Detailed information about the 100 most recent patent applications.
| Application Number | Title | Filing Date | Disposal Date | Disposition | Time (months) | Office Actions | Restrictions | Interview | Appeal |
|---|---|---|---|---|---|---|---|---|---|
| 19263899 | Hydro-Pneumatic Apparatus and Methods of Use | July 2025 | November 2025 | Allow | 4 | 1 | 0 | Yes | No |
| 19084706 | HYDRO-ELECTROLYSIS THERMAL ELECTRICITY GENERATION SYSTEM AND METHOD | March 2025 | June 2025 | Allow | 2 | 0 | 0 | No | No |
| 19022555 | ROOFTOP WIND TURBINE FLOW IMPROVEMENTS | January 2025 | March 2026 | Abandon | 14 | 1 | 0 | No | No |
| 18993748 | COMPRESSED AIR STORAGE CONTAINER AND COMPRESSED AIR STORAGE APPARATUS COMPRISING THE COMPRESSED AIR STORAGE CONTAINER | January 2025 | March 2026 | Allow | 14 | 0 | 0 | No | No |
| 18985443 | Energy Harvesting and Electrical Power Generation | December 2024 | March 2026 | Abandon | 15 | 1 | 0 | No | No |
| 18967644 | MEDIUM VOLTAGE INRUSH CURRENT REGULATION AND INTERCONNECTION CONTROL SYSTEM AND METHOD | December 2024 | July 2025 | Allow | 7 | 0 | 0 | No | No |
| 18958899 | WIND TURBINE WITH INTEGRATED BATTERY STORAGE | November 2024 | July 2025 | Allow | 8 | 0 | 0 | No | No |
| 18948700 | ULTRACAPACITOR PITCH ENERGY MODULE | November 2024 | May 2025 | Allow | 6 | 0 | 0 | No | No |
| 18938165 | CORE SYNCHRONIZATION FOR LINEAR GENERATORS | November 2024 | June 2025 | Allow | 7 | 0 | 0 | No | No |
| 18854718 | CONTROL UNIT AND METHOD FOR BELT SLIP DETECTION IN CONSTRUCTION EQUIPMENT | October 2024 | February 2026 | Allow | 17 | 0 | 0 | No | No |
| 18899422 | HYDRO-ELECTROLYSIS THERMAL ELECTRICITY GENERATION SYSTEM AND METHOD | September 2024 | April 2025 | Allow | 7 | 0 | 0 | No | No |
| 18851803 | STATE MONITORING DEVICE, ROTOR BLADE, AND WIND TURBINE COMPRISING SAME | September 2024 | August 2025 | Allow | 11 | 1 | 0 | No | No |
| 18852040 | WEARABLE HUMAN BODY UPPER LIMB MOTION ENERGY HARVESTER | September 2024 | November 2025 | Allow | 14 | 0 | 0 | No | No |
| 18882234 | HYDROELECTRIC POWER GENERATION INCLUDING ARTIFICIAL WATERWAY | September 2024 | December 2025 | Abandon | 15 | 1 | 0 | No | No |
| 18816901 | CASCADE ACTIVATION METHOD AND MECHATRONIC SYSTEM | August 2024 | November 2025 | Allow | 15 | 1 | 0 | No | No |
| 18815783 | TENSION TURBINE ASSEMBLY AND OPERATIONAL CONTROL SYSTEM | August 2024 | August 2025 | Allow | 12 | 1 | 0 | Yes | No |
| 18815683 | VORTEX STATION | August 2024 | August 2025 | Abandon | 12 | 1 | 0 | No | No |
| 18794246 | RENEWABLE HYBRID TURBINE SYSTEM WITH PIEZOELECTRIC AND SOLAR INTEGRATION | August 2024 | July 2025 | Allow | 11 | 3 | 0 | No | No |
| 18773932 | Water Treatment System Power Generation | July 2024 | May 2025 | Allow | 10 | 0 | 0 | No | No |
| 18765913 | Ocean Multitasking Generator | July 2024 | September 2024 | Allow | 2 | 0 | 0 | No | No |
| 18764696 | FLOATING POWER GENERATION SYSTEM | July 2024 | November 2024 | Allow | 4 | 1 | 0 | No | No |
| 18715916 | DEVICES, SYSTEMS, AND METHODS FOR REDUCING MAGNETIC PARTICLES IN A FLUID FLOW | June 2024 | October 2024 | Allow | 5 | 0 | 0 | No | No |
| 18712667 | SYSTEM FOR CONVERTING AND TRANSPORTING ELECTRICAL ENERGY FOR THE INTERNAL HYBRIDISATION OF AN AIRCRAFT TURBOMACHINE | May 2024 | May 2025 | Allow | 12 | 0 | 0 | No | No |
| 18665599 | METHOD AND SYSTEM FOR CALCULATING STABILITY MARGIN DOMAIN OF CONTROL PARAMETERS OF HYDRAULIC TURBINE REGULATING SYSTEM | May 2024 | August 2024 | Allow | 3 | 0 | 0 | No | No |
| 18709933 | METHOD OF ASSEMBLING AN OFFSHORE ELECTROLYZER ARRAY | May 2024 | October 2025 | Abandon | 18 | 1 | 0 | No | No |
| 18659132 | MODULAR ENVELOPE HYDRODYNAMIC ELECTRIFICATION SYSTEM | May 2024 | July 2025 | Abandon | 14 | 1 | 0 | No | No |
| 18707199 | A NACELLE FOR A WIND TURBINE | May 2024 | September 2025 | Allow | 16 | 1 | 0 | No | No |
| 18705723 | DEVICE AND METHOD FOR STARTING PUMPED STORAGE GROUP AND PUMPED STORAGE SYSTEM | April 2024 | April 2025 | Allow | 11 | 0 | 0 | No | No |
| 18703720 | APPARATUS FOR OPERATING SIMULTANEOUSLY AS DC (DIRECT CURRENT) MOTOR AND DC GENERATOR | April 2024 | May 2025 | Allow | 13 | 1 | 0 | No | No |
| 18643904 | FRACTURING SYSTEM | April 2024 | January 2025 | Allow | 9 | 0 | 0 | No | No |
| 18641664 | VERTIPORT INCLUDING WIND POWER GENERATION SYSTEM | April 2024 | September 2025 | Allow | 16 | 1 | 0 | No | No |
| 18629530 | HYDRAULIC TURBINE | April 2024 | February 2025 | Allow | 10 | 0 | 0 | No | No |
| 18628667 | HYDRO-ELECTROLYSIS THERMAL ELECTRICITY GENERATION SYSTEM AND METHOD | April 2024 | August 2024 | Allow | 5 | 1 | 0 | Yes | No |
| 18619868 | GENERATOR WITH INTEGRATED SHIPPING FIXTURE | March 2024 | March 2025 | Allow | 12 | 0 | 0 | No | No |
| 18695184 | GENERATOR | March 2024 | July 2025 | Allow | 15 | 1 | 0 | No | No |
| 18693271 | GENERATOR | March 2024 | February 2025 | Allow | 11 | 0 | 0 | No | No |
| 18692798 | REMOTE CONTROL GENERATOR | March 2024 | February 2026 | Allow | 23 | 2 | 0 | No | No |
| 18687380 | HYDROELECTRIC ENERGY SYSTEMS AND METHODS OF MANUFACTURING THE SAME | February 2024 | March 2025 | Allow | 13 | 0 | 0 | No | No |
| 18686582 | MOORING DEVICE AND METHOD | February 2024 | January 2026 | Abandon | 22 | 2 | 0 | No | No |
| 18585796 | AEROGENERATOR SYSTEM, HYBRID ENERGY GENERATING SYSTEM AND SYSTEM | February 2024 | March 2025 | Allow | 13 | 3 | 0 | Yes | No |
| 18682996 | MARINE SUSPENSION ELECTRIC ENERGY GENERATION DEVICE | February 2024 | July 2025 | Abandon | 17 | 1 | 0 | No | No |
| 18294284 | CONTROL METHOD AND CONTROL APPARATUS FOR VOLTAGE SOURCE-TYPE WIND TURBINE | February 2024 | November 2024 | Allow | 10 | 0 | 0 | No | No |
| 18425728 | AERONAUTICAL POWER SYSTEM | January 2024 | March 2026 | Allow | 26 | 1 | 0 | Yes | No |
| 18415872 | Reverse Horse Cart | January 2024 | February 2025 | Abandon | 13 | 1 | 0 | No | No |
| 18577930 | HEAT PUMP SYSTEM AND A METHOD OF OPERATING A HEAT PUMP SYSTEM | January 2024 | December 2024 | Allow | 11 | 1 | 0 | Yes | No |
| 18573792 | WIND TURBINE | December 2023 | June 2025 | Allow | 18 | 1 | 0 | No | No |
| 18569712 | WAVE ENERGY HARVESTER | December 2023 | July 2025 | Allow | 19 | 1 | 0 | No | No |
| 18530346 | TRACTOR TRAILER REFRIGERATION UNIT | December 2023 | September 2025 | Abandon | 21 | 1 | 0 | No | No |
| 18566441 | CIRCUIT CONNECTION DEVICE, ROTATING ELECTRIC MACHINE DEVICE, AND METHOD FOR MANUFACTURING CIRCUIT CONNECTION DEVICE | December 2023 | August 2025 | Allow | 21 | 0 | 0 | No | No |
| 18565419 | Kaplan-Type Turbine | November 2023 | November 2024 | Allow | 12 | 0 | 0 | No | No |
| 18519183 | High Density Horsepower Mobile Pump System | November 2023 | October 2024 | Allow | 10 | 0 | 0 | No | No |
| 18520184 | MEDIUM VOLTAGE INRUSH CURRENT REGULATION AND INTERCONNECTION CONTROL SYSTEM AND METHOD | November 2023 | October 2024 | Allow | 10 | 0 | 0 | No | No |
| 18512091 | COMPOSITE MATERIAL PERMANENT MAGNET SYNCHRONOUS MOTOR | November 2023 | February 2026 | Abandon | 27 | 1 | 0 | No | No |
| 18550911 | ENERGY GENERATING DEVICE | November 2023 | July 2025 | Allow | 22 | 1 | 0 | No | No |
| 18560335 | PREFORMED COIL FOR AN ELECTRIC MACHINE HAVING A PERFORATED INSULATING BODY AND METHOD OF MAKING SAME | November 2023 | July 2025 | Allow | 20 | 1 | 0 | Yes | No |
| 18504454 | METHOD FOR COMPENSATING ALTERNATING CURRENT CABLE LOSS | November 2023 | July 2025 | Allow | 20 | 0 | 0 | No | No |
| 18289474 | HEAT-TRANSFER-LIQUID-OPERATED TURBINE AND COMPRESSOR | November 2023 | September 2025 | Allow | 22 | 2 | 0 | Yes | No |
| 18558933 | METHOD FOR THE MAKING OF A STATOR FOR ELECTRIC MOTORS, AND RESPECTIVE STATOR FOR ELECTRIC MOTORS | November 2023 | July 2025 | Allow | 21 | 0 | 0 | No | No |
| 18288479 | COOLING DEVICE BASED ON GUIDANCE AND ISOLATION FOR ADSORPTION PERMANENT MAGNET GENERATORS OF GENERATOR SETS | October 2023 | January 2025 | Allow | 15 | 0 | 0 | No | No |
| 18556288 | COOLING OF AN ELECTRIC MOTOR | October 2023 | November 2025 | Allow | 25 | 1 | 0 | No | No |
| 18486946 | Frayed Energy Collectors | October 2023 | January 2026 | Abandon | 27 | 1 | 0 | No | No |
| 18285916 | A WAVE POWER SYSTEM | October 2023 | December 2025 | Allow | 27 | 3 | 0 | Yes | No |
| 18553262 | SAFETY SYSTEM FOR A WIND TURBINE SYSTEM INCLUDING HYDROGEN PRODUCTION | September 2023 | April 2025 | Allow | 18 | 1 | 0 | No | No |
| 18551420 | Power Collection System for Subsea Transfer of Power from Offshore Power Generation Units | September 2023 | November 2024 | Allow | 14 | 1 | 0 | Yes | No |
| 18244385 | WIND TURBINE MANAGEMENT SYSTEM FOR CONTROLLED ENERGY STORAGE | September 2023 | April 2025 | Allow | 19 | 1 | 0 | No | No |
| 18549655 | SELF-GENERATING AND VIBRATING FUNCTIONAL SHOE EQUIPPED WITH GPS DEVICE | September 2023 | March 2025 | Allow | 18 | 1 | 0 | No | No |
| 18238748 | VORTEX STATION | August 2023 | April 2024 | Allow | 7 | 0 | 0 | No | No |
| 18366048 | Energy Harvesting and Electrical Power Generation | August 2023 | September 2024 | Allow | 13 | 1 | 0 | Yes | No |
| 18364592 | DETERMINATION OF A STATE OF A WIND TURBINE BLADE | August 2023 | March 2025 | Allow | 19 | 1 | 0 | No | No |
| 18226939 | WIND TURBINE WITH INTEGRATED BATTERY STORAGE | July 2023 | July 2024 | Allow | 12 | 1 | 0 | No | No |
| 18274112 | ROTOR BODY FOR A PERMANENT MAGNET MACHINE | July 2023 | March 2025 | Allow | 19 | 1 | 0 | No | No |
| 18353192 | ELECTRIC POWER SYSTEM FOR A VEHICLE | July 2023 | November 2024 | Allow | 16 | 0 | 0 | No | No |
| 18272751 | DYNAMOELECTRIC MACHINE HAVING COOLING OF THE SLIP RING SYSTEM | July 2023 | October 2024 | Allow | 15 | 0 | 0 | No | No |
| 18271768 | CONTROLLING OPERATION IN DIFFERENT ZONES OF A WIND TURBINE | July 2023 | July 2025 | Allow | 24 | 2 | 0 | Yes | No |
| 18218345 | AIRGAP CONTROL IN AN ELECTRIC GENERATOR FOR A WIND TURBINE | July 2023 | April 2025 | Allow | 21 | 2 | 0 | Yes | No |
| 18345160 | HYBRID SOLAR WIND POWER GENERATION DEVICE | June 2023 | September 2024 | Allow | 15 | 0 | 0 | No | No |
| 18259350 | PARAMETER IDENTIFICATION METHOD AND APPARATUS FOR WIND TURBINE GENERATOR | June 2023 | September 2024 | Allow | 15 | 0 | 0 | No | No |
| 18267784 | GENERATOR SYSTEM BASED ON HIGH-FREQUENCY ISOLATED MATRIX CONVERTER AND REGULATION METHOD THEREOF | June 2023 | August 2024 | Allow | 14 | 0 | 0 | No | No |
| 18328205 | METHOD FOR CONTROLLING A RAMP RATE OF A WIND PARK WITH A PLURALITY OF WIND TURBINES AND WIND PARK | June 2023 | June 2024 | Allow | 12 | 0 | 0 | No | No |
| 18200290 | POWER GENERATION DEVICE | May 2023 | November 2024 | Allow | 18 | 1 | 0 | No | No |
| 18199098 | ENERGY STORAGE SYSTEM | May 2023 | February 2025 | Allow | 21 | 1 | 0 | No | No |
| 18252874 | CONTROLLING A POWER PLANT COMPRISING WIND TURBINES DURING GRID FREQUENCY DEVIATION | May 2023 | September 2024 | Allow | 16 | 0 | 0 | No | No |
| 18196035 | ENCAPSULATED MAGNETO HYDRODYNAMIC DRIVE | May 2023 | April 2024 | Allow | 11 | 0 | 0 | No | No |
| 18313451 | HARNESSING ARTESIAN AQUIFER ENERGY MODULATING PIEZOELECTRIC SPRINGS | May 2023 | December 2024 | Allow | 19 | 1 | 0 | Yes | No |
| 18035680 | SYSTEMS AND METHODS FOR SMOOTHING AND STORAGE OF INTERMITTENT RENEWABLE POWER | May 2023 | February 2025 | Allow | 22 | 2 | 0 | No | No |
| 18311042 | FRACTURING APPARATUS AND CONTROL METHOD THEREOF, FRACTURING SYSTEM | May 2023 | September 2024 | Allow | 17 | 0 | 0 | No | No |
| 18034760 | CORE SYNCHRONIZATION FOR LINEAR GENERATORS | May 2023 | August 2024 | Allow | 15 | 0 | 0 | No | No |
| 18307837 | Unmanned Aerial Vehicle's Hybrid Drive Assembly | April 2023 | July 2024 | Allow | 15 | 0 | 0 | No | No |
| 18139171 | High Density Mobile Power Unit and System | April 2023 | July 2024 | Allow | 15 | 0 | 0 | No | No |
| 18305623 | WAVE TURBINE | April 2023 | June 2024 | Abandon | 14 | 2 | 0 | No | No |
| 18249533 | POWER GENERATION DEVICE AND METHOD BASED ON TIME-VARYING MAGDUCTANCE PRINCIPLE | April 2023 | August 2025 | Allow | 28 | 0 | 0 | No | No |
| 18031177 | WIND TURBINE AUXILIARY POWER SYSTEM | April 2023 | June 2024 | Allow | 15 | 0 | 0 | No | No |
| 18030290 | FLOATING INDEPENDENT X-SHAPED SELF-ALIGNING MULTIPLE HYDRO-GENERATOR WITH MAXIMUM THRUST SURFACE | April 2023 | July 2025 | Abandon | 28 | 2 | 0 | No | No |
| 18029845 | ELECTRIC MACHINE AND WIND TURBINE | March 2023 | June 2024 | Allow | 15 | 0 | 0 | No | No |
| 18190672 | SYSTEM AND METHOD FOR AN IN-CONDUIT HYDROTURBINE | March 2023 | February 2025 | Allow | 22 | 2 | 0 | No | No |
| 18126504 | Reverse Horse Cart | March 2023 | January 2024 | Abandon | 10 | 1 | 0 | No | No |
| 18184961 | ULTRACAPACITOR PITCH ENERGY MODULE | March 2023 | August 2024 | Allow | 17 | 1 | 0 | No | No |
| 18121174 | MODULAR ENVELOPE HYDRODYNAMIC ELECTRIFICATION SYSTEM | March 2023 | January 2024 | Allow | 10 | 1 | 0 | No | No |
| 18245068 | DEVICE FOR GENERATING ELECTRIC CURRENT IN A FLUID FLOW CIRCUIT | March 2023 | December 2024 | Allow | 21 | 2 | 0 | No | No |
| 18043397 | PIEZOELECTRIC SENSOR AND DRIVING METHOD THEREFOR, AND HAPTIC FEEDBACK APPARATUS | February 2023 | March 2026 | Allow | 36 | 0 | 0 | No | No |
This analysis examines appeal outcomes and the strategic value of filing appeals for examiner CUEVAS, PEDRO J.
With a 0.0% reversal rate, the PTAB affirms the examiner's rejections in the vast majority of cases. This reversal rate is in the bottom 25% across the USPTO, indicating that appeals face significant challenges here.
Filing a Notice of Appeal can sometimes lead to allowance even before the appeal is fully briefed or decided by the PTAB. This occurs when the examiner or their supervisor reconsiders the rejection during the mandatory appeal conference (MPEP § 1207.01) after the appeal is filed.
In this dataset, 10.0% of applications that filed an appeal were subsequently allowed. This appeal filing benefit rate is in the bottom 25% across the USPTO, indicating that filing appeals is less effective here than in most other areas.
⚠ Appeals to PTAB face challenges. Ensure your case has strong merit before committing to full Board review.
⚠ Filing a Notice of Appeal shows limited benefit. Consider other strategies like interviews or amendments before appealing.
Examiner CUEVAS, PEDRO J works in Art Unit 2896 and has examined 221 patent applications in our dataset. With an allowance rate of 83.7%, this examiner has an above-average tendency to allow applications. Applications typically reach final disposition in approximately 22 months.
Examiner CUEVAS, PEDRO J's allowance rate of 83.7% places them in the 58% percentile among all USPTO examiners. This examiner has an above-average tendency to allow applications.
On average, applications examined by CUEVAS, PEDRO J receive 1.14 office actions before reaching final disposition. This places the examiner in the 13% percentile for office actions issued. This examiner issues significantly fewer office actions than most examiners.
The median time to disposition (half-life) for applications examined by CUEVAS, PEDRO J is 22 months. This places the examiner in the 89% percentile for prosecution speed. Applications move through prosecution relatively quickly with this examiner.
Conducting an examiner interview provides a -2.6% benefit to allowance rate for applications examined by CUEVAS, PEDRO J. This interview benefit is in the 8% percentile among all examiners. Note: Interviews show limited statistical benefit with this examiner compared to others, though they may still be valuable for clarifying issues.
When applicants file an RCE with this examiner, 24.7% of applications are subsequently allowed. This success rate is in the 37% percentile among all examiners. Strategic Insight: RCEs show below-average effectiveness with this examiner. Carefully evaluate whether an RCE or continuation is the better strategy.
This examiner enters after-final amendments leading to allowance in 33.9% of cases where such amendments are filed. This entry rate is in the 51% percentile among all examiners. Strategic Recommendation: This examiner shows above-average receptiveness to after-final amendments. If your amendments clearly overcome the rejections and do not raise new issues, consider filing after-final amendments before resorting to an RCE.
When applicants request a pre-appeal conference (PAC) with this examiner, 0.0% result in withdrawal of the rejection or reopening of prosecution. This success rate is in the 15% percentile among all examiners. Note: Pre-appeal conferences show limited success with this examiner compared to others. While still worth considering, be prepared to proceed with a full appeal brief if the PAC does not result in favorable action.
This examiner withdraws rejections or reopens prosecution in 33.3% of appeals filed. This is in the 5% percentile among all examiners. Strategic Insight: This examiner rarely withdraws rejections during the appeal process compared to other examiners. If you file an appeal, be prepared to fully prosecute it to a PTAB decision. Per MPEP § 1207, the examiner will prepare an Examiner's Answer maintaining the rejections.
When applicants file petitions regarding this examiner's actions, 60.4% are granted (fully or in part). This grant rate is in the 64% percentile among all examiners. Strategic Note: Petitions show above-average success regarding this examiner's actions. Petitionable matters include restriction requirements (MPEP § 1002.02(c)(2)) and various procedural issues.
Examiner's Amendments: This examiner makes examiner's amendments in 0.0% of allowed cases (in the 28% percentile). This examiner makes examiner's amendments less often than average. You may need to make most claim amendments yourself.
Quayle Actions: This examiner issues Ex Parte Quayle actions in 1.1% of allowed cases (in the 62% percentile). This examiner issues Quayle actions more often than average when claims are allowable but formal matters remain (MPEP § 714.14).
Based on the statistical analysis of this examiner's prosecution patterns, here are tailored strategic recommendations:
Not Legal Advice: The information provided in this report is for informational purposes only and does not constitute legal advice. You should consult with a qualified patent attorney or agent for advice specific to your situation.
No Guarantees: We do not provide any guarantees as to the accuracy, completeness, or timeliness of the statistics presented above. Patent prosecution statistics are derived from publicly available USPTO data and are subject to data quality limitations, processing errors, and changes in USPTO practices over time.
Limitation of Liability: Under no circumstances will IronCrow AI be liable for any outcome, decision, or action resulting from your reliance on the statistics, analysis, or recommendations presented in this report. Past prosecution patterns do not guarantee future results.
Use at Your Own Risk: While we strive to provide accurate and useful prosecution statistics, you should independently verify any information that is material to your prosecution strategy and use your professional judgment in all patent prosecution matters.