Detailed information about the 100 most recent patent applications.
| Application Number | Title | Filing Date | Disposal Date | Disposition | Time (months) | Office Actions | Restrictions | Interview | Appeal |
|---|---|---|---|---|---|---|---|---|---|
| 19198129 | DATA TRANSMISSION/RECEPTION METHOD, DEVICE, AND SYSTEM IN WIRELESS COMMUNICATION SYSTEM | May 2025 | June 2025 | Allow | 2 | 0 | 0 | No | No |
| 19092697 | Shared Channel Occupancy in Sidelink Unlicensed | March 2025 | May 2025 | Allow | 2 | 0 | 0 | No | No |
| 19080165 | Sidelink Carrier Selection Based on Channel Busy Ratio | March 2025 | March 2026 | Allow | 12 | 2 | 0 | Yes | No |
| 18926476 | Sidelink Radio Link Failure Based on Carrier Reselection | October 2024 | December 2024 | Allow | 2 | 0 | 0 | No | No |
| 18750397 | PRECONFIGURED UPLINK RESOURCE TECHNIQUES IN WIRELESS COMMUNICATIONS | June 2024 | October 2025 | Allow | 16 | 2 | 0 | No | No |
| 18671651 | METHOD FOR COMMUNICATION AND TERMINAL DEVICE | May 2024 | November 2025 | Allow | 18 | 1 | 0 | No | No |
| 18653143 | ROBUST GRANT-FREE TRANSMISSIONS | May 2024 | January 2025 | Allow | 9 | 0 | 0 | No | No |
| 18640872 | Activation and Deactivation of Power Saving Operation | April 2024 | April 2025 | Allow | 12 | 0 | 0 | Yes | No |
| 18629687 | RELAYING PHYSICAL SIDELINK CONTROL CHANNEL RESOURCES | April 2024 | October 2024 | Allow | 7 | 0 | 0 | Yes | No |
| 18604904 | DATA TRANSMISSION METHOD AND TERMINAL DEVICE | March 2024 | January 2025 | Allow | 10 | 1 | 0 | No | No |
| 18604428 | COMMUNICATION METHOD AND TERMINAL DEVICE | March 2024 | July 2024 | Allow | 4 | 0 | 0 | Yes | No |
| 18586567 | METHOD FOR PERFORMING SIDELINK COMMUNICATION, AND DEVICE THEREFOR | February 2024 | August 2024 | Allow | 5 | 1 | 0 | No | No |
| 18438616 | Signal Reception Apparatus and Method and Communications System | February 2024 | August 2024 | Allow | 7 | 0 | 0 | Yes | No |
| 18426122 | SEQUENCE NUMBER EXPANSION | January 2024 | February 2026 | Allow | 25 | 4 | 0 | No | No |
| 18425889 | METHODS AND APPARATUSES FOR INFORMATION TRANSMISSION AND INFORMATION RECEPTION | January 2024 | November 2025 | Allow | 22 | 2 | 1 | Yes | No |
| 18532205 | METHOD AND APPARATUS FOR MANAGING INFORMATION IN A WIRELESS COMMUNICATION SYSTEM | December 2023 | October 2024 | Allow | 10 | 0 | 0 | Yes | No |
| 18525755 | REDUCED SENSING SCHEMES FOR SIDELINK ENHANCEMENT | November 2023 | March 2025 | Allow | 16 | 1 | 1 | Yes | No |
| 18522008 | TIMING ADVANCE OFFSET FOR UPLINK-DOWNLINK SWITCHING IN NEW RADIO | November 2023 | July 2024 | Allow | 7 | 0 | 0 | Yes | No |
| 18509677 | DATA TRANSMISSION METHOD, APPARATUS, AND SYSTEM | November 2023 | May 2025 | Allow | 18 | 2 | 0 | Yes | No |
| 18503931 | TERMINAL, BASE STATION, AND COMMUNICATION METHOD | November 2023 | May 2024 | Allow | 7 | 0 | 0 | Yes | No |
| 18289700 | METHOD AND DEVICE FOR SELECTING TRANSMISSION RESOURCE ON BASIS OF SL DRX HARQ RTT TIMER OPERATION OF RECEPTION DEVICE IN NR V2X | November 2023 | November 2025 | Allow | 24 | 0 | 0 | No | No |
| 18386275 | INTER-DEVICE COORDINATION METHOD AND APPARATUS | November 2023 | February 2026 | Allow | 27 | 0 | 0 | No | No |
| 18386177 | METHOD FOR DETERMINING REFERENCE RESOURCE, FIRST TERMINAL AND STORAGE MEDIUM | November 2023 | March 2026 | Allow | 28 | 1 | 0 | No | No |
| 18486538 | CONFIGURING AN ACKNOWLEDGEMENT/NEGATIVE ACKNOWLEDGEMENT TRANSMISSION USING A PHYSICAL SIDELINK FEEDBACK CHANNEL IN UNLICENSED SPECTRUM | October 2023 | January 2026 | Allow | 27 | 1 | 0 | Yes | No |
| 18482355 | METHOD AND APPARATUS FOR DECODING CONTROL INFORMATION IN WIRELESS COMMUNICATION SYSTEM | October 2023 | May 2024 | Allow | 8 | 0 | 0 | Yes | No |
| 18471140 | REFERENCE SIGNAL DESIGNS FOR MULTIPLE ACCESS IN UPLINK | October 2023 | March 2026 | Allow | 29 | 0 | 1 | No | No |
| 18284737 | METHOD PERFORMED BY USER EQUIPMENT, AND USER EQUIPMENT | September 2023 | January 2026 | Allow | 28 | 1 | 0 | No | No |
| 18552720 | METHOD AND APPARATUSES FOR NR SIDELINK DISCONTINUOUS RECEPTION | September 2023 | October 2025 | Allow | 25 | 0 | 0 | Yes | No |
| 18550609 | QUASI-COLOCATION AND AUTOMATIC GAIN CONTROL DETERMINATION FOR MULTI-RELAY SIDELINK COMMUNICATIONS | September 2023 | September 2025 | Allow | 24 | 0 | 0 | No | No |
| 18367587 | Resource Reservation for Sidelink Communications | September 2023 | September 2024 | Allow | 13 | 1 | 0 | Yes | No |
| 18244649 | Systems and Methods of Operating with Different Transmission Time Interval (TTI) Durations | September 2023 | February 2025 | Allow | 18 | 3 | 0 | Yes | No |
| 18464585 | SIDELINK RESOURCE REMOVAL | September 2023 | September 2025 | Allow | 25 | 0 | 0 | No | No |
| 18242866 | METHOD AND APPARATUS FOR SUPPORTING UNICAST LINK ESTABLISHMENT FOR SIDELINK POSITIONING IN A WIRELESS COMMUNICATION SYSTEM | September 2023 | September 2024 | Allow | 13 | 3 | 0 | Yes | No |
| 18456771 | CONTROL SIGNALING FOR WIRELESS COMMUNICATION | August 2023 | November 2024 | Abandon | 15 | 1 | 0 | No | No |
| 18455448 | Sidelink Control Information Processing | August 2023 | November 2024 | Allow | 15 | 2 | 0 | Yes | No |
| 18453380 | SIDELINK CONTROL INFORMATION STAGE 2 FORMAT | August 2023 | March 2025 | Allow | 19 | 1 | 1 | Yes | No |
| 18450316 | TRANSMITTER, RECEIVER, TRANSMISSION METHOD, AND RECEPTION METHOD | August 2023 | March 2024 | Allow | 7 | 0 | 0 | Yes | No |
| 18546571 | SUPERPOSITION TRANSMISSION TECHNIQUES IN SIDELINK COMMUNICATIONS | August 2023 | October 2025 | Allow | 26 | 0 | 0 | No | No |
| 18365841 | NULL DATA PACKET ANNOUNCEMENT FRAME TRANSMISSION METHOD AND RELATED APPARATUS | August 2023 | November 2023 | Allow | 3 | 0 | 0 | No | No |
| 18214670 | METHOD AND DEVICE FOR RESELECTING SIDELINK TRANSMISSION RESOURCE IN NR V2X | June 2023 | August 2023 | Allow | 2 | 0 | 0 | No | No |
| 18337649 | METHOD AND DEVICE FOR PERFORMING SL DRX OPERATION ON BASIS OF HARQ FEEDBACK IN NR V2X | June 2023 | September 2023 | Allow | 3 | 0 | 0 | Yes | No |
| 17769639 | METHOD AND DEVICE FOR RESELECTING SIDELINK RESOURCES IN NR V2X | May 2023 | July 2023 | Allow | 15 | 0 | 0 | No | No |
| 18314720 | NETWORK DISCOVERY IN AN AUTOCONFIGURED BACKHAUL TRANSCEIVER | May 2023 | April 2025 | Abandon | 23 | 2 | 0 | No | No |
| 18192036 | UE OPERATION METHOD RELATED TO SIDELINK PTRS IN WIRELESS COMMUNICATION SYSTEM | March 2023 | January 2024 | Allow | 10 | 0 | 0 | Yes | No |
| 18190014 | COMMUNICATION METHOD AND TERMINAL DEVICE | March 2023 | January 2024 | Allow | 10 | 1 | 0 | No | No |
| 18169456 | METHOD AND DEVICE FOR PERFORMING SL COMMUNICATION IN NR V2X ON BASIS OF AUXILIARY INFORMATION | February 2023 | May 2023 | Allow | 3 | 0 | 0 | Yes | No |
| 18158058 | METHOD AND DEVICE FOR PERFORMING SL COMMUNICATION ON BASIS OF ASSISTANCE INFORMATION IN NR V2X | January 2023 | May 2023 | Allow | 3 | 0 | 0 | No | No |
| 18096642 | METHOD AND APPARATUS FOR DETERMINING NDI VALUE ON SCI IN NR V2X | January 2023 | April 2023 | Allow | 3 | 0 | 0 | Yes | No |
| 18152688 | TRANSMITTER, RECEIVER, TRANSMISSION METHOD, AND RECEPTION METHOD | January 2023 | May 2023 | Allow | 4 | 0 | 0 | Yes | No |
| 18094563 | NETWORKS FOR PACKET MONITORING AND REPLAY | January 2023 | April 2024 | Allow | 15 | 2 | 0 | No | No |
| 18147534 | ROBUST GRANT-FREE TRANSMISSIONS | December 2022 | February 2024 | Allow | 13 | 2 | 0 | Yes | No |
| 18062611 | HYBRID AUTOMATIC REPEAT REQUEST FEEDBACK FOR OUTER LOOP ADAPTATION FOR 5G OR OTHER NEXT GENERATION NETWORK | December 2022 | May 2024 | Allow | 17 | 0 | 0 | Yes | No |
| 17992705 | NULL DATA PACKET ANNOUNCEMENT FRAME TRANSMISSION METHOD AND RELATED APPARATUS | November 2022 | August 2025 | Allow | 43 | 2 | 0 | No | No |
| 17987371 | METHOD AND DEVICE FOR RESELECTING SIDELINK TRANSMISSION RESOURCE IN NR V2X | November 2022 | March 2023 | Allow | 4 | 0 | 0 | No | No |
| 17986105 | Downlink Monitoring Using Search Space Sets | November 2022 | July 2025 | Allow | 32 | 4 | 0 | Yes | No |
| 17986170 | Beam Failure Recovery In A Power Saving Operation | November 2022 | July 2025 | Allow | 33 | 5 | 0 | Yes | No |
| 17979292 | METHOD AND APPARATUS FOR TRANSMITTING REFERENCE SIGNAL IN MULTI-ANTENNA SYSTEM | November 2022 | February 2023 | Allow | 4 | 0 | 0 | Yes | No |
| 17970047 | RESOURCE ALLOCATION METHOD AND TERMINAL | October 2022 | August 2025 | Allow | 34 | 1 | 0 | No | No |
| 17967942 | COMMUNICATION DEVICES AND METHODS WITH BEAMFORMING TRAINING | October 2022 | March 2025 | Allow | 29 | 1 | 0 | Yes | No |
| 17960764 | APPLICATION PROGRAMMING INTERFACE TO INDICATE A DEVICE IN A CORE NETWORK TO SHARE INFORMATION WITH A DEVICE IN AN ACCESS NETWORK | October 2022 | October 2025 | Allow | 36 | 1 | 0 | Yes | No |
| 17930639 | ASYNCHRONOUS MULTI-POINT TRANSMISSION SCHEMES | September 2022 | March 2023 | Allow | 7 | 0 | 0 | Yes | No |
| 17905014 | WIRELESS COMMUNICATION DEVICE SYNCHRONIZATION | August 2022 | March 2026 | Allow | 43 | 1 | 0 | Yes | No |
| 17885801 | FREQUENCY RESOURCE CONFIGURATIONS IN FULL-DUPLEX NETWORKS | August 2022 | November 2025 | Allow | 39 | 0 | 1 | No | No |
| 17797863 | Configuration for UE Energy Consumption Reduction Features | August 2022 | August 2025 | Allow | 36 | 1 | 1 | Yes | No |
| 17817035 | BACKHAULING OF TRAFFIC FROM 3GPP AND NON-3GPP BASED RADIO ACCESS TECHNOLOGIES VIA NEW RADIO INTEGRATED ACCESS BACKHAUL FOR 5G OR OTHER NEXT GENERATION NETWORK | August 2022 | March 2023 | Allow | 8 | 0 | 0 | Yes | No |
| 17876772 | CELLULAR NETWORK CHAOS SIMULATION | July 2022 | September 2024 | Allow | 25 | 0 | 0 | No | No |
| 17877161 | METHOD OF FAST BEAM REFINEMENT AND TRACKING FOR HIGH MOBILITY WIRELESS COMMUNICATION DEVICE | July 2022 | October 2025 | Allow | 39 | 1 | 0 | Yes | No |
| 17815635 | Circuit and Method for Timestamp Jitter Reduction | July 2022 | May 2025 | Allow | 33 | 0 | 0 | Yes | No |
| 17871304 | METHOD AND APPARATUS FOR DECODING CONTROL INFORMATION IN WIRELESS COMMUNICATION SYSTEM | July 2022 | June 2023 | Allow | 10 | 1 | 0 | Yes | No |
| 17812820 | METHOD AND APPARATUS FOR PERFORMING WIRELESS COMMUNICATION BASED ON SL RESOURCE IN NR V2X | July 2022 | November 2023 | Allow | 16 | 0 | 0 | Yes | No |
| 17859814 | MULTI-LINK COMMUNICATION METHOD, APPARATUS, AND SYSTEM | July 2022 | December 2024 | Allow | 30 | 1 | 0 | No | No |
| 17758326 | METHOD AND APPARATUS FOR REPEATEDLY TRANSMITTING UPLINK CHANNEL IN WIRELESS COMMUNICATION SYSTEM | July 2022 | August 2024 | Allow | 26 | 0 | 0 | No | No |
| 17853420 | METHOD FOR SWITCHING TRANSMISSION MODE AND CORE NETWORK ELEMENT | June 2022 | August 2025 | Abandon | 38 | 1 | 1 | No | No |
| 17809472 | UE OPERATION METHOD RELATED TO SIDELINK PTRS IN WIRELESS COMMUNICATION SYSTEM | June 2022 | January 2023 | Allow | 6 | 0 | 0 | Yes | No |
| 17757992 | CHANNEL STATE INFORMATION REPORT FOR BUNDLED DOWNLINK SHARED CHANNEL | June 2022 | December 2025 | Allow | 42 | 2 | 0 | Yes | No |
| 17846958 | Radio Bearer Configuration Method, Apparatus, and System | June 2022 | January 2023 | Allow | 7 | 0 | 0 | Yes | No |
| 17842626 | ZERO-COPY FORWARDING FOR NETWORK FUNCTION VIRTUALIZATION | June 2022 | April 2025 | Allow | 34 | 0 | 0 | Yes | No |
| 17785333 | COMMUNICATION DEVICE AND METHOD | June 2022 | June 2025 | Allow | 36 | 1 | 0 | No | No |
| 17806716 | METHOD AND APPARATUS FOR CHANNEL ENVIRONMENT CLASSIFICATION | June 2022 | September 2025 | Allow | 39 | 2 | 1 | Yes | No |
| 17756841 | Machine Learning-Based Beam Selection | June 2022 | January 2026 | Allow | 44 | 2 | 1 | No | No |
| 17831751 | COMMUNICATION APPARATUS, TERMINAL DEVICE, AND COMMUNICATION METHOD | June 2022 | March 2026 | Allow | 46 | 2 | 1 | No | No |
| 17832006 | Resource Reservation for Sidelink Communications | June 2022 | April 2023 | Allow | 10 | 1 | 0 | Yes | No |
| 17831123 | Data Stream Processing Method and Apparatus | June 2022 | March 2025 | Allow | 34 | 0 | 1 | Yes | No |
| 17755771 | COMMUNICATION DEVICE | May 2022 | April 2025 | Allow | 36 | 2 | 0 | No | No |
| 17733677 | APPARATUS AND METHOD FOR ALLOCATING RESOURCE AND TRANSMITTING/RECEIVING RESOURCE ALLOCATION INFORMATION IN COMMUNICATION SYSTEM SUPPORTING DEVICE TO DEVICE SCHEME | April 2022 | February 2023 | Allow | 9 | 0 | 0 | Yes | No |
| 17721972 | ROUND TRIP TIME (RTT) POSITIONING AND TIMING ADVANCE (TA) COMMAND WITH USER EQUIPMENT RX TX MEASUREMENT REPORTING | April 2022 | November 2024 | Allow | 31 | 1 | 0 | No | No |
| 17710211 | ELECTRONIC DEVICE FOR SELECTING CELL, AND METHOD THEREFOR | March 2022 | February 2025 | Allow | 34 | 1 | 1 | Yes | No |
| 17706998 | METHOD AND APPARATUS FOR PERFORMING PSFCH TRANSMISSION IN NR V2X | March 2022 | October 2023 | Allow | 19 | 3 | 0 | Yes | No |
| 17754304 | METHOD AND APPARATUS FOR RANDOM ACCESS PROCEDURE | March 2022 | March 2025 | Allow | 36 | 3 | 0 | No | No |
| 17705138 | SIDELINK CONFIGURATION METHOD AND APPARATUS, DEVICE, AND STORAGE MEDIUM | March 2022 | May 2025 | Abandon | 38 | 2 | 0 | Yes | No |
| 17705097 | RESOURCE CONFIGURATION METHOD AND APPARATUS, DEVICE, AND STORAGE MEDIUM | March 2022 | April 2025 | Allow | 36 | 1 | 1 | Yes | No |
| 17700751 | BROADCAST SIGNAL TRANSMISSION APPARATUS USING TRANSMISSION IDENTIFIER SCALED WITH 4-BIT INJECTION LEVEL CODE AND METHOD USING SAME | March 2022 | March 2023 | Allow | 12 | 0 | 0 | Yes | No |
| 17639179 | TRANSMISSION RESOURCE ADJUSTMENT METHOD AND DEVICE | February 2022 | June 2025 | Allow | 39 | 1 | 1 | Yes | No |
| 17680638 | METHOD AND APPARATUS FOR DETERMINING NDI VALUE ON SCI IN NR V2X | February 2022 | October 2022 | Allow | 7 | 1 | 0 | Yes | No |
| 17675205 | APPARATUS AND METHOD FOR TRACKING SYNCHRONIZATION IN WIRELESS COMMUNICATION SYSTEM | February 2022 | March 2023 | Allow | 13 | 1 | 0 | Yes | No |
| 17651655 | System and Method for Always On Connections in Wireless Communications System | February 2022 | July 2024 | Allow | 29 | 4 | 0 | Yes | No |
| 17670286 | INFORMATION SENDING METHOD, INFORMATION RECEIVING METHOD, TERMINAL, AND CONTROL NODE | February 2022 | May 2025 | Allow | 39 | 2 | 0 | Yes | No |
| 17592935 | METHOD AND SYSTEM FOR DYNAMIC ACCESS POINT SELECTION IN COORDINATED ACCESS POINT GROUP | February 2022 | November 2023 | Allow | 22 | 2 | 0 | Yes | No |
| 17573740 | METHOD FOR TRANSMITTING/RECEIVING DOWNLINK CHANNEL IN WIRELESS COMMUNICATION SYSTEM, AND DEVICE THEREFOR | January 2022 | December 2022 | Allow | 11 | 2 | 0 | Yes | No |
| 17625858 | COMMUNICATION SYSTEM | January 2022 | August 2024 | Allow | 31 | 1 | 0 | Yes | No |
This analysis examines appeal outcomes and the strategic value of filing appeals for examiner NGO, NGUYEN HOANG.
With a 25.9% reversal rate, the PTAB affirms the examiner's rejections in the vast majority of cases. This reversal rate is below the USPTO average, indicating that appeals face more challenges here than typical.
Filing a Notice of Appeal can sometimes lead to allowance even before the appeal is fully briefed or decided by the PTAB. This occurs when the examiner or their supervisor reconsiders the rejection during the mandatory appeal conference (MPEP § 1207.01) after the appeal is filed.
In this dataset, 19.7% of applications that filed an appeal were subsequently allowed. This appeal filing benefit rate is in the bottom 25% across the USPTO, indicating that filing appeals is less effective here than in most other areas.
⚠ Appeals to PTAB face challenges. Ensure your case has strong merit before committing to full Board review.
⚠ Filing a Notice of Appeal shows limited benefit. Consider other strategies like interviews or amendments before appealing.
Examiner NGO, NGUYEN HOANG works in Art Unit 2473 and has examined 594 patent applications in our dataset. With an allowance rate of 83.2%, this examiner has an above-average tendency to allow applications. Applications typically reach final disposition in approximately 31 months.
Examiner NGO, NGUYEN HOANG's allowance rate of 83.2% places them in the 57% percentile among all USPTO examiners. This examiner has an above-average tendency to allow applications.
On average, applications examined by NGO, NGUYEN HOANG receive 2.25 office actions before reaching final disposition. This places the examiner in the 63% percentile for office actions issued. This examiner issues a slightly above-average number of office actions.
The median time to disposition (half-life) for applications examined by NGO, NGUYEN HOANG is 31 months. This places the examiner in the 55% percentile for prosecution speed. Prosecution timelines are slightly faster than average with this examiner.
Conducting an examiner interview provides a +15.4% benefit to allowance rate for applications examined by NGO, NGUYEN HOANG. This interview benefit is in the 55% percentile among all examiners. Recommendation: Interviews provide an above-average benefit with this examiner and are worth considering.
When applicants file an RCE with this examiner, 24.7% of applications are subsequently allowed. This success rate is in the 37% percentile among all examiners. Strategic Insight: RCEs show below-average effectiveness with this examiner. Carefully evaluate whether an RCE or continuation is the better strategy.
This examiner enters after-final amendments leading to allowance in 27.2% of cases where such amendments are filed. This entry rate is in the 38% percentile among all examiners. Strategic Recommendation: This examiner shows below-average receptiveness to after-final amendments. You may need to file an RCE or appeal rather than relying on after-final amendment entry.
When applicants request a pre-appeal conference (PAC) with this examiner, 54.1% result in withdrawal of the rejection or reopening of prosecution. This success rate is in the 47% percentile among all examiners. Note: Pre-appeal conferences show below-average success with this examiner. Consider whether your arguments are strong enough to warrant a PAC request.
This examiner withdraws rejections or reopens prosecution in 56.5% of appeals filed. This is in the 29% percentile among all examiners. Of these withdrawals, 45.7% occur early in the appeal process (after Notice of Appeal but before Appeal Brief). Strategic Insight: This examiner shows below-average willingness to reconsider rejections during appeals. Be prepared to fully prosecute appeals if filed.
When applicants file petitions regarding this examiner's actions, 53.7% are granted (fully or in part). This grant rate is in the 54% percentile among all examiners. Strategic Note: Petitions show above-average success regarding this examiner's actions. Petitionable matters include restriction requirements (MPEP § 1002.02(c)(2)) and various procedural issues.
Examiner's Amendments: This examiner makes examiner's amendments in 3.2% of allowed cases (in the 80% percentile). Per MPEP § 1302.04, examiner's amendments are used to place applications in condition for allowance when only minor changes are needed. This examiner frequently uses this tool compared to other examiners, indicating a cooperative approach to getting applications allowed. Strategic Insight: If you are close to allowance but minor claim amendments are needed, this examiner may be willing to make an examiner's amendment rather than requiring another round of prosecution.
Quayle Actions: This examiner issues Ex Parte Quayle actions in 0.0% of allowed cases (in the 21% percentile). This examiner rarely issues Quayle actions compared to other examiners. Allowances typically come directly without a separate action for formal matters.
Based on the statistical analysis of this examiner's prosecution patterns, here are tailored strategic recommendations:
Not Legal Advice: The information provided in this report is for informational purposes only and does not constitute legal advice. You should consult with a qualified patent attorney or agent for advice specific to your situation.
No Guarantees: We do not provide any guarantees as to the accuracy, completeness, or timeliness of the statistics presented above. Patent prosecution statistics are derived from publicly available USPTO data and are subject to data quality limitations, processing errors, and changes in USPTO practices over time.
Limitation of Liability: Under no circumstances will IronCrow AI be liable for any outcome, decision, or action resulting from your reliance on the statistics, analysis, or recommendations presented in this report. Past prosecution patterns do not guarantee future results.
Use at Your Own Risk: While we strive to provide accurate and useful prosecution statistics, you should independently verify any information that is material to your prosecution strategy and use your professional judgment in all patent prosecution matters.