with this examiner compared to others. While still worth considering, be prepared to proceed with a full appeal brief if the PAC does not result in favorable action.
This examiner withdraws rejections or reopens prosecution in 50.0% of appeals filed. This is in the 19% percentile among all examiners. Strategic Insight: This examiner rarely withdraws rejections during the appeal process compared to other examiners. If you file an appeal, be prepared to fully prosecute it to a PTAB decision. Per MPEP § 1207, the examiner will prepare an Examiner's Answer maintaining the rejections.
When applicants file petitions regarding this examiner's actions, 70.0% are granted (fully or in part). This grant rate is in the 77% percentile among all examiners. Strategic Note: Petitions are frequently granted regarding this examiner's actions compared to other examiners. Per MPEP § 1002.02(c), various examiner actions are petitionable to the Technology Center Director, including prematureness of final rejection, refusal to enter amendments, and requirement for information. If you believe an examiner action is improper, consider filing a petition.
Examiner's Amendments: This examiner makes examiner's amendments in 0.0% of allowed cases (in the 36% percentile). This examiner makes examiner's amendments less often than average. You may need to make most claim amendments yourself.
Quayle Actions: This examiner issues Ex Parte Quayle actions in 2.8% of allowed cases (in the 73% percentile). This examiner issues Quayle actions more often than average when claims are allowable but formal matters remain (MPEP § 714.14).
Based on the statistical analysis of this examiner's prosecution patterns, here are tailored strategic recommendations:
Not Legal Advice: The information provided in this report is for informational purposes only and does not constitute legal advice. You should consult with a qualified patent attorney or agent for advice specific to your situation.
No Guarantees: We do not provide any guarantees as to the accuracy, completeness, or timeliness of the statistics presented above. Patent prosecution statistics are derived from publicly available USPTO data and are subject to data quality limitations, processing errors, and changes in USPTO practices over time.
Limitation of Liability: Under no circumstances will IronCrow AI be liable for any outcome, decision, or action resulting from your reliance on the statistics, analysis, or recommendations presented in this report. Past prosecution patterns do not guarantee future results.
Use at Your Own Risk: While we strive to provide accurate and useful prosecution statistics, you should independently verify any information that is material to your prosecution strategy and use your professional judgment in all patent prosecution matters.