Detailed information about the 100 most recent patent applications.
| Application Number | Title | Filing Date | Disposal Date | Disposition | Time (months) | Office Actions | Restrictions | Interview | Appeal |
|---|---|---|---|---|---|---|---|---|---|
| 18442059 | BOLT ON POWER | February 2024 | April 2024 | Allow | 2 | 0 | 0 | Yes | No |
| 18577130 | COOLING DEVICE | January 2024 | September 2024 | Allow | 8 | 1 | 0 | Yes | No |
| 18463798 | Phase Balancing Strap for Electrical Systems | September 2023 | June 2025 | Allow | 21 | 0 | 0 | Yes | No |
| 18458356 | LOAD MANAGEMENT FOR AN ELECTRICAL PANEL | August 2023 | June 2025 | Allow | 21 | 1 | 0 | Yes | No |
| 18228421 | SCALABLE AND PORTABLE AC/DC SUBSTATION | July 2023 | June 2025 | Allow | 22 | 0 | 0 | Yes | No |
| 18360134 | FAULT MANAGED POWER IN A POWER DISTRIBUTION UNIT | July 2023 | June 2025 | Allow | 23 | 0 | 0 | Yes | No |
| 18224540 | DISTRIBUTION BOARD BUS BAR MODULE HAVING LEAKAGE CURRENT LIMITING FUNCTION | July 2023 | April 2025 | Allow | 21 | 0 | 0 | Yes | No |
| 18261922 | A COMPACT CONTACTOR MODULE FOR INSTALLATION IN A POWER POST | July 2023 | June 2025 | Allow | 23 | 0 | 0 | No | No |
| 18272145 | BOGIE APPARATUS AND CIRCUIT BREAKER COMPRISING SAME | July 2023 | March 2025 | Allow | 20 | 0 | 0 | Yes | No |
| 18337473 | MEDIUM-VOLTAGE SWITCHGEAR SYSTEM HAVING SINGLE PHASE BREAKER CONTROL | June 2023 | April 2024 | Allow | 10 | 0 | 0 | Yes | No |
| 18337085 | SWITCHGEAR SYSTEM HAVING CHAIN DRIVEN CIRCUIT BREAKER AND ASSOCIATED METHODS | June 2023 | March 2024 | Allow | 9 | 0 | 0 | Yes | No |
| 18267623 | EXPLOSION-PROOF HOUSING COMPRISING REMOVABLE CENTRAL STRUT | June 2023 | May 2025 | Allow | 23 | 1 | 0 | Yes | No |
| 18210343 | TRANSFER SWITCH APPARATUS | June 2023 | January 2025 | Allow | 19 | 0 | 0 | Yes | No |
| 18210626 | HEAT-ACTIVATED PUMP WITH INTEGRATED EVAPORATOR FOR ELECTRONIC CHIP HEAT REMOVAL | June 2023 | August 2024 | Allow | 14 | 0 | 0 | Yes | No |
| 18335203 | SWITCHGEAR SYSTEM HAVING TRANSLATABLE AND ROTATABLE TRUCK AND ASSOCIATED METHOD | June 2023 | March 2024 | Allow | 9 | 0 | 0 | Yes | No |
| 18334398 | TWO-PHASE IMMERSION COOLING SYSTEM, WORKING FLUID RECOVERY DEVICE AND METHOD | June 2023 | April 2025 | Allow | 22 | 0 | 0 | Yes | No |
| 18209998 | LIQUID COOLING PLATE ASSEMBLY AND SERVER | June 2023 | March 2025 | Allow | 21 | 0 | 0 | Yes | No |
| 18209694 | LIQUID COOLING PLATE AND SERVER | June 2023 | April 2025 | Allow | 22 | 0 | 0 | Yes | No |
| 18208783 | MANIFOLD, RACK AND DATA CENTER COOLING SYSTEM | June 2023 | May 2025 | Allow | 23 | 0 | 1 | Yes | No |
| 18142020 | SEPARATED HEAT DISSIPATING DEVICE HAVING SUSPENSION MECHANISM AND OPTICAL MODULE SYSTEM THEREOF | May 2023 | March 2025 | Allow | 22 | 0 | 0 | Yes | No |
| 18251024 | WIND PRESSURE TYPE SHUTTER FOR OUTDOOR SWITCHBOARD | April 2023 | December 2024 | Allow | 19 | 0 | 0 | Yes | No |
| 18305290 | System and Method for Relocating Branch Circuit Electrical Cables from an Existing Electrical Enclosure | April 2023 | December 2024 | Allow | 20 | 0 | 0 | Yes | No |
| 18126943 | SCALABLE POWER TAP OFF SYSTEM | March 2023 | December 2024 | Allow | 21 | 0 | 0 | Yes | No |
| 18123388 | COOLING DEVICE | March 2023 | February 2025 | Allow | 23 | 0 | 0 | Yes | No |
| 18184934 | HEATSINK FOR CO-PACKAGED OPTICAL SWITCH RACK PACKAGE | March 2023 | December 2024 | Allow | 21 | 0 | 0 | Yes | No |
| 18178654 | Electrical Panel Board | March 2023 | December 2024 | Allow | 21 | 0 | 0 | Yes | No |
| 18175685 | Cooling System for a Medium Voltage Switchgear | February 2023 | May 2025 | Abandon | 27 | 0 | 1 | Yes | No |
| 18109389 | OVERSIZED SWITCHGEAR TRAILER FOR ELECTRIC HYDRAULIC FRACTURING | February 2023 | January 2025 | Allow | 24 | 0 | 1 | Yes | No |
| 18102890 | Robot Controller And Robot System | January 2023 | May 2025 | Allow | 28 | 1 | 0 | Yes | No |
| 18102962 | Robot Controller And Robot System | January 2023 | May 2025 | Allow | 28 | 1 | 0 | Yes | No |
| 18095921 | MOBILE HIGH PERFORMANCE COMPUTING PLATFORM FOR CRYPTOCURRENCY MINING | January 2023 | April 2024 | Allow | 15 | 0 | 0 | Yes | No |
| 18150348 | CONTROL-CABINET SYSTEM HAVING A BASE MODULE AND A FUNCTIONAL MODULE, BASE MODULE AND FUNCTIONAL MODULE | January 2023 | November 2024 | Allow | 23 | 0 | 0 | Yes | No |
| 18149990 | HEAT SINK WITH TURBULENT STRUCTURES | January 2023 | December 2024 | Allow | 23 | 0 | 0 | Yes | No |
| 18091075 | COMMON RAIL COOLING PLATE | December 2022 | May 2025 | Allow | 29 | 2 | 0 | Yes | No |
| 18088911 | SYSTEM FOR BLIND MATE HYDRAULIC CONNECTIONS | December 2022 | October 2024 | Allow | 22 | 0 | 0 | Yes | No |
| 18086489 | SERVICE SWITCH FOR UTILITY METER | December 2022 | March 2025 | Allow | 27 | 2 | 0 | Yes | No |
| 18063882 | POWER CONVERSION APPARATUS, AND METHOD OF MANUFACTURING POWER CONVERSION APPARATUS | December 2022 | September 2024 | Allow | 21 | 1 | 0 | Yes | No |
| 18057829 | REVERSIBLE FAN ASSEMBLY WITH PRESS FIT STABILIZATION | November 2022 | November 2024 | Allow | 24 | 1 | 0 | Yes | No |
| 17925933 | ELECTRONIC DEVICE | November 2022 | March 2025 | Abandon | 28 | 0 | 1 | No | No |
| 17987963 | ELECTRIC VEHICLE AND POWER CONVERTER THEREOF | November 2022 | September 2024 | Allow | 22 | 1 | 0 | No | No |
| 17987199 | Cooling Apparatus for Power Module | November 2022 | July 2024 | Allow | 20 | 0 | 0 | Yes | No |
| 17984279 | HEAT DISSIPATION DEVICE OF ELECTRONIC EQUIPMENT | November 2022 | August 2024 | Allow | 21 | 0 | 0 | Yes | No |
| 17984415 | SWAPPABLE AIRFLOW CASSETTE FOR POWER SUPPLY UNITS | November 2022 | January 2025 | Allow | 27 | 2 | 0 | Yes | No |
| 17980351 | ENHANCED FAN INTEGRATION IN DATA STORAGE SYSTEMS | November 2022 | July 2024 | Allow | 20 | 0 | 0 | Yes | No |
| 17967940 | AIR INSULATED SWITCH WITH VERY COMPACT GAP LENGTH | October 2022 | March 2024 | Allow | 16 | 0 | 0 | Yes | No |
| 17967742 | MAINTENANCE GROUNDING DEVICE IN MOTOR CONTROL CENTER WITH INTEGRATED INTERLOCK SYSTEM | October 2022 | March 2024 | Allow | 17 | 1 | 0 | Yes | No |
| 17965229 | A Medium Voltage Switchgear or Control Gear | October 2022 | October 2024 | Allow | 24 | 0 | 1 | Yes | No |
| 17963876 | SUPPORT BRACKET FOR TRANSFORMER SWITCH UTILIZING EXISTING TRANSFORMER CONNECTION POINTS | October 2022 | March 2024 | Allow | 17 | 0 | 0 | Yes | No |
| 17995668 | UNINTERRUPTIBLE POWER SUPPLY DEVICE | October 2022 | June 2024 | Allow | 20 | 0 | 0 | Yes | No |
| 17916715 | POWER DEVICE FOR CONTINUOUSLY DETECTING ENTRY AND EXIT POSITIONS | October 2022 | April 2024 | Allow | 18 | 0 | 0 | Yes | No |
| 17957066 | Cooling Apparatus for a Medium Voltage or High Voltage Switchgear | September 2022 | December 2024 | Abandon | 27 | 0 | 1 | No | No |
| 17956813 | COMPONENT COOLER WITH SPRING MECHANISM | September 2022 | February 2025 | Allow | 28 | 2 | 0 | Yes | No |
| 17956799 | COMPONENT COOLER FOR A COMPUTING DEVICE | September 2022 | February 2025 | Allow | 29 | 2 | 0 | Yes | No |
| 17954146 | OPTICAL TRANSCEIVER INCLUDING HEAT DISSIPATION COMPONENTS THERMALLY COUPLED TO OPPOSITE SIDES OF HOUSING | September 2022 | February 2025 | Allow | 28 | 2 | 0 | Yes | No |
| 17946962 | DOUBLE-SIDED COOLING APPARATUS FOR POWER MODULE | September 2022 | April 2025 | Allow | 31 | 2 | 0 | Yes | No |
| 17944638 | DEVICE FOR LIQUID COOLING OF NETWORK INTERFACE DEVICES | September 2022 | May 2025 | Abandon | 32 | 2 | 0 | No | No |
| 17822274 | HEAT SINK FOR A SOLID-STATE CIRCUIT BREAKER IN AN ELECTRICAL PANEL | August 2022 | October 2024 | Allow | 25 | 1 | 0 | Yes | No |
| 17904959 | GAS-INSULATED SWITCHGEAR | August 2022 | May 2024 | Allow | 21 | 1 | 0 | Yes | No |
| 17821501 | CIRCUIT BREAKER WITH INDICATOR OF BREAKER POSITION | August 2022 | August 2023 | Allow | 12 | 0 | 0 | Yes | No |
| 17798343 | Method For Installing A Switching Module In An Electrical Cabinet, Corresponding Installation Kit And Switching Module | August 2022 | February 2023 | Allow | 6 | 0 | 0 | Yes | No |
| 17879578 | RACK MOUNTING ADAPTER WITH AIRFLOW MANAGEMENT | August 2022 | March 2025 | Abandon | 32 | 2 | 0 | Yes | No |
| 17795750 | AUTOMATION OF THE MANUFACTURING OF ELECTRICAL PANELS THROUGH AN IDENTIFIED PROCESS | July 2022 | March 2025 | Abandon | 32 | 2 | 1 | No | No |
| 17812855 | LOW-NOISE HEAT EXCHANGER | July 2022 | October 2024 | Allow | 27 | 2 | 0 | Yes | No |
| 17858999 | COMPUTER SERVER HEAT REGULATION UTILIZING INTEGRATED PRECISION AIR FLOW | July 2022 | December 2024 | Abandon | 29 | 1 | 0 | Yes | No |
| 17848740 | Power Distribution Module and Communication Power Supply System | June 2022 | May 2024 | Allow | 23 | 0 | 0 | Yes | No |
| 17788241 | Compact Electric Switching Substation into a Lattice Tower for Connection of Active and Passive Users to a High-Voltage Electric Grid and Use of Said Substation for Connecting an Electric Vehicle Charging Station to a High-Voltage Electric Grid | June 2022 | December 2023 | Allow | 18 | 0 | 0 | Yes | No |
| 17843739 | EXPANDER KIT FOR INSTALLING SMALL FRAME CIRCUIT BREAKERS IN ELECTRICAL DISTRIBUTION DEVICES DESIGNED FOR LARGE FRAME CIRCUIT BREAKERS | June 2022 | June 2024 | Allow | 24 | 1 | 0 | Yes | No |
| 17807488 | SWITCHGEAR DEVICE WITH GROUNDING DEVICE AND RELATED METHODS | June 2022 | August 2023 | Allow | 14 | 0 | 0 | Yes | No |
| 17787194 | POWER CONVERTER SYSTEM | June 2022 | November 2024 | Allow | 29 | 1 | 1 | Yes | No |
| 17756943 | SWITCHBOARD HAVING ROTATING SHUTTER STRUCTURE | June 2022 | July 2023 | Allow | 14 | 0 | 0 | Yes | No |
| 17830969 | ISOLATED LOAD ELECTRICAL DISTRIBUTION ENCLOSURE | June 2022 | September 2024 | Allow | 28 | 1 | 1 | Yes | No |
| 17825200 | RAILWAY VEHICLE AND STORAGE BATTERY CIRCUIT BREAKER BOX THEREOF | May 2022 | July 2024 | Allow | 26 | 0 | 0 | Yes | No |
| 17746571 | Accelerated Cooling in Storage Devices | May 2022 | March 2024 | Allow | 22 | 0 | 0 | Yes | No |
| 17745475 | SCALABLE THERMAL RIDE-THROUGH FOR IMMERSION-COOLED SERVER SYSTEMS | May 2022 | February 2024 | Abandon | 21 | 1 | 0 | No | No |
| 17775338 | PLANT MODULE, PLANT INCLUDING THE SAME, AND OPERATION METHOD OF PLANT | May 2022 | May 2024 | Allow | 24 | 1 | 0 | Yes | No |
| 17738905 | HOUSING COMPRISING A COMPOSITE WALL INTEGRATING AT LEAST ONE COOLING CONDUIT | May 2022 | September 2024 | Allow | 28 | 1 | 1 | Yes | No |
| 17774173 | ELECTRICAL DEVICE, IN PARTICULAR INVERTER OR CONVERTER | May 2022 | April 2025 | Allow | 35 | 4 | 0 | Yes | No |
| 17726281 | SWITCH ASSEMBLY FOR MOUNTING ON A MOUNTING RAIL | April 2022 | January 2025 | Abandon | 33 | 4 | 0 | Yes | No |
| 17659766 | SOLID STATE DRIVE APPARATUS AND DATA STORAGE APPARATUS INCLUDING THE SAME | April 2022 | June 2023 | Allow | 14 | 0 | 0 | Yes | No |
| 17722818 | INTERPOSER ASSEMBLY AND ELECTRONIC COMPONENT | April 2022 | August 2024 | Abandon | 28 | 1 | 0 | Yes | No |
| 17421423 | CONTROLER AND MODULAR CONTROL SYSTEM OF AN INDUSTRIAL AUTOMATION SYSTEM | April 2022 | January 2024 | Allow | 31 | 0 | 0 | Yes | No |
| 17768523 | TOWER, PARTICULARLY FOR A HIGH-VOLTAGE OVERHEAD ELECTRIC TRANSMISSION LINE, EQUIPPED WITH SWITCHGEAR UNIT AND RELATED PROTECTION, COMMAND AND CONTROL SYSTEM | April 2022 | April 2024 | Allow | 24 | 1 | 0 | Yes | No |
| 17767683 | Thermal-Control System Of A Mesh Network Device and Associated Mesh Network Devices | April 2022 | January 2024 | Allow | 22 | 0 | 0 | Yes | No |
| 17710259 | MODULAR SWITCHGEAR AND METHOD OF ASSEMBLING THE SAME | March 2022 | October 2023 | Allow | 19 | 0 | 1 | Yes | No |
| 17704996 | WIRELESS CHARGING BASE | March 2022 | February 2024 | Allow | 23 | 0 | 1 | Yes | No |
| 17702283 | STAND HAVING FANS FOR LAPTOP | March 2022 | June 2024 | Abandon | 27 | 1 | 0 | Yes | No |
| 17701875 | EMBEDDED AND IMMERSED HEAT PIPES IN AUTOMATED DRIVING SYSTEM COMPUTERS | March 2022 | May 2023 | Allow | 14 | 0 | 0 | Yes | No |
| 17702306 | FLUID COOLING SYSTEM | March 2022 | May 2023 | Allow | 14 | 3 | 0 | Yes | No |
| 17700678 | SET OF EXTERNAL CONNECTION MODULES FOR ELECTRICAL CONNECTION ENCLOSURE, AND ELECTRICAL CONNECTION ENCLOSURE COMPRISING AT LEAST ONE SUCH EXTERNAL CONNECTION MODULE | March 2022 | August 2023 | Allow | 17 | 1 | 0 | Yes | No |
| 17700850 | CONTACTLESS DEVICE AND CHIP THERMAL MANAGEMENT PLATE | March 2022 | December 2023 | Allow | 21 | 0 | 0 | Yes | No |
| 17700960 | HIGH POWER DENSITY CHIPS BASED TWO-PHASE LOOP RECIRCULATION | March 2022 | November 2023 | Allow | 19 | 1 | 0 | Yes | No |
| 17701213 | COOLING APPARATUS AND SEMICONDUCTOR APPARATUS WITH COOLING APPARATUS | March 2022 | August 2024 | Allow | 29 | 2 | 0 | Yes | No |
| 17700148 | TWO-PHASE SYSTEM IN SERVER CLUSTER | March 2022 | May 2024 | Allow | 25 | 1 | 0 | Yes | No |
| 17699575 | FUNCTIONAL UNIT FOR ELECTRICAL CONNECTION ENCLOSURE, AND ELECTRICAL CONNECTION ENCLOSURE COMPRISING SUCH A FUNCTIONAL UNIT | March 2022 | November 2024 | Allow | 32 | 3 | 0 | Yes | No |
| 17762249 | HEAT SINK AND SINK MANUFACTURING METHOD | March 2022 | April 2024 | Allow | 25 | 1 | 0 | Yes | No |
| 17760581 | ELECTRONIC CONTROL DEVICE | March 2022 | September 2024 | Allow | 30 | 2 | 0 | Yes | No |
| 17760729 | POWER CONVERSION DEVICE AND MOTOR-INTEGRATED POWER CONVERSION DEVICE | March 2022 | December 2023 | Allow | 21 | 0 | 0 | No | No |
| 17693548 | SERVER AND HEAT EXCHANGER | March 2022 | June 2024 | Abandon | 27 | 1 | 0 | No | No |
| 17654115 | IMMERSION LIQUID COOLING TANK ASSEMBLY WITH FAN | March 2022 | March 2024 | Allow | 24 | 1 | 0 | Yes | No |
| 17685205 | FLUID CONNECTION APPARATUS FOR SERVERS AND RACKS | March 2022 | March 2024 | Allow | 24 | 1 | 0 | Yes | No |
This analysis examines appeal outcomes and the strategic value of filing appeals for examiner HOFFBERG, ROBERT JOSEPH.
With a 33.3% reversal rate, the PTAB reverses the examiner's rejections in a meaningful percentage of cases. This reversal rate is above the USPTO average, indicating that appeals have better success here than typical.
Filing a Notice of Appeal can sometimes lead to allowance even before the appeal is fully briefed or decided by the PTAB. This occurs when the examiner or their supervisor reconsiders the rejection during the mandatory appeal conference (MPEP § 1207.01) after the appeal is filed.
In this dataset, 24.1% of applications that filed an appeal were subsequently allowed. This appeal filing benefit rate is below the USPTO average, suggesting that filing an appeal has limited effectiveness in prompting favorable reconsideration.
✓ Appeals to PTAB show good success rates. If you have a strong case on the merits, consider fully prosecuting the appeal to a Board decision.
⚠ Filing a Notice of Appeal shows limited benefit. Consider other strategies like interviews or amendments before appealing.
Examiner HOFFBERG, ROBERT JOSEPH works in Art Unit 2835 and has examined 1,501 patent applications in our dataset. With an allowance rate of 79.1%, this examiner has a below-average tendency to allow applications. Applications typically reach final disposition in approximately 23 months.
Examiner HOFFBERG, ROBERT JOSEPH's allowance rate of 79.1% places them in the 40% percentile among all USPTO examiners. This examiner has a below-average tendency to allow applications.
On average, applications examined by HOFFBERG, ROBERT JOSEPH receive 1.23 office actions before reaching final disposition. This places the examiner in the 21% percentile for office actions issued. This examiner issues significantly fewer office actions than most examiners.
The median time to disposition (half-life) for applications examined by HOFFBERG, ROBERT JOSEPH is 23 months. This places the examiner in the 76% percentile for prosecution speed. Applications move through prosecution relatively quickly with this examiner.
Conducting an examiner interview provides a +13.8% benefit to allowance rate for applications examined by HOFFBERG, ROBERT JOSEPH. This interview benefit is in the 55% percentile among all examiners. Recommendation: Interviews provide an above-average benefit with this examiner and are worth considering.
When applicants file an RCE with this examiner, 34.4% of applications are subsequently allowed. This success rate is in the 71% percentile among all examiners. Strategic Insight: RCEs show above-average effectiveness with this examiner. Consider whether your amendments or new arguments are strong enough to warrant an RCE versus filing a continuation.
This examiner enters after-final amendments leading to allowance in 22.5% of cases where such amendments are filed. This entry rate is in the 21% percentile among all examiners. Strategic Recommendation: This examiner rarely enters after-final amendments compared to other examiners. You should generally plan to file an RCE or appeal rather than relying on after-final amendment entry. Per MPEP § 714.12, primary examiners have discretion in entering after-final amendments, and this examiner exercises that discretion conservatively.
When applicants request a pre-appeal conference (PAC) with this examiner, 60.0% result in withdrawal of the rejection or reopening of prosecution. This success rate is in the 48% percentile among all examiners. Note: Pre-appeal conferences show below-average success with this examiner. Consider whether your arguments are strong enough to warrant a PAC request.
This examiner withdraws rejections or reopens prosecution in 58.6% of appeals filed. This is in the 28% percentile among all examiners. Of these withdrawals, 41.2% occur early in the appeal process (after Notice of Appeal but before Appeal Brief). Strategic Insight: This examiner shows below-average willingness to reconsider rejections during appeals. Be prepared to fully prosecute appeals if filed.
When applicants file petitions regarding this examiner's actions, 69.8% are granted (fully or in part). This grant rate is in the 87% percentile among all examiners. Strategic Note: Petitions are frequently granted regarding this examiner's actions compared to other examiners. Per MPEP § 1002.02(c), various examiner actions are petitionable to the Technology Center Director, including prematureness of final rejection, refusal to enter amendments, and requirement for information. If you believe an examiner action is improper, consider filing a petition.
Examiner's Amendments: This examiner makes examiner's amendments in 15.9% of allowed cases (in the 98% percentile). Per MPEP § 1302.04, examiner's amendments are used to place applications in condition for allowance when only minor changes are needed. This examiner frequently uses this tool compared to other examiners, indicating a cooperative approach to getting applications allowed. Strategic Insight: If you are close to allowance but minor claim amendments are needed, this examiner may be willing to make an examiner's amendment rather than requiring another round of prosecution.
Quayle Actions: This examiner issues Ex Parte Quayle actions in 7.2% of allowed cases (in the 84% percentile). Per MPEP § 714.14, a Quayle action indicates that all claims are allowable but formal matters remain. This examiner frequently uses Quayle actions compared to other examiners, which is a positive indicator that once substantive issues are resolved, allowance follows quickly.
Based on the statistical analysis of this examiner's prosecution patterns, here are tailored strategic recommendations:
Not Legal Advice: The information provided in this report is for informational purposes only and does not constitute legal advice. You should consult with a qualified patent attorney or agent for advice specific to your situation.
No Guarantees: We do not provide any guarantees as to the accuracy, completeness, or timeliness of the statistics presented above. Patent prosecution statistics are derived from publicly available USPTO data and are subject to data quality limitations, processing errors, and changes in USPTO practices over time.
Limitation of Liability: Under no circumstances will IronCrow AI be liable for any outcome, decision, or action resulting from your reliance on the statistics, analysis, or recommendations presented in this report. Past prosecution patterns do not guarantee future results.
Use at Your Own Risk: While we strive to provide accurate and useful prosecution statistics, you should independently verify any information that is material to your prosecution strategy and use your professional judgment in all patent prosecution matters.